<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0" xmlns:cc="http://cyber.law.harvard.edu/rss/creativeCommonsRssModule.html">
    <channel>
        <title><![CDATA[Stories by AG on Medium]]></title>
        <description><![CDATA[Stories by AG on Medium]]></description>
        <link>https://medium.com/@ans-goy28?source=rss-7d2405afb2ae------2</link>
        <image>
            <url>https://cdn-images-1.medium.com/fit/c/150/150/1*Zj5m0JUiqGGV4pxd6Zoyow.jpeg</url>
            <title>Stories by AG on Medium</title>
            <link>https://medium.com/@ans-goy28?source=rss-7d2405afb2ae------2</link>
        </image>
        <generator>Medium</generator>
        <lastBuildDate>Thu, 19 Nov 2026 18:56:10 GMT</lastBuildDate>
        <atom:link href="https://medium.com/@ans-goy28/feed" rel="self" type="application/rss+xml"/>
        <webMaster><![CDATA[yourfriends@medium.com]]></webMaster>
        <atom:link href="http://medium.superfeedr.com/" rel="hub"/>
        <item>
            <title><![CDATA[Day Ahead Market (DAM) and Real Time Market (RTM)]]></title>
            <link>https://ans-goy28.medium.com/day-ahead-market-dam-and-real-time-market-rtm-788b3f072a89?source=rss-7d2405afb2ae------2</link>
            <guid isPermaLink="false">https://medium.com/p/788b3f072a89</guid>
            <category><![CDATA[power-system]]></category>
            <category><![CDATA[energy]]></category>
            <category><![CDATA[electricity-market]]></category>
            <category><![CDATA[electrical-engineering]]></category>
            <dc:creator><![CDATA[AG]]></dc:creator>
            <pubDate>Sat, 29 May 2021 23:52:31 GMT</pubDate>
            <atom:updated>2021-05-29T23:52:31.445Z</atom:updated>
            <content:encoded><![CDATA[<p>Another way of classification of auction market is based on time when electricity market is cleared. They are broadly categorized as day-ahead market (DAM) and real-time market (RTM).</p><p>DAM is also known as forward market and schedules resources at each hour of the following day. Both energy and ancillary services can be traded in DAM. It is cleared a day before based on forecasted load data for following day. DAM provides participants secured prices and reduces their vulnerability to price fluctuations that may occur in real-time markets. Therefore, DAM is a hedge against real-time price volatility for both participants (consumers and producers).</p><p>Whereas RTM aims to ensure the reliability of power systems by balancing demand and supply of electric power in real-time. As, real-time values of load and generation and even transmission system can differ from DAM schedules. It is also known as balancing market. It is cleared in real-time based on response-time of resources available for accommodating real-time energy imbalances. These can vary from few seconds to minutes based on available resources type. Examples of these resources includes automatic generation control (AGC), spinning, non-spinning and supplemental reserves. The balancing energy price is typically calculated at 10-minute or 5-minute intervals.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=788b3f072a89" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Power System Protection: Need and Objective]]></title>
            <link>https://ans-goy28.medium.com/power-system-protection-need-and-objective-feb9b45ff167?source=rss-7d2405afb2ae------2</link>
            <guid isPermaLink="false">https://medium.com/p/feb9b45ff167</guid>
            <category><![CDATA[power-system]]></category>
            <category><![CDATA[electrical]]></category>
            <category><![CDATA[electrical-engineering]]></category>
            <category><![CDATA[power-system-protection]]></category>
            <dc:creator><![CDATA[AG]]></dc:creator>
            <pubDate>Sat, 22 May 2021 05:37:13 GMT</pubDate>
            <atom:updated>2021-05-22T05:37:13.052Z</atom:updated>
            <content:encoded><![CDATA[<p>Power system protection is a vital subject that needs to be addressed by engineers for achieving a safe and reliable operation of the whole system. There are various kinds of faults which can occur in a power system. The broad classification of these faults can be balanced versus unbalanced and short-circuit (shunt) versus open-circuit (series). This article focusses on answering two important questions i.e need of protection in power system and its objective.</p><p><strong>Need-</strong></p><p>The main requirement of protection is for human and equipment safety. As the faults in power system results in below listed effects:</p><p>· Shock or burn to humans from direct contact/exposure to the faulted equipment</p><p>· Arcing and dissipation of significantly large amount of energy</p><p>· Insulation damage</p><p>· Equipment damage</p><p>· Damages to adjacent plants (loss of generators) and loads (motor stall) due to voltage dips</p><p>· Loss of synchronism and may lead to cascading tripping (blackout)</p><p>The above-mentioned effects are catastrophic in nature and hampers the power system operability, reliability and security.