<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0" xmlns:cc="http://cyber.law.harvard.edu/rss/creativeCommonsRssModule.html">
    <channel>
        <title><![CDATA[Stories by Bike East Bay on Medium]]></title>
        <description><![CDATA[Stories by Bike East Bay on Medium]]></description>
        <link>https://medium.com/@BikeEastBay?source=rss-20270b245c03------2</link>
        <image>
            <url>https://cdn-images-1.medium.com/fit/c/150/150/1*H3EdceK0zwRwmUAO6iiGPA.jpeg</url>
            <title>Stories by Bike East Bay on Medium</title>
            <link>https://medium.com/@BikeEastBay?source=rss-20270b245c03------2</link>
        </image>
        <generator>Medium</generator>
        <lastBuildDate>Tue, 24 Nov 2026 14:12:34 GMT</lastBuildDate>
        <atom:link href="https://medium.com/@BikeEastBay/feed" rel="self" type="application/rss+xml"/>
        <webMaster><![CDATA[yourfriends@medium.com]]></webMaster>
        <atom:link href="http://medium.superfeedr.com/" rel="hub"/>
        <item>
            <title><![CDATA[Our Multimodal San Pablo Ave Campaign Moves Forward]]></title>
            <link>https://medium.com/rideon/our-multimodal-san-pablo-ave-campaign-moves-forward-f1db8fee2d10?source=rss-20270b245c03------2</link>
            <guid isPermaLink="false">https://medium.com/p/f1db8fee2d10</guid>
            <dc:creator><![CDATA[Bike East Bay]]></dc:creator>
            <pubDate>Fri, 18 Aug 2023 16:26:43 GMT</pubDate>
            <atom:updated>2023-08-18T16:26:43.301Z</atom:updated>
            <content:encoded><![CDATA[<p>Envision a more people-oriented street</p><p>By Robert Prinz</p><p>San Pablo Avenue is among the most significant roads in the East Bay, a hub for transportation, commerce, and culture that runs 22 miles through two counties and a dozen cities. Combined, the Line 72 bus routes on San Pablo have the highest ridership in the entire AC Transit system. And yet the majority of the corridor remains inaccessible and hazardous to people walking and rolling due to fast vehicle traffic and the lack of protected, people-oriented infrastructure, and buses are frequently delayed behind backed-up car traffic.</p><p>We need to change that. Our Multimodal San Pablo Avenue campaign envisions thriving communities and continuous, low-stress and all-ages bicycle and pedestrian facilities from Downtown Oakland all the way north to the Carquinez Bridge. This movement is already in progress, via many plans and projects. Read about a few of these below, then visit <a href="http://bikeeastbay.org/SanPabloAve">BikeEastBay.org/SanPabloAve</a> for our interactive map with complete details and updates.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*fKqv4ioHzH0sFFuB-pt9RA.jpeg" /><figcaption>Graphic courtesy of Alameda County Transportation Commission, San Pablo Avenue Corridor Project</figcaption></figure><h3>San Pablo Ave Bus and Bike Lanes (Oakland, Emeryville, and South Berkeley)</h3><p>This project extends 3.5-miles along San Pablo Ave from 16th Street in Oakland to Heinz Avenue in Berkeley, including protected bikeways, bike/walk crossing improvements, dedicated bus lanes, and bus stop amenities/streetscape improvements. It is currently in the planning stages with construction estimated to start in 2026.</p><h3>Parallel Bike and Walk Improvements (Berkeley, Albany, and North Oakland)</h3><p>“Parallel” neighborhood bikeway upgrades including traffic calming and car diverters are planned from Russell Street in Berkeley to Marin Ave in Albany, along with signalized bike boulevard crossings of San Pablo Ave and other major streets. This project is in the late planning stages and construction is estimated to start in mid-2024.</p><p>Unfortunately dedicated bus and bike lanes on San Pablo were blocked via an earlier effort, but we aren’t giving up and will continue advocating beyond this project.</p><h3>Del Norte Protected Bikeways (El Cerrito)</h3><p>This half-mile of protected bikeway with bus upgrades will provide a critical connection from Potrero Ave to Knott Ave around Del Norte BART, as well as a protected connection to Richmond on Cutting Blvd past I-80. Construction is estimated to start in 2023.</p><h3>San Pablo Ave Bay Trail (Rodeo to Crockett)</h3><p>This project will construct a two-way protected cycletrack on San Pablo Ave closing a 3-mile gap in the Bay Trail between Lone Tree Point and the Carquinez Bridge. Construction is estimated to start in 2026.</p><p>Join us at campaign coordination gatherings along the corridor throughout the summer and fall where we will enjoy some great food at local businesses, discuss project updates and strategies, and end with a short walk to identify existing uses and needs while envisioning the future of San Pablo Avenue.