<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0" xmlns:cc="http://cyber.law.harvard.edu/rss/creativeCommonsRssModule.html">
    <channel>
        <title><![CDATA[Stories by David Marc Smith on Medium]]></title>
        <description><![CDATA[Stories by David Marc Smith on Medium]]></description>
        <link>https://medium.com/@DavidMarcSmith?source=rss-d9693e937798------2</link>
        <image>
            <url>https://cdn-images-1.medium.com/fit/c/150/150/0*7Bp8IESd6Fhufgft.jpeg</url>
            <title>Stories by David Marc Smith on Medium</title>
            <link>https://medium.com/@DavidMarcSmith?source=rss-d9693e937798------2</link>
        </image>
        <generator>Medium</generator>
        <lastBuildDate>Sun, 29 Nov 2026 19:39:49 GMT</lastBuildDate>
        <atom:link href="https://medium.com/@DavidMarcSmith/feed" rel="self" type="application/rss+xml"/>
        <webMaster><![CDATA[yourfriends@medium.com]]></webMaster>
        <atom:link href="http://medium.superfeedr.com/" rel="hub"/>
        <item>
            <title><![CDATA[Future Sight: Augmented Reality and Rail]]></title>
            <link>https://medium.com/@DavidMarcSmith/future-sight-augmented-reality-and-rail-4c49621f00bc?source=rss-d9693e937798------2</link>
            <guid isPermaLink="false">https://medium.com/p/4c49621f00bc</guid>
            <category><![CDATA[wearables]]></category>
            <category><![CDATA[technology]]></category>
            <category><![CDATA[augmented-reality]]></category>
            <category><![CDATA[railways]]></category>
            <category><![CDATA[ar]]></category>
            <dc:creator><![CDATA[David Marc Smith]]></dc:creator>
            <pubDate>Sun, 08 Apr 2018 10:02:39 GMT</pubDate>
            <atom:updated>2018-04-08T10:02:39.839Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*ABOTrUk9kcC72GpcvdYvcQ.png" /><figcaption>Image credit: Johanna Ungeheuer (jo_ungeheuer@hotmail.com)</figcaption></figure><h3>Introduction</h3><p>Within the rail industry, there remains a divide between the wealth of data available and its ability to deliver value when applied on site.</p><p>The trackside environment is a complex three-dimensional interdependency of assets, hazards and personnel. It is dynamic with a high number of variables. The challenge of balancing safety and productivity is constant.</p><p>In contrast, the data that is used to guide our decisions remains confined to two-dimensional paper and mobile interfaces. In some cases, this data may be out of date or no longer version-controlled.</p><p>It is here that the divide between the physical and the digital can be seen. Bridging this divide has the potential to unlock profound value across the industry.</p><p>Augmented reality (AR) is a technology that overlays data and visuals on the physical world. According to one estimate (Fig.1), AR market size will hit £158bn (£215bn) by 2021; an 18-fold increase from 2017. <a href="#_ftn1">[1]</a></p><figure><img alt="" src="https://cdn-images-1.medium.com/max/618/1*yn6wQ2nwaRKt0clIkKhf1g.png" /><figcaption><strong>Fig.1 — Augmented reality market size (estimated 2016–2021)</strong></figcaption></figure><p>This growth explosion will affect all industries and organisations, including rail. It will change how decisions are made, how safe work is delivered and how staff training is provided.</p><p>AR has the potential to bridge the divide between the physical trackside environment and the digital world of data. These changes are not only being seen in Silicon Valley. Organisations such as Boeing and GE are using their vast data reserves to implement AR solutions and have achieved marked improvements in both quality and productivity. <a href="#_ftn2">[2]</a> <a href="#_ftn3">[3]</a></p><p>In this white paper, I describe what AR is, its potential applications across the rail industry and why it is important to keep abreast of the latest developments. I focus on practical applications for AR across the industry and the factors that must be considered in unlocking its potential.</p><h3>What is augmented reality?</h3><p>Augmented reality involves superimposing digital information on the user’s physical environment in real-time. <a href="#_ftn4">[4]</a> This digital information comes from the conversion of data and analytics into images or animations. Currently, this overlay is often provided through mobile devices such as smartphones. In future, delivery of AR will move to new mediums. Wearables such as head-mounted displays and smart glasses will free the user’s hands and allow them to complete tasks in parallel. Solving the headwear challenge will be a crucial enabler to using AR across the rail industry.</p><p>As with many nascent technologies, early use of AR can be found in entertainment. Snapchat filters and the hugely-popular <em>Pokémon Go</em> have proved a hit worldwide. With less fanfare, AR is currently being applied within both workplace and consumer settings.</p><p>For example, BMW’s ‘i-Visualiser’ tool helps BMW sell cars and enthuse customers in new ways. <a href="#_ftn5">[5]</a> This immersive approach is changing how buyers choose, configure and make purchasing decisions. Applied in a rail setting, this would allow contractors to make purchasing decisions around key plant and equipment and configure as appropriate. Given the volumes and costs involved, substantial savings can be made — along with more value, productivity and utility obtained from assets.</p><p>Delivering safe work can also benefit from AR. It can display navigation, hazard warnings and other information directly in a user’s line of sight — supplementing traditional paper-based processes. More promisingly, in future it will be possible to use AR in conjunction with OnTrac’s mobile solution ‘ePIC’ <a href="#_ftn6">[6]</a> to ensure work is completed more productively and safely than ever before.</p><p>AR promises a major enhancement to the delivery of safe work. It is a medium to configure two-dimensional information for use on a three-dimensional railway. The mental leap between both the physical and the digital can then be bridged.</p><p>This will allow users to work more safely, make improved decisions and complete work more efficiently. (Fig.2).</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/899/1*Yu7gkb242YYGAHP08wuwqA.png" /><figcaption><strong>Fig.2 — AR would allow for easier interpretation of 2D data whilst working within a 3D environment </strong><a href="#_ftn7"><strong>[7]</strong></a></figcaption></figure><p>It is this mental leap that makes assembling IKEA furniture or disassembling an engine so much more difficult than it appears on a paper-based instruction manual.</p><p>Instead, AR allows for construction, inspection and refinement at a much broader scale. Shipbuilders for the US Military are using AR to support rigorous inspection regimes. <a href="#_ftn8">[8]</a> Results show a dramatic improvement — a reduction in inspection time by 96%. Time savings across manufacturing typically average to 25% or more. <a href="#_ftn9">[9]</a></p><p>The improvements that AR holds for delivering safe work within dangerous and hazardous environments trackside are therefore dramatic.</p><h3>How does augmented reality work?</h3><figure><img alt="" src="https://cdn-images-1.medium.com/max/866/1*rJ_WtcuVx9FhVQ70YIQrYw.png" /><figcaption><strong>Fig.3. — How augmented reality works </strong><a href="#_ftn10"><strong>[10]</strong></a></figcaption></figure><h3>Augmented reality’s key capabilities</h3><p>AR’s capacity to bridge the physical-digital divide allows us to unlock a huge amount of untapped benefits from stored data.</p><h4>Training</h4><p>AR is redefining instruction, training and coaching. Given the 16,000 kilometres of track and infrastructure across an ever-growing and increasingly-complex network, it is important that training practices keep pace.</p><p>Traditional training methods are costly, labour-intensive and often deliver uneven results. Written instructions can be difficult to understand, time-consuming and unwieldy. Videos are not interactive, may fall out-of-date rapidly and can’t adapt to individual learning needs. In-person training is expensive, logistically demanding and requires attendees to be at an agreed place at a set time. This can be difficult to organise — particularly in the shift-driven, geographically-dispersed world of rail.</p><p>AR addresses these issues by providing real-time, on-site, step-by-step visual guidance. This can include equipment assembly, maintenance and operation. Ambiguity is diminished as information supplements the physical world directly, rather than abstractly on a page (Fig.4).</p><p>This use of technology to improve training creates significant benefits downstream around both operation and maintenance. In the asset-heavy context of rail, these benefits improve both safety and productivity.</p><p>In one Boeing study, AR was used to guide trainees through the 50 steps required to assemble a section of an aircraft wing involving 30 parts. Using AR, trainees completed the work in 35% less time than trainees using traditional paper-based processes. <a href="#_ftn11">[11]</a> In addition, the number of trainees with little-to-no training that could perform the task increased by 90%. <a href="#_ftn12">[12]</a></p><p>Given the nature of the railway includes the need to accommodate wide geographical coverage, AR must be able to deliver value trackside irrespective of location. AR can transmit what a user sees on site to a remote expert, who can respond with guidance. This enables immediate access to expert insight anywhere on the network. This not only improves performance and utility, but significantly reduces cost. In another study by a building systems service company, the use of AR saves more than £400 per engineer per month in travel and worker costs; resulting in a £15 return on every £1 spent on AR. <a href="#_ftn13">[13]</a></p><p>An additional side-benefit of AR is the ability to attract a younger and more diverse staff into the industry. Rail has long had an undeserved reputation as a ‘unglamorous’ career, despite the wealth of engineering and technical excellence involved. Attracting young professionals who have grown up in an age of smart technologies is essential to developing a strong talent pipeline and securing a bright future for the industry. The practical use of AR and other ‘smart’ solutions can have a huge pull. It is up to the industry to demonstrate forward-thinking and begin to attract new and diverse candidates to work in rail.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/972/1*2UsHAaAaj_SmlScpy-4Wmg.png" /><figcaption><strong>Fig.4. AR has proven results as a powerful training aid </strong><a href="#_ftn14"><strong>[14]</strong></a></figcaption></figure><h4><strong>Visualisation</strong></h4><p>AR is capable of visualising internal features that would otherwise be difficult to see. Medical applications are available that convert the heat signature from a patient’s veins to an image that is superimposed on their skin, making it easier for medical professionals to locate. Clinical trials have shown this leads to more than 200% improvement in a successful needle stick at the first time, reducing the need for escalations by 45%. <a href="#_ftn15">[15]</a></p><p>Worksites are complex and contain a myriad of assets, hazards and other variables. To those on site, translating information contained within Safe Work Packs to their location can be a challenge. This has important implications to both safety and productivity, particularly to those who have received less training and/or are unfamiliar with the location involved.</p><p>Being able to visualise this information clearly will result in significant improvements. This includes highlighting concealed or obscured hazards, along with a visual ‘X-ray’ of complex infrastructure and assets such as electricity sub-stations, cable routing and remote condition-monitoring hardware, such as that provided by MPEC. <a href="#_ftn16">[16]</a></p><h4><strong>Interaction</strong></h4><p>The advance of AR allows for new user interfaces to be developed. Traditional physical controls such as levers, buttons and touch-screen interfaces may be replaced in the long-term. In the post-PC age, new mediums of control such as gesture and voice technology are emerging.</p><p>AR removes the need for a physical interface altogether. Virtual control panels can be superimposed directly on the product and operated via user gestures and voice commands. Advances in facial recognition and retinal tracking will soon allow users to look at or gesture towards a product and open an interface to operate it.</p><p>This technology is still at the nascent stage and will improve as the development S-curve progresses. The potential however is enormous. The Fluid Interfaces group at MIT’s Media Lab have created ‘Reality Editor’, which makes it easy to add an interactive interface to smart products. <a href="#_ftn17">[17]</a> Capabilities can then be programmed to link to gestures and voice commands. Voice recognition technology is now 96% accurate, which exceeds human performance. <a href="#_ftn18">[18]</a> GE have achieved a 34% productivity increase from allowing users to use voice commands when performing complex electrical processes for wind turbines. <a href="#_ftn19">[19]</a></p><p>Voice recognition technology has also made significant advancements in operating feasibly within noisy and chaotic environments. This can be used to control equipment such as lighting and generators. Machinery in hazardous environments can be operated at safer distances by removing workers from the vicinity of maximum danger. It will also remove the need for workers to transverse hazardous paths across track and through red zone working areas.</p><h3>How AR can deliver value to the rail industry</h3><p>AR can deliver value to the rail industry via two main channels:</p><p>1. Delivering safety and productivity improvements across the industry</p><p>2. Using AR to drive value within business operational units</p><h4>AR delivering safety and productivity improvements across the industry</h4><p>The operation of the rail network requires balancing two essential, but occasionally contradictory priorities: safety and productivity. Maximising one, without a negative impact on the other, is an ongoing challenge.</p><p>The way that assets communicate essential safety and operational information is critically important. AR can improve such interfaces dramatically.</p><p>A key indicator to determine whether AR could appropriately be introduced to rail is to look at other industries that also require robust and extremely high safety standards.</p><p>Hands-free AR tools have developed a track record of performance in automobiles and both military and commercial aviation. Wearables provide an affordable delivery medium. This technology allows users to see an AR display on any product enabled to communicate with them.