</p><p>Visit <a href="http://bikeeastbay.org/SanPabloAve">BikeEastBay.org/SanPabloAve</a> and register to participate, or sign up for our campaign email list to be notified about news and activities.</p><h3>RideOn is Bike East Bay’s regular member magazine. Learn more and join the movement: <a href="http://bikeeastbay.org/Join">BikeEastBay.org/Join</a></h3><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=f1db8fee2d10" width="1" height="1" alt=""><hr><p><a href="https://medium.com/rideon/our-multimodal-san-pablo-ave-campaign-moves-forward-f1db8fee2d10">Our Multimodal San Pablo Ave Campaign Moves Forward</a> was originally published in <a href="https://medium.com/rideon">RideOn</a> on Medium, where people are continuing the conversation by highlighting and responding to this story.</p>]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Big Things Are Happening in Bike Education]]></title>
            <link>https://medium.com/rideon/big-things-are-happening-in-bike-education-79033bdfba09?source=rss-20270b245c03------2</link>
            <guid isPermaLink="false">https://medium.com/p/79033bdfba09</guid>
            <dc:creator><![CDATA[Bike East Bay]]></dc:creator>
            <pubDate>Fri, 18 Aug 2023 16:20:42 GMT</pubDate>
            <atom:updated>2023-08-18T16:20:42.171Z</atom:updated>
            <content:encoded><![CDATA[<p>Celebrating milestones and reflecting upon our impact</p><p>By Jill Holloway &amp; Dani Solis</p><p>In April of this year our bike education program hit a huge milestone: 25,000 class participants since 2011! We couldn’t have done it without our amazing bike education team, past and present. Learn about what the program has meant to class participants by reading below!</p><h3>Bike Builds</h3><p>For the first time in many years, we held two youth bike builds where we built and gave away bikes to kids in underserved communities.</p><p>The first, in May, was in partnership with Waterside Workshops and the Multicultural Institute in Berkeley. Waterside Workshops assembled the bikes and at the event 13 kids rode away on their new Cleary bikes equipped with helmets, lights, bells, and a patch kit!</p><p>In June we held a second bike build in partnership with the Lincoln Square Recreation Center in Oakland. At this event, seven bike education instructors and staff assembled bikes in the morning. In addition to receiving a new Cleary bike, 20 kids were able to practice their bike skills in a kids bike rodeo in the afternoon. Many of the kids are keeping their bikes at the Center for the summer to continue to practice and have fun on their new bikes.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*EmGakB6rrRIiAdfq6a9htA.jpeg" /><figcaption>A group of League-Certified bike education instructors work on building Cleary bikes for youth participants at Lincoln Recreation Center in Oakland.</figcaption></figure><h3>Kids Bike Fleet</h3><p>At the end of 2022 we received a generous donation from Cleary Bikes to upgrade our kids’ bike fleet. We put these new bikes to the ultimate test in June at the Concord KidFest. Over two days our instructors engaged with 75 kids learning to ride or strengthen their bike skills. We heard some great feedback from parents: “Great job with instruction. We have had a hard time instructing our daughter how to ride without training wheels.”</p><h3>E-Bike Curriculum &amp; Classes</h3><p>In partnership with Waterside Workshops, we developed a new one hour workshop: e-Bike Safety. We piloted the new curriculum with the Berkeley E-Bike Equity Project, which Waterside Workshops is a part of. To date we have engaged over 90 community members in learning how to operate and maintain e-bikes.</p><h3>RideOn is Bike East Bay’s regular member magazine. Learn more and join the movement: <a href="http://bikeeastbay.org/Join">BikeEastBay.org/Join</a></h3><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=79033bdfba09" width="1" height="1" alt=""><hr><p><a href="https://medium.com/rideon/big-things-are-happening-in-bike-education-79033bdfba09">Big Things Are Happening in Bike Education</a> was originally published in <a href="https://medium.com/rideon">RideOn</a> on Medium, where people are continuing the conversation by highlighting and responding to this story.</p>]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Letter from the Saddle]]></title>
            <link>https://medium.com/rideon/letter-from-the-saddle-3f277849cc9?source=rss-20270b245c03------2</link>
            <guid isPermaLink="false">https://medium.com/p/3f277849cc9</guid>