</p><p>For example, when looking at a signal, a user may see important asset information taken from data sources such as Ellipse (Fig.5):</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/939/1*piC3vnDexd1P9Zraq9j_Zw.png" /><figcaption><strong>Fig.5 — AR offers potential for the emergence of new interfaces — even at trackside </strong><a href="#_ftn20"><strong>[20]</strong></a></figcaption></figure><p>Key lineside infrastructure such as signalling and cabling can be augmented to display information such as asset IDs, names and types. Future enhancements to the signals themselves would allow trackside workers to interact and operate the equipment via voice or gestures. This improves both safety and operability. It also removes the need for physical interfaces on some hardware, which can protect against vandalism and wear-and-tear.</p><p>Because the AR user interface is delivered via the cloud, data can be personalised to individual users and continually updated.</p><p>The issue of uncontrolled and disparate data sources is one that continues to hinder the UK’s rail network. OnTrac’s own software ‘eTrac-GIS’ (part of the RailHub suite) is now playing a key role in resolving this challenge. <a href="#_ftn21">[21]</a></p><p>eTrac-GIS is a digital mapping platform that transforms how the rail industry operates. Using asset data from multiple sources, eTrac-GIS automatically generates schematics-on-demand (‘geomatics’). This provides the industry with a revolutionary platform to cleanse source data using a user-friendly interface. Users can interact with source data using a simple drag-and-drop interface to amend incorrect data (Fig.6). Updates can then be pushed back to data sources in real-time. Solutions such as this will be essential to deliver value through AR due to the importance of having a strong data management strategy.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/941/1*Q0kDvUb2zda1ZGPiFyTogA.png" /><figcaption><strong>Fig.6. — eTrac ‘geomatic’ of ECM6 — Newcastle railway station </strong><a href="#_ftn22"><strong>[22]</strong></a></figcaption></figure><p>Furthermore, incidents such as the Sandilands Junction tram derailment in November 2016 also provide an example of where AR could have been used to mitigate risk.</p><p>In this case, the Rail Accident Investigation Branch report (RAIB 18/2017) found that there was both an absence of any device to check for loss of awareness, and that team operating organisations currently have no mechanism to promote the sharing of safe information or the management of risk. <a href="#_ftn23">[23]</a> Had drivers had access to hands-free AR technology, this updated information could have been immediately available.</p><p>In addition, in future it may also be possible to measure driver awareness and receptiveness via AR headwear. This is done by including metallic electrooculography sensors that track the electrical potential of the user’s eye movements. <a href="#_ftn24">[24]</a> Given the common factor of operator fatigue in many rail safety violations, <a href="#_ftn25">[25]</a> AR hardware can be used to manage this risk more effectively. Similar technology has a proven application in the trucking industry.</p><p>All this is not to say the industry is starting from a position of weakness. But there can be no loss of focus on improving both safety and productivity.</p><p>Three years ago, the industry achieved a 26% reduction in lost time injury frequency rate. Two years ago, it achieved 16%, with a goal this year of a further 10%. Only 5% of this labour involved Network Rail personnel. This demonstrates the huge responsibility (and success) the industry supply chain has had in achieving higher safety performance.</p><p>However, there is always room for improvement. The biggest single influence on safety is planning, where there is a clear statistical correlation between safety and performance. This is evidenced by work completed on Bank Holidays, which see the lowest lost time injury frequency rate. Results here are typically 33–50% lower than the moving annual average. <a href="#_ftn26">[26]</a> Achieving consistency irrespective of the time of the year is a key collective responsibility for the industry.</p><p>Ian Prosser, the ORR’s chief inspector of railways, recently expressed concerns that safety standards had plateaued. <a href="#_ftn27">[27]</a> One suggestion Ian made is to speed up renewals, which reduces the need for increased maintenance. Where there is a collection of reasons why such delays occur, the more to a smarter and more digital railway will make this work more frequent and efficient.</p><p>The UK government must also step up to provide funding certainties. Whilst the Department for Transport (DfT)’s announcement of a 25% increase in the overall funding envelope for CP6 is a welcome one, increasing funds to almost £48bn from £38bn, there remains a shortfall.</p><p>The Railway Industry Association (RIA) notes that the ‘boom and bust’ approach in the current funding system acts as a disincentive to investing in new technologies, processes and people. Instead, costs have risen by up to 30% in some cases. Given the network has seen passenger numbers increase by 116% over the last 20 years (with future forecasts of 9% increases annually), <a href="#_ftn28">[28]</a> it is important to deliver the financial certainty that will act as a catalyst for introducing and embedding new technologies such as AR.</p><h4>Using AR to drive value within operational units</h4><p>AR is demonstrating results across the value chains in numerous other industries. Using the application guidelines discussed earlier, both training and visualisation applications are further advanced than interaction. Despite this, promise is strong across all three areas. Here I explore how these can be applied across value units in rail.</p><p><strong><em>Construction and manufacturing</em></strong></p><p>Each year, Network Rail spends around £4bn on enhancements and £3bn on renewals. This accounts for 22% of the UK’s infrastructure investment and is the equivalent of building an Olympic Stadium each month. <a href="#_ftn29">[29]</a> Looking ahead, Network Rail’s funding plan for 2019–2024 includes £47.9bn spend with a focus on infrastructure renewals. <a href="#_ftn30">[30]</a></p><p>A study by Aspire Europe found that Network Rail Infrastructure Projects (NRIP) is in the top 10% of delivery organisations around the world.<a href="#_ftn31">[31]</a> However, there is no limit to improvements that can made.</p><p>Regardless of the work involved, construction and manufacturing processes are often extremely complex. The work involved is costly and may involve thousands of steps. Done incorrectly, costs from project overruns can run into millions of pounds with passengers enduring severe disruption as a result.</p><p>As we’ve learned, via a cloud-driven delivery model, AR can provide correct and accurate information on demand. This improves productivity, reduces the risk of errors, and drives efficiencies.</p><p>In the fabrication stage, AR can also capture information from sensors, asset management tools and automation systems. This allows operators to make monitoring and diagnostic decisions at each stage of the process. Spotting efficiency and defect rates early allows technicians to understand problems and make proactive (rather than reactive) corrections. This prevents downtime and increases the likelihood of delivery on-time. Given the number of stakeholders and logistical complexity in rail, this is a massive value multiplier.</p><p>One important enabler of the Digital Railway is the installation of modern telecommunication systems. Data routed through both fixed telecom and GSM-R networks will underpin the enablement of new technologies. GSM-R is currently supported by 2,500 radio masts and has been well-received across the industry. It is important that this network receives appropriate levels of investment and attention to enable it to handle increased levels of data transfer. Indeed, such investment satisfies the focus of Network Rail’s ‘Intelligent Infrastructure’ Programme: <a href="#_ftn32">[32]</a></p><p>· Performance-driven improvements</p><p>· Asset knowledge</p><p>· Effective design</p><p>· Monitoring capability</p><p>· Analysis capability</p><p>· Optimisation through Eclipse.</p><p>An intelligent infrastructure approach to telecoms will act as catalyst for AR use on-site and will make a huge difference to smart connected device usage across the network.</p><p><strong><em>Logistics</em></strong></p><p>The UK rail network is a geographically vast one of more than 16,000 kilometres of track, 40,000 bridges and viaducts and thousands of stations, tunnels, signals and level crossings.</p><p>Ensuring plant and equipment is both correct, at the right location on the network and at the right time is demanding.</p><p>Warehousing operations account for 20% of all logistical costs, whilst transporting them accounts for 65%. This costly operation is supplemented by paper-heavy processes that are slow and prone to human error. <a href="#_ftn33">[33]</a></p><p>Organisations such as Amazon and DHL have made huge improvements in their inventory management techniques. DHL have improved productivity by 25% via use of AR, <a href="#_ftn34">[34]</a> whilst Intel have achieved 29% with a reduction in the number of selection errors. Indeed, Intel have chosen to eliminate their wearables division from Q3 2017 focus purely on AR. <a href="#_ftn35">[35]</a> AR reduces the risk of mistakes when selecting equipment for planned work on site, helping to reduce shift cancellations and improve safe working conditions.</p><p>The principal aim of Network Rail’s Digital Railway programme is to introduce new digital systems to raise capacity on an increasingly congested network. Implementation of these systems has already started on the Norwich — Great Yarmouth route; with future conversion full compatibility with to the European Rail Traffic Management System (ERTMS) in mind.</p><p>This conversion process is a huge logistical challenge in its own right; yet will provide enormous logistical benefits once completed. The fitting of rolling stock also requires effective use of traffic management techniques using tools such as Tracsis’ Traffic and Data Services software. <a href="#_ftn36">[36]</a></p><p>Implementation challenges include lack of signalling source records, a significant uplift in functionality and implementing TMS at times of major signal re-engineering work. <a href="#_ftn37">[37]</a> When it comes to both implementation and training, AR can deliver huge benefits in both these areas to help make the Digital Railway a reality.</p><p><strong><em>Development and Design</em></strong></p><p>Whilst Computer-Aided Design (CAD) capabilities have been used for decades, interacting with these models through the two-dimensional interface of a screen is a handicap.</p><p>Instead, AR allows these models to be superimposed within the physical world as holograms. This allows for much more detailed and rigorous analysis and design improvements. Upon a suitably flat surface to ensure ease-of-use, this hologram can be laid down to allow engineers to look at it and move around it as if it were a physical entity at scale in its intended setting.</p><p>These holograms can then be juxtaposed against physical prototypes or working models to review performance. Car manufacturers are currently doing this to improve their quality assurance processes. Difficulty in comparing 2D concepts with 3D models is then removed, with the possibility of up to a 10x productivity improvement. <a href="#_ftn38">[38]</a></p><p>Sensor technology enables a feedback loop to be developed to improve the design process. Conditions such as vibration white finger can be monitored and mitigated against more effectively, improving health and safety. Aggregating this data will be instantaneous, allowing lessons learned and improvements to be made much more quickly than at present. Parallel advancements in machinery and robotics may mean that one-day safe work can be completed at distance rather than requiring hands-on physical proximity; all enabled and driven by AR interfaces.</p><p>The recent Ordsall Chord project is an example of effective project planning. One aspect that made this successful was the use of Business Information Modelling (BIM). The UK government has mandated the use of BIM since April 2016. BIM is an intelligent 3D-model based approach used my architects and engineers to more efficiently build and manage infrastructure projects. In the Ordsall Chord project, visualisation techniques were used extensively during GRIP Stage 3 (option selection). <a href="#_ftn39">[39]</a> The project team were to make changes quickly and efficiently under tight delivery constraints. This demonstrates the effect that visualisation techniques have at all levels of project delivery — from development and design.</p><p>Excitingly, AR also allows for the possibility of one day allowing planners to collaborate on the creation of Safe Work Packs.</p><p>Currently, OnTrac’s RailHub suite offers the highest-quality pack creation tool in the industry. Through a combination of SWP, schematics-on-demand on the on-site mobile app ePIC, RailHub delivers a SIL-4 level solution. It has a flawless record of both safety and reliability.</p><p>In future however, AR can be used to take RailHub to an even higher level. AR opens the possibility of creating digital copies of worksites and possessions in the physical world. The Rail Safety and Standards Board (RSSB) has repeatedly found that many safety violations on site result from the work planned and environment specified within the SWP being much different to being on-site. Planners are often asked to create Safe Work Packs for sites that they’ve never visited, meaning that many risks fail to be captured at the earliest stage. Due to this, track workers are forced to rely on supplementary working knowledge from experience. In some cases, this is not possible and risks are not mitigated. AR would allow more of this risk to be captured, quantified and catalogued.</p><p>Being able to visualise sites within the planning stage will allow for a dramatic improvement in safety (Fig.7).</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/954/1*dCKFCGAADr7Q_22miRcYxQ.png" /><figcaption><strong>Fig.7. — Concept image of viewing a worksite at the planning stage via use of AR </strong><a href="#_ftn40"><strong>[40]</strong></a></figcaption></figure><p><strong><em>Maintenance and Servicing</em></strong></p><p>Network Rail’s maintenance teams are responsible for the day-to-day upkeep of the network. These teams ensure that all aspects of the rail infrastructure remain in suitable working order.</p><p>The Office of Rail and Road (ORR) have set demanding targets for minimising passenger disruption during CP5 (2014–2019). This includes reducing passenger disruption by 8% and to freight customers by 19%. <a href="#_ftn41">[41]</a> Given the network is busier than ever, targets for CP6 will require new technologies to improve performance further.