            <dc:creator><![CDATA[Bike East Bay]]></dc:creator>
            <pubDate>Fri, 18 Aug 2023 16:18:35 GMT</pubDate>
            <atom:updated>2023-08-18T16:18:35.169Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*L7QiujfFmNoFURKC-3KmBw.jpeg" /></figure><p>We’re off to a rolling start this spring and summer with Bike to Work Day, the spring ride series, Climate Ride, a new website, Bike Education classes, Session Fest, and more!</p><p>Bike to Work day was an absolute blast. Whether you came to one of our 98 energizer stations throughout the East Bay, or joined us for the Old Oakland happy hour with Walk Oakland Bike Oakland, we want to thank you for riding and for your support. Over 1,300 of you pledged to ride, 6,000 of you picked up a keepsake bag, and Bike East Bay member Petrice even won a Rad Power bike!</p><p>Meanwhile, our bike education team hit a huge milestone this spring. (No spoilers, so turn to page 4 to see what it is!) Spring and summer are always a busy time for bike education and 2023 is on track to be our busiest year since before the pandemic with over 120 classes throughout the East Bay, completely for free.</p><p>This spring our advocacy team has been busy working with other advocates, including Traffic Violence Rapid Response, to secure funding for better street infrastructure and support for public transit. Together, we had a huge win in the Oakland city budget with increased funding for traffic safety upgrades and both the mayor and city council pushing for increased investment in safe streets. But we also felt some disappointment, most notably Hopkins Street in Berkeley where bike and pedestrian safety improvements were put on hold. We are frustrated given the time and effort put in by advocates and city staff to make Hopkins safe for everyone, especially when low-income and communities of color in West and South Berkeley have largely been neglected.</p><p>This fall we are excited to kick off our next phase of community engagement work on San Pablo Avenue. This corridor serves as a critical artery for many East Bay communities. It serves over 120,000 people daily and is home to small businesses, homes and countless community centers such as schools and churches. However, it is a dangerous place for people who walk and roll. We are excited to co-create a new San Pablo that puts people and communities first. Read more from Robert on pages 10–11 and look out for community engagement and volunteering opportunities coming up this fall. Check out the bottom of pages 10–11 where we highlight the work of two local advocacy groups.</p><p>Finally, get outside on some fun summer rides that you can access from transit on page 3 and join Phil for our Fall Ride series with the entire family.</p><p>See you at Biketopia on October 5!</p><p>Ride On,</p><p>Justin &amp; Jill</p><p>P.S. Don’t miss our <a href="https://bikeeastbay.org/wp-content/uploads/2023/08/Annual-Report-2022.pdf">2022 Annual Report</a>, where we celebrate last year’s progress and milestones and thank donors for making our work possible.</p><h3>RideOn is Bike East Bay’s regular member magazine. Learn more and join the movement: <a href="http://bikeeastbay.org/Join">BikeEastBay.org/Join</a></h3><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=3f277849cc9" width="1" height="1" alt=""><hr><p><a href="https://medium.com/rideon/letter-from-the-saddle-3f277849cc9">Letter from the Saddle</a> was originally published in <a href="https://medium.com/rideon">RideOn</a> on Medium, where people are continuing the conversation by highlighting and responding to this story.</p>]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Letter from the Saddle]]></title>
            <link>https://medium.com/rideon/letter-from-the-saddle-984eb2641618?source=rss-20270b245c03------2</link>
            <guid isPermaLink="false">https://medium.com/p/984eb2641618</guid>
            <dc:creator><![CDATA[Bike East Bay]]></dc:creator>
            <pubDate>Fri, 21 Apr 2023 19:43:43 GMT</pubDate>