</p><p>It is in this area that AR shows huge potential to unlock the value-creating capabilities of remote condition monitoring technology and smart connected devices. Organisations such as MPEC deliver a range of products across the industry including signal data loggers (SA380), smart sensors (VTI21) and remote-control oscilloscopes (SA380TX). These are all managed centrally via the Centrix RCM (Remote Condition Monitoring) Platform. <a href="#_ftn42">[42]</a></p><p>Supplementing this advanced technology with AR assists technicians by displaying predictive analytics generated by the product. In turn, this can guide users through maintenance tasks in real time. Connections can be made to remote experts to optimise procedures. This has huge value given the geographic breadth of the rail network. For example, an AR-generated dashboard may reveal to an operator that a specific component on an asset has a high possibility of failure based on previous analytics that identify causations. This makes the hugely valuable leap from reactive to proactive maintenance.</p><p>In one major European telecommunications provider, field technicians use AR to see a product’s service history and diagnostics data. Making this information easily accessible has led to a 17% decrease in work-related error rates and an improvement in repair quality. <a href="#_ftn43">[43]</a> Such an improvement across the rail network would drive considerable value, reduce the amount of time engineers need to spend in inherently dangerous environments and improve service for passengers. Remote training and support also increases staff utility and reduces travel costs. Given most worker injuries and deaths now happen in road vehicles travelling to and from worksites and depots, <a href="#_ftn44">[44]</a> minimising the need for this is a huge plus. Not only that, but negative externalities such as environmental damage are reduced too.</p><h3>Developing an AR strategy for rail</h3><p>As we’ve seen, AR has the potential to revolutionise how organisations across many industries operate. This includes expanding industry boundaries and making new strategies a reality.</p><p>Here I look at the factors one must assess when looking to develop a bespoke AR strategy within rail (Fig.8).</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/941/1*Yigke23htgdLlJUZWw_UgA.png" /><figcaption><strong>Fig.8 — Developing and AR strategy for rail — five questions </strong><a href="#_ftn45"><strong>[45]</strong></a></figcaption></figure><h4>1. What are the opportunities that AR presents to your team or organisation?</h4><p>Organisations within rail must look at the potential of AR within their own operational context. This includes the need to involve people from a diverse range of roles and experiences, rather than implementing a top-down, prescriptive approach.</p><p>This can be done using methods appropriate to organisational size and operating model. External experts can be consulted and low-cost proof of concepts initiated to get a lock on target areas. That does not mean that focus cannot be pivoted in future. Instead, it ensures that costs are controlled and teams are sufficiently engaged given the up-front time and capex costs involved in AR.</p><h4>2. In what order should these be pursued?</h4><p>Given the wide-ranging activities taking place in the industry, multiple implementation paths for AR will quickly emerge.</p><p>It is important to get a solid grasp on these opportunities. Formulating a strategic plan will involving aligning these opportunities to existing organisational strategy, complementary stakeholder practices and improvements in hardware.</p><p>Due to rail’s inherently complex balance between safety and productivity, it is also important to invest time and effort in areas that can generate and demonstrate early promise of advancement in these areas; whilst hedging against any risks or downsides if AR (or its case-by-case implementation) proves unsuitable. As the ancient Chinese proverb states, a person that chases two rabbits catches neither. This too applies to an unfocused approach to AR.</p><h4>3. Where will AR have the greatest cost-benefit impact?</h4><p>AR enables new efficiencies that are industry-agnostic. As evidenced above, it can significantly lower the cost of training, maintenance, construction, design and all areas of the value chain across rail. The reduced need for physical interfaces can also improve manufacturing costs and improve security. Harnessing better asset intelligence is also supported by new models of infrastructure finance, enabling essential capacity improvements.</p><p>One must be cautious of looking to experiment with new technology without a focus on outcomes.</p><p>As with new technology, it is possible that AR will open new opportunities and advantages outside the original scope. However, outcomes must be aligned to metrics to ensure implementation is carried through where appropriate, whilst the risk of AR being a novelty or ‘gimmick’ is minimised.</p><h4>4. Should AR be a core strength or does it require partnerships?</h4><p>Rail industry stakeholders are broad and varied — from infrastructure owners such as Network Rail, contractors, Train Operating Companies (TOCs) and the wider supply chain. The answer to this question will vary.</p><p>One important determinant is the market supply of skilled labour needed. Given the relatively nascent state of AR in industry, there is a large demand not currently being satisfied by supply. This means that AR skills often come at a cost premium. User interface and experience design are essential given the safety-critical nature of work. Information presented must be accurate and easy to interpret. Modelling this information to the range of applications involved will be time-consuming and expensive over a longer-term cost horizon, with industry knowledge a helpful pre-requisite.</p><p>For larger organisations such as Network Rail, these costs are easier to absorb centrally as opposed to smaller suppliers with more limited financial scope. Network Rail’s 26 training centres and four workforce development centres (WDCs) would be capable of offering training at scale nationally. In time, dedicated teams could be developed to establish the infrastructure needed for medium-to-longer term roll-out. The lead time for this to occur can be supplemented with training and investing in AR talent and making them a key strategic asset.</p><p>For others, such as Network Rail’s principal contractors, the initial capex costs associated with building AR competency can be used within other business units outside of rail. TOCs may choose instead to focus on passenger-side innovations and use a BYOD approach, negating the need for large-scale equipment costs. AR could be used to display information such as journey details, seat availability and deliver on-board entertainment.</p><h4>5. How will AR affect relationships with key stakeholders?</h4><p>The UK rail network involves hundreds of complex interrelationships and dependencies. It is not possible to make unilateral changes to operating procedures without support and buy-in from stakeholders both internally and externally.</p><p>At OnTrac, we endeavour to engage with our customers and the wider industry as much as possible to help shape and guide our products and services. This approach will also be needed with AR, which offers a fundamentally new method of working.