            <atom:updated>2023-04-21T19:43:43.460Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*SYv7ssWKFzm47G-AfTiznQ.png" /></figure><p>As we emerge from a season of transition for Bike East Bay with the departures of our long time champions and friends, former executive director Ginger Jui, and Advocacy Director Dave Campbell, we would like to introduce ourselves as your two new Co-Executive Directors, Jill and Justin.</p><p>Together we will be working collaboratively to continue the work of weaving mobility justice into the fabric of the organization and the work that we do. This shift is further instilling our core values of shared leadership and collaborative decision-making that are foundational to our organization’s culture.</p><p>In the past year we saw huge wins for safer, more connected streets, including protected bike lanes in Richmond on Cutting Blvd, in Fremont on Fremont Blvd, and in Berkeley with Milvia St. We also launched new environmental justice and community organizing trainings to further promote BIPOC leadership, which you can read more about on page 4. Finally, we took our education program to the next level with a cargo van purchase that helps us teach new skills to over 1,500 class participants for free.</p><p>This year, we will embark on a strategic planning process that will set the direction of the organization and guide our work over the coming years. We sit at the intersection of many important issues, including affordable housing, transit-rich communities, safe streets, and police reform. Building on our work around street safety and bicycle access, we want to continue developing a strategic vision and plan that centers the organization on building human infrastructure and community healing.</p><p>This year we will build community capacity through the recruitment and development of new League Cycling Instructors (LCIs) from all parts of our communities, who will teach bike education classes. You can learn about one LCI’s personal story on page 5. We will also focus on transforming corridors that connect our East Bay communities, such as the San Pablo Corridor, Bay Trail and East Bay Greenway.</p><p>With the rainy winter behind us, let’s dust off those bikes and get riding with tens of thousands this Bike to Work Day on May 18th: plan your Bike Month starting on page 6.</p><p>And, save the date for a special Richmond-San Rafael Bridge ride with the two of us scheduled for Saturday, June 24th from 9:00am-2:00pm.</p><p>See you out there on the road!</p><p>Ride On,</p><p>Justin &amp; Jill<br>Co-Executive Directors</p><h3>RideOn is Bike East Bay’s regular member magazine. Learn more and join the movement: <a href="http://bikeeastbay.org/Join">BikeEastBay.org/Join</a></h3><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=984eb2641618" width="1" height="1" alt=""><hr><p><a href="https://medium.com/rideon/letter-from-the-saddle-984eb2641618">Letter from the Saddle</a> was originally published in <a href="https://medium.com/rideon">RideOn</a> on Medium, where people are continuing the conversation by highlighting and responding to this story.</p>]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Climate Ride Spotlight]]></title>
            <link>https://medium.com/rideon/climate-ride-spotlight-50bdf956f9a?source=rss-20270b245c03------2</link>
            <guid isPermaLink="false">https://medium.com/p/50bdf956f9a</guid>
            <dc:creator><![CDATA[Bike East Bay]]></dc:creator>
            <pubDate>Fri, 21 Apr 2023 19:42:58 GMT</pubDate>
            <atom:updated>2023-04-21T19:42:58.394Z</atom:updated>
            <content:encoded><![CDATA[<p><strong>Tips from a first-timer</strong></p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*IQL-VGo_B4EmBvZxidguJA.jpeg" /></figure><p>By Jill Holloway</p><p>The 2022 Northern California Green Fondo was not only my first Climate Ride, but it was my first time riding a century. I started training in March for the event in May, before that the longest ride I had been on was 40 miles. I would highly recommend this event for everyone who’s even a little bit interested, even if you’re nervous about the distance. The Climate Ride team does an awesome job at organizing everything from the check-in to meals and snacks to the programming. I was really nervous going in because I didn’t know what to expect, but once I arrived at the campsite there were tons of people to ask questions and give encouragement. I felt so excited and prepared setting off in the morning for my century that almost all my nerves were gone.</p><p>In case you are still considering a Climate Ride this year, or maybe next year, here are some tips I picked up along the way.</p><ol><li><strong>Do one hilly ride and one long ride before the event.</strong> The first day of Climate Ride I rode 100 miles with almost 7,000 ft of climbing. So in preparation I did one 50 mile ride with 5,000 ft of climbing and one 75 mile ride with 2,000 ft of climbing. Although I didn’t complete a century before the event I felt confident I could handle both the length and climbing after I completed both these training rides without feeling completely exhausted afterwards.</li><li><strong>Don’t bring snacks unless you want something specific.</strong> I packed probably 10 bars/GUs/snacks in my bike bags and promptly ate almost none of them. At the start of the day and at stops along the way there were more than enough snacks to refuel with. And you can take some with you if you need something in between stops. I also recommend eating something fresh, like apple slices or an orange, at each stop.</li><li><strong>Don’t eat too much at lunch. </strong>My eyes and hunger were way bigger than my stomach when we stopped for lunch. I also tend to eat really quickly. So I ended up eating way too much at lunch and then feeling borderline sick for the next hour or two. I eventually burned it off and felt fine, but eating smaller portions and more frequently is a better system for me.</li><li><strong>Take some time to stop and enjoy. </strong>Yes this was a physical challenge and I wanted to do something I’d never done before, but there are lots of other great aspects of Climate Ride. On day 2, rather than doing another long ride, I opted for the short distance and stopped along the way including at a zero-waste store, coffee shop, bakery, and goat farm. I rode the entire day 2 with another Bike East Bay team member and we had so much fun exploring and eating our way through Pescadero. Also, stop and take some photos of the scenery and of you with your bike.</li><li><strong>Make friends. </strong>I met so many awesome people over the course of the weekend. Everyone was extremely friendly and I found myself taking long breaks, especially on day 2, because I was having so much fun talking with other riders.</li></ol><h3>RideOn is Bike East Bay’s regular member magazine. Learn more and join the movement: <a href="http://bikeeastbay.org/Join">BikeEastBay.org/Join</a></h3><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=50bdf956f9a" width="1" height="1" alt=""><hr><p><a href="https://medium.com/rideon/climate-ride-spotlight-50bdf956f9a">Climate Ride Spotlight</a> was originally published in <a href="https://medium.com/rideon">RideOn</a> on Medium, where people are continuing the conversation by highlighting and responding to this story.</p>]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Bike to Work and Wherever Days]]></title>
            <link>https://medium.com/rideon/bike-to-work-and-wherever-days-e89db8ea2c4?source=rss-20270b245c03------2</link>
            <guid isPermaLink="false">https://medium.com/p/e89db8ea2c4</guid>
            <dc:creator><![CDATA[Bike East Bay]]></dc:creator>
            <pubDate>Fri, 21 Apr 2023 19:42:55 GMT</pubDate>
            <atom:updated>2023-04-21T19:42:55.659Z</atom:updated>
            <content:encoded><![CDATA[<p><strong>Entire month of May set to be full of celebrations and festivities</strong></p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*oMHR7Kf-4k3CmwTGfcUSRA.png" /></figure><p>This year, Bike to Work Day is returning to a Thursday-May 18th, 2023 to be exact. We’re expecting the day to be bigger and better than ever. There will be more energizer stations throughout the East Bay, where you can pick up your Bike to Wherever Days bag. Each energizer station will be unique, offering things like:</p><ul><li>Coffee and snacks</li><li>Games and prizes</li><li>Bike repair stations</li><li>Music, fun, and so much more!</li></ul><p>Find your nearest energizer station on the Bike to Work Day map at <a href="http://bikeeastbay.org/BTWD">BikeEastBay.org/BTWD</a>.</p><p>Join in the fun with thousands of riders across the Bay Area! Participate in Bike to Wherever Days the entire Bike Month of May 2023, and encourage your coworkers, community members, and friends to come along! Here are some tips for getting started:</p><ul><li>Spread the word using various communications channels — social media, email, Slack, etc. — to get others excited leading up to Bike Month during May and Bike to Work Day on May 18.</li><li>Visit <a href="http://www.bayareabiketowork.com/">www.bayareabiketowork.com</a> to find resources and ideas to make every day a good day to pedal!</li><li>During the month of May, post positive stories about your biking endeavors on social media using #BTWD2023 — and reshare Bike East Bay’s posts, too!</li></ul><h3>RideOn is Bike East Bay’s regular member magazine. Learn more and join the movement: <a href="http://bikeeastbay.org/Join">BikeEastBay.org/Join</a></h3><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=e89db8ea2c4" width="1" height="1" alt=""><hr><p><a href="https://medium.com/rideon/bike-to-work-and-wherever-days-e89db8ea2c4">Bike to Work and Wherever Days</a> was originally published in <a href="https://medium.com/rideon">RideOn</a> on Medium, where people are continuing the conversation by highlighting and responding to this story.</p>]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Training Local Leaders]]></title>