</p><h3>Deploying AR to your organisation</h3><p>Once a strategy has been developed, the next stage is to ensure satisfactory execution. This requires consideration of organisational skills, people skills and technical competencies (Fig.9).</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/854/1*xBbKl2s941iZTPjCvYGEvQ.png" /><figcaption><strong>Fig.9 — Deploying AR to your organisation — five questions </strong><a href="#_ftn46"><strong>[46]</strong></a></figcaption></figure><h4>1. What capabilities and training will be required?</h4><p>This will pose a significant challenge should the questions in the previous section not be considered.</p><p>The level of capability and training required is dependent on complexity. Visualising products in an array of configurations (such to IKEA’s catalogue app) are relatively straightforward. Many modern smartphones are already capable of delivering this. Apple’s iPhone X has even changed the orientation on the camera lens to the rear of the device to optimise for AR applications.</p><p>Applications like those used by Boeing and GE to augment their manufacturing process, are more complex to build and develop. Given the size and scope of rail infrastructure, a commitment to build and maintain dynamic 3D content is essential. This data must be maintained, similar to Ellipse and GEO-GIS currently.</p><p>Apps that deliver interactive experiences (such as those that can remove the need for control panels) are the most challenging to develop. This technology is dependent upon ongoing improvements in voice control and gesture recognition. In turn, this technology must successfully interface with software that controls smart-connected products. These remain in their infancy but are advancing at a rapid pace.</p><h4>2. How will your organisation create and maintain content?</h4><p>The rail industry possesses unparalleled content potential for AR. In some cases, such as a design and fabrication context, it is possible to repurpose existing content. Over time, more dynamic experiences must be designed and built afresh. This requires special expertise.</p><p>Complex instruction-driven applications used for operational purposes will require highly accurate digital facsimiles. These can be created using techniques such as 3D scanning or CAD modelling. To deploy AR in a way that maximises beneficial impact, organisations across the industry must invest in digital modelling capabilities and catalogue their asset portfolios.</p><p>Given the number of organisations involved, this process requires both a decentralisation of responsibility with a centralised approach to standardisation. Thought must also be given to how such data is maintained. Equipment and assets that are safety-critical must take priority, whilst care much be given to ensuring that performance levels are at least maintained.</p><p>The challenge of maintaining disparate data sources across the rail industry is not a new one. OnTrac’s eTrac software is set to revolutionise data management across the industry. In addition, apps powered by Nutshell Apps’ innovative drag-and-drop platform are being used to manage Works Delivery programmes around the network. <a href="#_ftn47">[47]</a></p><p>Whilst previous attempts were made to achieve operational excellence, including using ill-fitting solutions taken from industries such oil and gas, OnTrac operate with the railway industry first in mind. One of the many benefits of OnTrac products is that they act as an enabler of the digital railway and exciting new technologies that will benefit the industry and passengers alike. For AR to flourish, we must build on the technologies that are available now to create the platform that’s needed tomorrow.</p><h4>3. What aspects of the rail infrastructure will be involved?</h4><p>For AR to superimpose information on the physical world, it must first recognise what it is looking at.</p><p>As the earlier infographic demonstrated, there are three options for this to happen:</p><p>i. Computer vision (an AR device directly recognises objects)</p><p>ii. Marker tracking (an AR device scans and reacts to a printed data code on or near an object)</p><p>iii. GPS tracking (geolocation data to identify places)</p><p>Given the vast range of assets and infrastructure that need to be catalogued, a blended model of these techniques will be necessary.</p><p>An initial step will be to use early proofs of concept to provide a low-cost analysis of which approach is most suitable. Only once these concepts have completed and evidence gathered will it be possible to determine the most suitable and cost-beneficial approach. Approaches ii and iii will likely be used for early adoption given the lower costs involved. Over a longer time-horizon however, computer vision will become a more affordable and practical option.</p><p>These choices can also be informed by safety considerations. In one RAIB report (15/2017), re-signalling at Cardiff station almost caused a potential collision had the train operator not realised the points in front of his train were set incorrectly. <a href="#_ftn48">[48]</a> Fortunately, the driver stopped the train in time. In cases like this, AR may one day display real-time signalling information to the driver. This would make dangers immediately visible in all conditions — and not fully dependent on the alert actions and quick-thinking of the driver.</p><h4>4. What AR hardware is needed?</h4><p>Delivery of AR technology at present is mostly through smartphones and tablets.</p><p>Across the industry, there is a proliferation of devices used. This includes smartphones and tablets running both iOS and Android software. The age of this hardware also varies considerably. The spread of AR use will require investment in modern technology that can handle the demands of AR.</p><p>Tablets offer larger screens, increased processing power and better visuals. This will prove beneficial given the wider environment that needs to be considered whilst trackside, along the corresponding amount of data that is applicable. Whilst smartphone use is ubiquitous across all user groups, tablets are not. Because of this, organisations will often provide them to their staff.</p><p>Apple’s release of the iPhone X included the new A11 bionic chip designed to power Apple’s new neural engine (such as 3D facial recognition). It also includes a 25% speed boost, enabling more robust AR processing. <a href="#_ftn49">[49]</a> The camera lens on the phone have now been reoriented to appear horizontally whilst the phone is held in a landscape position. This is also designed to optimise for AR apps. The announcement of Apple’s ‘ARKit’ will also make development opportunities for AR more widespread and accessible. This development will act as a catalyst for new uses of AR more broadly, along with a corresponding development in the world of Android. Google recently updated its ‘Google Glass’ hardware and launched ARCore, an equivalent to Apple’s ARKit. These are the first shoots of a growing movement.</p><p>Eventually, most AR applications for use in the railway industry must shift towards head-mounted displays that allows users complete mobility and dexterity of their hands. To add a further important step, it will also be necessary to make such headsets compliant with industry-standard PPE.</p><h4>5. What processes need to be in place?</h4><p>This step is the most important of all. It is not possible to implement new or unfamiliar technologies without designing an adequate process to support it.</p><p>This journey will involve three key steps:</p><p><strong><em>i. Journey management</em></strong></p><p>a. Creating a vision for AR use over the short, medium and longer terms.</p><p>b. Co-ordinating multiple programmes across varied areas of the rail network. This includes infrastructure projects, maintenance and train operating companies across the industry. This ensures that value is captured across the industry and processes can be adapted accordingly.</p><p>c. Conduct an appropriate SWOT analysis to ensure analytics are captured and any losses are minimised and learned from.</p><p><strong><em>ii. Facilitating change</em></strong></p><p>a. Removing organisational obstacles to change and providing adequate support and funding.</p><p>b. Ensure buy-in from front-line personnel and ensure their voices are heard and supported.</p><p>c. Transition to new data management models through the support of tools such as eTrac and mobile solutions such as Nutshell Apps.</p><p><strong><em>iii. Embedding change</em></strong></p><p>a. Ensure positive outcomes are captured, celebrated and maintained.</p><p>b. Promote best practice so value is maximised.</p><p>c. ‘Sharpen the saw’ and promote continuous improvement.</p><h3>Managing people and culture alongside new technology</h3><p>A popular misconception is that as new technologies emerge, the risk to jobs and livelihoods is increased. There is also the concern that removing the human element from some tasks, such as concerns over Driver-Only Operation (DOO) on some franchises, poses a threat to safety. Even though in this case, statistics cited by the RSSB show that passenger risk from train dispatch is only 1 per 850 million journeys. <a href="#_ftn50">[50]</a> It’s clear that both emotional and rational cases need to be considered.</p><p>Improvements in technology have replaced elements of human behaviour for centuries. Evidence from the World Economic Forum shows that this has led to a <em>growth</em> in employment, rather than decline. <a href="#_ftn51">[51]</a> It is technology that has driven massive improvements in both productivity and living standards. This requires both upskilling existing jobs and creating new ones. Indeed, many jobs across the railway industry today either did not exist or have changed considerably over recent decades. The fear of legions of workers being sent to the glue factory is unlikely to occur.</p><p>Whilst technology is improving at an ever-increasing rate, today’s railway personnel all have skills and abilities that machines and advanced software will not be able to replicate. Sophisticated tasks such as making infrastructure repairs or conducting maintenance safety checks require dexterity far beyond what technology can currently deliver.</p><p>Not just this, but the industry knowledge and experience of those that work in rail cannot be replicated. Workers adapt instantaneously to new and challenging situations; adjusting how they interpret scenarios, problem-solve, use their judgement and exercise tasks. This level of flexibility and intuition will only be enhanced by new technologies such as AR; not replaced.</p><p>Combining new technologies with existing human skills will lead to improved safety and productivity across the industry.</p><p>The enabler of this is an interface between our physical reality and the digital world. AR is the medium of delivery. It allows staff to enhance their existing capability and take full advantage of the opportunities that data provides.</p><p>In doing this, AR enables everyone in the industry to immerse themselves fully in the digital railway and enjoy all the opportunities that it can offer.</p><h3>Conclusion</h3><p>The world wide web was created to share documents at the CERN laboratory. The internet, as it became, has transformed business and social interactions.</p><p>AR promises a new profound shift that will change these interactions far beyond what is envisioned today.</p><p>The rail industry is rich with data; yet historically it has been largely underutilised in operations. Encouragingly with the emergence of the Digital Railway, the potential the industry can unlock by analysing, understanding and utilising its data is considerable. This will allow for a truly predictive, rather than reactive, safety management process. <a href="#_ftn52">[52]</a></p><p>Finally, it is important to frame the use of AR within the context of safety, rather than over-evangelise it as a technological wonder. Failure to do so can lead to sceptics viewing it cynically as an unproven novelty.</p><p>Instead, AR should be seen first and foremost as a tool to improve both safety and productivity. If implemented effectively, the industry and the country will benefit significantly for years to come.</p><h3>About the Author</h3><p>David Smith is a Programme Manager for OnTrac Ltd based in Gateshead, United Kingdom.</p><h3>About OnTrac</h3><p>OnTrac are a trusted software partner to over 30,000 users across the rail industry. With offices in both Gateshead and London, we create products that streamline efficiencies, boost productivity and keep rail connected.</p><p>For more details, please visit our website at <a href="http://www.on-trac.co.uk/">www.on-trac.co.uk</a></p><p>To see how our products could benefit you, please visit <a href="http://www.on-trac.co.uk/products">www.on-trac.co.uk/products</a></p><p>Our mobile app platform is Nutshell Apps. Nutshell allows users with no previous coding experience to create and publish apps using a unique drag-and-drop interface. For more information, please visit <a href="http://www.nutshellapps.com/">www.nutshellapps.com</a></p><p>OnTrac are proudly part of the Tracsis Group — <a href="http://www.tracsis.com/">www.tracsis.com</a></p><p><a href="#_ftnref1">[1]</a> <a href="https://www.statista.com/statistics/591181/global-augmented-virtual-reality-market-size/">https://www.statista.com/statistics/591181/global-augmented-virtual-reality-market-size/</a></p><p><a href="#_ftnref2">[2]</a> <a href="https://www.ge.com/reports/how-augmented-reality-is-poised-to-transform-your/">https://www.ge.com/reports/how-augmented-reality-is-poised-to-transform-your/</a></p><p><a href="#_ftnref3">[3]</a> <a href="https://upskill.io/landing/upskill-and-boeing/">https://upskill.io/landing/upskill-and-boeing/</a></p><p><a href="#_ftnref4">[4]</a> <a href="http://whatis.techtarget.com/definition/augmented-reality-AR">http://whatis.techtarget.com/definition/augmented-reality-AR</a></p><p><a href="#_ftnref5">[5]</a> <a href="https://play.google.com/store/apps/details?id=com.bmw.bmwivisualiser&amp;hl=en_GB">https://play.google.com/store/apps/details?id=com.bmw.bmwivisualiser&amp;hl=en_GB</a></p><p><a href="#_ftnref6">[6]</a> For more details, please visit: <a href="http://www.on-trac.co.uk/products">www.on-trac.co.uk/products</a></p><p><a href="#_ftnref7">[7]</a> Image Credit: Johanna Ungeheuer (johanna.ungeheuer@on-trac.co.uk)</p><p><a href="#_ftnref8">[8]</a> <a href="https://www.military.com/defensetech/2016/05/19/watch-augmented-reality-tablets-used-to-build-ships">https://www.military.com/defensetech/2016/05/19/watch-augmented-reality-tablets-used-to-build-ships</a></p><p><a href="#_ftnref9">[9]</a> <a href="https://hbr.org/2017/11/a-managers-guide-to-augmented-reality">https://hbr.org/2017/11/a-managers-guide-to-augmented-reality</a></p><p><a