            <link>https://medium.com/rideon/training-local-leaders-34c7e5922789?source=rss-20270b245c03------2</link>
            <guid isPermaLink="false">https://medium.com/p/34c7e5922789</guid>
            <dc:creator><![CDATA[Bike East Bay]]></dc:creator>
            <pubDate>Fri, 21 Apr 2023 19:42:53 GMT</pubDate>
            <atom:updated>2023-04-21T19:42:53.148Z</atom:updated>
            <content:encoded><![CDATA[<p><strong>Sparking conversations around mobility and environmental justice</strong></p><p>By Stephen Marea</p><p>This past year, funding from the Bay Area Air Quality Management District led to our first mobility justice and environmental justice trainings for Bay Area residents. As the Community Organizer, my goal for this training was to discuss the history of how cities were created and how discriminatory methods from the past still affect city life in the present day.</p><p>I began with the history and creation of Oakland, using it as a case study to examine how cities were separated through deed covenants, redlining, and the nuances of infrastructure disparities and their environmental impacts. I created a training framework with the intention of encouraging attendees to understand the layout and structure of the cities that we live in today, and to use this understanding to know how to advocate for change.</p><p>One of the training attendees named Nina shared their experience after participating in the session: “I hope you can keep giving this important presentation and informing more people about the historic racism built into our cities. Learning about these events and how the effects still reverberate today should help us make better decisions for tomorrow.” Another attendee, Milinda, also found the training to be informative: “I found the session very thought provoking. Thanks for hosting this session, and I’m hoping good results come from the added exposure of this topic.”</p><p>Given the need for more concerted educational efforts regarding the daily impacts of environmental and mobility justice, Bike East Bay has worked to build upon local efforts such as Bike Concord’s monthly leadership meetings, which have been expanded to include bike organizing efforts from all around Contra Costa County. Starting with local groups like Bike Concord creates the opportunity to support similar groups in acting as a community resource for other county residents who are beginning to organize in their respective communities.</p><h3>RideOn is Bike East Bay’s regular member magazine. Learn more and join the movement: <a href="http://bikeeastbay.org/Join">BikeEastBay.org/Join</a></h3><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=34c7e5922789" width="1" height="1" alt=""><hr><p><a href="https://medium.com/rideon/training-local-leaders-34c7e5922789">Training Local Leaders</a> was originally published in <a href="https://medium.com/rideon">RideOn</a> on Medium, where people are continuing the conversation by highlighting and responding to this story.</p>]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Active Transportation Advocacy]]></title>
            <link>https://medium.com/rideon/active-transportation-advocacy-bdc7756a0ea5?source=rss-20270b245c03------2</link>
            <guid isPermaLink="false">https://medium.com/p/bdc7756a0ea5</guid>
            <dc:creator><![CDATA[Bike East Bay]]></dc:creator>
            <pubDate>Fri, 21 Apr 2023 19:42:50 GMT</pubDate>
            <atom:updated>2023-04-21T19:42:50.539Z</atom:updated>
            <content:encoded><![CDATA[<p><strong>Reflecting on Bike East Bay’s visit to the AC Transit training facility</strong></p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*WY8wI111-GLj_wNy-g8NfA.jpeg" /></figure><p>By Dani Solis</p><p>This January, Bike East Bay staff and board members were invited to attend a tour of the Alameda County Transit (AC Transit) Division 6 Training facility in Hayward, California to exchange knowledge and insight on the relationship between buses and bikes in traffic.</p><p>Bike East Bay staff were met with a warm welcome from the AC Transit education staff and the tour of the facility was led by Michael Floccini, Training and Education Director and bike advocate. After checking out AC Transit’s hall of history and learning about their latest hydrogen fuel cell battery technology in the service garage, Bike East Bay staff checked off an item on every transit nerd’s bucket list–that is, driving a bus!