href="#_ftnref10">[10]</a> Image Credit: Johanna Ungeheuer (johanna.ungeheuer@on-trac.co.uk)</p><p><a href="#_ftnref11">[11]</a> <a href="http://www.boeing.com/features/2018/01/augmented-reality-01-18.page">http://www.boeing.com/features/2018/01/augmented-reality-01-18.page</a></p><p><a href="#_ftnref12">[12]</a> <a href="https://www.recode.net/2015/6/8/11563374/boeing-says-augmented-reality-can-make-workers-better-faster">https://www.recode.net/2015/6/8/11563374/boeing-says-augmented-reality-can-make-workers-better-faster</a></p><p><a href="#_ftnref13">[13]</a> <a href="https://www.kpn.com/zakelijk/grootzakelijk/ict-consulting.htm">https://www.kpn.com/zakelijk/grootzakelijk/ict-consulting.htm</a></p><p><a href="#_ftnref14">[14]</a> Image Credit: Johanna Ungeheuer (johanna.ungeheuer@on-trac.co.uk)</p><p><a href="#_ftnref15">[15]</a> <a href="https://pdfs.semanticscholar.org/3842/6ea4a76f6d272ff1953e9d57043baf712b58.pdf">https://pdfs.semanticscholar.org/3842/6ea4a76f6d272ff1953e9d57043baf712b58.pdf</a></p><p><a href="#_ftnref16">[16]</a> <a href="http://www.mpec.co.uk/">http://www.mpec.co.uk/</a></p><p><a href="#_ftnref17">[17]</a> <a href="http://fluid.media.mit.edu/realityeditor">http://fluid.media.mit.edu/realityeditor</a></p><p><a href="#_ftnref18">[18]</a> <a href="https://a16z.com/2017/12/07/summit-ai-update-frank-chen/">https://a16z.com/2017/12/07/summit-ai-update-frank-chen/</a></p><p><a href="#_ftnref19">[19]</a> <a href="https://www.ge.com/reports/smart-specs-ok-glass-fix-jet-engine/">https://www.ge.com/reports/smart-specs-ok-glass-fix-jet-engine/</a></p><p><a href="#_ftnref20">[20]</a> Image Credit: Johanna Ungeheuer (johanna.ungeheuer@on-trac.co.uk)</p><p><a href="#_ftnref21">[21]</a> <a href="http://www.on-trac.co.uk/products">www.on-trac.co.uk/products</a></p><p><a href="#_ftnref22">[22]</a> <a href="http://www.on-trac.co.uk/products.">www.on-trac.co.uk/products.</a> To arrange a demonstration, please contact us via details on our website.</p><p><a href="#_ftnref23">[23]</a> <a href="https://www.gov.uk/government/news/report-182017-overturning-of-a-tram-at-sandilands-junction-croydon">https://www.gov.uk/government/news/report-182017-overturning-of-a-tram-at-sandilands-junction-croydon</a></p><p><a href="#_ftnref24">[24]</a> <a href="https://www.sciencedirect.com/science/article/pii/S2212017313004921">https://www.sciencedirect.com/science/article/pii/S2212017313004921</a></p><p><a href="#_ftnref25">[25]</a> <a href="https://www.rssb.co.uk/Library/risk-analysis-and-safety-reporting/2015-02-str-fatigue-contribution-to-railway-incidents.pdf">https://www.rssb.co.uk/Library/risk-analysis-and-safety-reporting/2015-02-str-fatigue-contribution-to-railway-incidents.pdf</a></p><p><a href="#_ftnref26">[26]</a> Paonessa, F; Rail Engineer Magazine (Issue 156, October 2017), p62.</p><p><a href="#_ftnref27">[27]</a> Prosser, I; Rail Technology Magazine (Vol 18 №5, Oct/Nov 2017), p75.</p><p><a href="#_ftnref28">[28]</a> Slater, A; Rail Technology Magazine (Dec 2017 / Jan 2018), p31.</p><p><a href="#_ftnref29">[29]</a> <a href="https://www.networkrailmediacentre.co.uk/news/network-rail-response-to-orr-201415-annual-assessment">https://www.networkrailmediacentre.co.uk/news/network-rail-response-to-orr-201415-annual-assessment</a></p><p><a href="#_ftnref30">[30]</a> <a href="https://cdn.networkrail.co.uk/wp-content/uploads/2017/11/Consultation-on-proposed-changes-to-the-wording-of-track-access-contracts-CP6.pdf">https://cdn.networkrail.co.uk/wp-content/uploads/2017/11/Consultation-on-proposed-changes-to-the-wording-of-track-access-contracts-CP6.pdf</a></p><p><a href="#_ftnref31">[31]</a> <a href="https://www.railengineer.uk/2017/10/04/its-all-down-to-good-planning-an-interview-with-network-rails-francis-paonessa/">https://www.railengineer.uk/2017/10/04/its-all-down-to-good-planning-an-interview-with-network-rails-francis-paonessa/</a></p><p><a href="#_ftnref32">[32]</a> Flower, T; Rail Technology Magazine (Dec / Jan 2018), p29.</p><p><a href="#_ftnref33">[33]</a> <a href="https://hbr.org/2017/11/a-managers-guide-to-augmented-reality">https://hbr.org/2017/11/a-managers-guide-to-augmented-reality</a></p><p><a href="#_ftnref34">[34]</a> <a href="http://www.dhl.com/content/dam/downloads/g0/about_us/logistics_insights/csi_augmented_reality_report_290414.pdf">http://www.dhl.com/content/dam/downloads/g0/about_us/logistics_insights/csi_augmented_reality_report_290414.pdf</a></p><p><a href="#_ftnref35">[35]</a> <a href="https://readwrite.com/2017/08/01/intel-eliminates-wearables-division/">https://readwrite.com/2017/08/01/intel-eliminates-wearables-division/</a></p><p><a href="#_ftnref36">[36]</a> <a href="https://tracsistraffic.com/">https://tracsistraffic.com/</a> Retrieved: January 2018.</p><p><a href="#_ftnref37">[37]</a> Kessell, C; Rail Engineer (Issue 156, October 2017), p65.</p><p><a href="#_ftnref38">[38]</a> <a href="http://thearea.org/augmented-reality-can-increase-productivity/">http://thearea.org/augmented-reality-can-increase-productivity/</a></p><p><a href="#_ftnref39">[39]</a> <a href="http://www.d2rail.co.uk/wp-content/uploads/2017/12/RE-December-2017-Mercury-D2.pdf">http://www.d2rail.co.uk/wp-content/uploads/2017/12/RE-December-2017-Mercury-D2.pdf</a></p><p><a href="#_ftnref40">[40]</a> Image Credit: Johanna Ungeheuer (johanna.ungeheuer@on-trac.co.uk)</p><p><a href="#_ftnref41">[41]</a> <a href="http://orr.gov.uk/__data/assets/pdf_file/0011/452/pr13-final-determination.pdf">http://orr.gov.uk/__data/assets/pdf_file/0011/452/pr13-final-determination.pdf</a></p><p><a href="#_ftnref42">[42]</a> <a href="http://www.mpec.co.uk/">http://www.mpec.co.uk/</a></p><p><a href="#_ftnref43">[43]</a> <a href="https://www.kpn.com/zakelijk/grootzakelijk/ict-consulting.htm">https://www.kpn.com/zakelijk/grootzakelijk/ict-consulting.htm</a></p><p><a href="#_ftnref44">[44]</a> <a href="https://www.rssb.co.uk/Library/risk-analysis-and-safety-reporting/2017-07-report-annual-safety-performance-report.pdf">https://www.rssb.co.uk/Library/risk-analysis-and-safety-reporting/2017-07-report-annual-safety-performance-report.pdf</a></p><p><a href="#_ftnref45">[45]</a> Image Credit: Johanna Ungeheuer (johanna.ungeheuer@on-trac.co.uk)</p><p><a href="#_ftnref46">[46]</a> Image Credit: Johanna Ungeheuer (johanna.ungeheuer@on-trac.co.uk)</p><p><a href="#_ftnref47">[47]</a> For more information, please visit <a href="http://www.nutshellapps.com/">www.nutshellapps.com</a></p><p><a href="#_ftnref48">[48]</a> <a href="https://www.gov.uk/government/news/report-152017-serious-irregularity-at-cardiff-east-junction">https://www.gov.uk/government/news/report-152017-serious-irregularity-at-cardiff-east-junction</a></p><p><a href="#_ftnref49">[49]</a> <a href="https://www.theregister.co.uk/2017/11/20/iphone_x_the_reasonably_priced_ar_set/">https://www.theregister.co.uk/2017/11/20/iphone_x_the_reasonably_priced_ar_set/</a></p><p><a href="#_ftnref50">[50]</a> <a href="https://www.rssb.co.uk/Pages/about-rssb/Aspects-of-automation.aspx">https://www.rssb.co.uk/Pages/about-rssb/Aspects-of-automation.aspx</a></p><p><a href="#_ftnref51">[51]</a> <a href="https://www.weforum.org/agenda/2012/10/king-ludd-is-still-dead/">https://www.weforum.org/agenda/2012/10/king-ludd-is-still-dead/</a></p><p><a href="#_ftnref52">[52]</a> Hayward, V; Rail Technology Magazine (Vol 18 №5, Oct/Nov 2017), p81.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=4c49621f00bc" width="1" height="1" alt="">]]></content:encoded>
        </item>
    </channel>
</rss>