</p><p>Excitement aside, there were a few key questions that we wanted to explore together as fellow active transportation advocates. Our first question was: what is a bus operator’s visibility of a bicyclist when they are in the right lane together? Under the careful supervision of Instructor Eagles and Instructor Jackson, bus operator instructors with decades of teaching experience, individual Bike East Bay staff members sat in the drivers’ seat while another staff member rode their bike outside near the right half of the bus. This exercise was meant to demonstrate just how challenging it can be to spot a bicyclist as a bus driver–especially when considering the laundry list of responsibilities while operating a bus.</p><p>Our Co-Director of People and Operations, Jill, was the first brave soul to ride her bike next to me while I drove the bus. As pictured from the perspective of my drivers’ seat, one of the only distinguishing features of Jill on her bike was her bright orange reflective vest. There are many blind spots on the bus, which is why it is important to stay as visible and predictable as possible when riding next to moving vehicles on the road.</p><h3>RideOn is Bike East Bay’s regular member magazine. Learn more and join the movement: <a href="http://bikeeastbay.org/Join">BikeEastBay.org/Join</a></h3><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=bdc7756a0ea5" width="1" height="1" alt=""><hr><p><a href="https://medium.com/rideon/active-transportation-advocacy-bdc7756a0ea5">Active Transportation Advocacy</a> was originally published in <a href="https://medium.com/rideon">RideOn</a> on Medium, where people are continuing the conversation by highlighting and responding to this story.</p>]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Building Bridges in 2023]]></title>
            <link>https://medium.com/rideon/building-bridges-in-2023-fe2e246a6353?source=rss-20270b245c03------2</link>
            <guid isPermaLink="false">https://medium.com/p/fe2e246a6353</guid>
            <dc:creator><![CDATA[Bike East Bay]]></dc:creator>
            <pubDate>Fri, 21 Apr 2023 19:42:47 GMT</pubDate>
            <atom:updated>2023-04-21T19:42:47.695Z</atom:updated>
            <content:encoded><![CDATA[<p><strong>Connecting Communities between East Bay geographies</strong></p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*cSrX2VRfL0tjb3oGNE3OCg.png" /></figure><p>By Robert Prinz</p><p>As we celebrated Bike East Bay’s 50th anniversary this past year, there were also some big announcements and transitions. From previous Executive Director Ginger Jui passing the torch and a new shared leadership model to our new Co-Directors Jill Holloway and Justin Hu-Nguyen, to former Advocacy Program leader Dave Campbell handing things over to longtime staff member Robert Prinz, we have been busy building bridges between Bike East Bay’s history and our vision for the future.</p><p>Similarly, around the East Bay there are many bicycle bridges in the works to both enhance connectivity between our geographies, as well as reconnect communities that have long been bisected by infrastructure barriers. Read on for info on a few of these, or visit <a href="http://bikeeastbay.org/BuildingBridges2023">BikeEastBay.org/BuildingBridges2023</a> for an interactive map and complete details.</p><p><strong>Opening Soon</strong></p><p>Under construction and estimated to open in 2023, Berkeley’s Gilman Street Bridge over I-80, the Iron Horse Trail Bridge over Dublin Blvd, and the Mokelumne Trail Bridge over Hwy 4 between Antioch and Brentwood have been in the works for many years. Both the Gilman and Mokelumne bridges span major freeways, and the Dublin bridge a wide and imposing surface street, overcoming barriers constructed to serve car traffic at the expense of anyone outside a vehicle.</p><p>Of the Dublin Blvd bridge, local advocate Kristi Marleau said: “This bridge will give us a much safer, faster connection between BART and the rest of the Iron Horse Trail. No more waiting for minutes for the light to change, crossing 7 lanes of traffic, and making awkward turns to get back on the trail at Dublin Blvd.”</p><p>We look forward to biking with you to the ribbon cuttings!</p><p><strong>Up Next</strong></p><p>Currently in the planning stages, two more bridges that span major barriers include the Richmond Greenway Gap Closure Bridge over train tracks and roadways, and the Oakland-Alameda Estuary Bridge across a 1000-foot waterway and busy boating channel. Each of these will be a major engineering challenge, requiring lots of funding and community support. Sign up for the Bike East Bay email newsletter at <a href="http://bikeeastbay.org/enews">BikeEastBay.org/enews</a> to know when and how to get involved.</p><p><strong>Happy Birthday!</strong></p><p>Two existing bridge pathways are celebrating anniversaries this year: The Richmond San-Rafael Bridge path and the Bay Bridge East Span. The Richmond pathway is turning four years old in November, marking the end of a pilot program intended to study the facility’s success. A final report will be available in Summer 2024 with details about the path use and impacts on car traffic, and we will be working hard to make sure that the outcomes maintain full access for people walking or rolling. The Bay Bridge East Span people path opened in September 2013, which means it will be a decade old as of Labor Day this year. We will be celebrating both of these pathways in a major way, and advocating for the continuation of the Bay Bridge path the rest of the way to San Francisco. Be on the lookout for announcements as we get closer to the anniversary dates!</p><p>If you have questions or comments for our Advocacy Team, send us a message at <a href="/service/mailto:Advocacy@BikeEastBay.org">Advocacy@BikeEastBay.org</a></p><h3>RideOn is Bike East Bay’s regular member magazine. Learn more and join the movement: <a href="http://bikeeastbay.org/Join">BikeEastBay.org/Join</a></h3><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=fe2e246a6353" width="1" height="1" alt=""><hr><p><a href="https://medium.com/rideon/building-bridges-in-2023-fe2e246a6353">Building Bridges in 2023</a> was originally published in <a href="https://medium.com/rideon">RideOn</a> on Medium, where people are continuing the conversation by highlighting and responding to this story.</p>]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Fostering a Passion for Bike Instruction, Advocating for Mobility Justice]]></title>
            <link>https://medium.com/rideon/fostering-a-passion-for-bike-instruction-advocating-for-mobility-justice-10d464b603f8?source=rss-20270b245c03------2</link>
            <guid isPermaLink="false">https://medium.com/p/10d464b603f8</guid>
            <dc:creator><![CDATA[Bike East Bay]]></dc:creator>
            <pubDate>Fri, 11 Nov 2022 18:16:58 GMT</pubDate>
            <atom:updated>2022-11-11T18:16:58.196Z</atom:updated>
            <content:encoded><![CDATA[<p>Introducing Dan Hernandez and Naomi Primero</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*kZUWf9FXD3MEUQzWw3Gkmg.png" /><figcaption>Introducing Dan Hernandez and Naomi Primero.</figcaption></figure><p>We are excited to introduce you to our new Education Co-Manager, Dan Hernandez!</p><p>Dan began bike commuting while attending schools in eastern and central US, which culminated in a Masters in Ecology. After working ten years domestically and internationally in conservation, he began teaching outdoor recreation.</p><p>Now 15 years into his second career Dan is convinced of the power of recreation to change lives, ecosystems, and communities. With certifications in sea kayaking and rock climbing, his favorite ‘work’ still involves cycling because of the far reaching positive effects of bike transportation. Becoming a bike instructor in 2005, our lead instructor in 2016, and a LAB Coach in 2022, Dan is happily co-managing the bike education program.</p><p>We are also excited to introduce you to our new Operations Coordinator, Naomi Primero!</p><p>Naomi joined Bike East Bay as the Operations Coordinator in August 2022. They have a background in the food industry, ranging from food accessibility to beverage service, and in legal administration. They see mobility justice and food justice as inextricably related and are excited to work behind the scenes to make riding accessible for their neighbors and community members.</p><p>Naomi continues to support operations/admin in the legal and food industry worlds. Outside of work, they could be found running around the parks of Oakland or testing drink recipes with tea.</p><h3>RideOn is Bike East Bay’s regular member magazine. Learn more and join the movement: <a href="http://bikeeastbay.org/Join">BikeEastBay.org/Join</a></h3><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=10d464b603f8" width="1" height="1" alt=""><hr><p><a href="https://medium.com/rideon/fostering-a-passion-for-bike-instruction-advocating-for-mobility-justice-10d464b603f8">Fostering a Passion for Bike Instruction, Advocating for Mobility Justice</a> was originally published in <a href="https://medium.com/rideon">RideOn</a> on Medium, where people are continuing the conversation by highlighting and responding to this story.</p>]]></content:encoded>
        </item>
    </channel>
</rss>