</p><p><strong>Objective-</strong></p><p>There are other factors as well which makes requirement of protection essential other than human and equipment safety. Below are some of the key objectives for power system protection:</p><p>· Protection of humans</p><p>· Protection of power system components</p><p>· Provide reliable (uninterruptable) supply of energy to the end consumers</p><p>· Localization and separation of the faulted part of the system</p><p>· Restoration of the power system</p><p>· Minimization of supply interruption/disruption to nearby healthy sections of the system</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=feb9b45ff167" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Economic Load Dispatch (ELD)]]></title>
            <link>https://ans-goy28.medium.com/economic-load-dispatch-eld-9526a3331263?source=rss-7d2405afb2ae------2</link>
            <guid isPermaLink="false">https://medium.com/p/9526a3331263</guid>
            <category><![CDATA[energy-optimization]]></category>
            <category><![CDATA[electricity-market]]></category>
            <category><![CDATA[electricity]]></category>
            <category><![CDATA[power-system]]></category>
            <dc:creator><![CDATA[AG]]></dc:creator>
            <pubDate>Sat, 15 May 2021 00:45:26 GMT</pubDate>
            <atom:updated>2021-05-15T00:45:26.332Z</atom:updated>
            <content:encoded><![CDATA[<p><strong>Definition-</strong></p><p>Economic Load Dispatch (ELD) is primarily a decision problem which deals with allocating of total load to all available and synchronized generation units economically. The main objective to minimize the total cost of generation to meet given demand with fulfilling the system constraints. It is executed by system operator (SO) at dispatch stage i.e every 5 minutes.</p><p><strong>Key Assumptions-</strong></p><p>1) Vertically integrated environment — SO has access to generation units’ cost function and is responsible for their dispatch.</p><p>2) Load aggregated at a single node — Whole system load is considered at a single node. Spatial load distribution is neglected.</p><p>3) Transmission losses neglected — For simplistic, these losses are ignored. However, such losses are significant in real scenario and can be incorporated by introducing an approximate loss formula (like Kirchmayer’s Loss Formula — refer eqn-(ii)).</p><p>4) Reactive power demand neglected — All bus voltages and reactive power relations are ignored.</p><p>5) Committed generation units considered for ELD — Unit commitment problem is already executed to determine the units which will be on-line at that time interval.</p><p><strong>Mathematical Model-</strong></p><p>· Objective Function — Minimize the total cost of generation (refer eqn-(1))</p><p>· Demand-Supply Balance — Generation amount shall meet the total system demand (refer eqn-(2) for w/o losses model and eqn-(i) &amp; (ii) for with losses model consideration).</p><p>· Generation Units’ Limits — Each generation unit is restricted by limit on min and max generation capability (refer eqn-(3) &amp; (4)).</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/712/1*N0cNKx4mHoHFoTwCZL1w9A.png" /><figcaption>Mathematical Model for ELD</figcaption></figure><p>where,</p><p>Ci(Pi): Cost function of generation unit ‘i’ (quadratic assumed) ($/hr)</p><p>PD: System demand (MW)</p><p>Pi: Generation of unit ‘i’ (MW)</p><p>PiMin: Minimum generation of unit ‘i’ (MW)</p><p>PiMax: Maximum generation of unit ‘i’ (MW)</p><p>N: Number of committed generation units</p><p>PLoss: Power loss (MW)</p><p>Pm,Pn: Power generation from all sources (MW)</p><p>Bmn: Loss coefficients (Watt/MW2)</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=9526a3331263" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Uniform Market Price (UMP) vs Locational Marginal Price (LMP)]]></title>
            <link>https://ans-goy28.medium.com/uniform-market-price-ump-vs-locational-marginal-price-lmp-d718391a5881?source=rss-7d2405afb2ae------2</link>
            <guid isPermaLink="false">https://medium.com/p/d718391a5881</guid>
            <category><![CDATA[electrical-engineering]]></category>
            <category><![CDATA[power-system]]></category>
            <category><![CDATA[electricity-market]]></category>
            <dc:creator><![CDATA[AG]]></dc:creator>
            <pubDate>Sat, 08 May 2021 03:21:28 GMT</pubDate>
            <atom:updated>2021-05-08T05:36:16.642Z</atom:updated>
            <content:encoded><![CDATA[<p><strong>Definition-</strong></p><p>Electricity markets are classified in numerous ways based on various criteria. One of the classifications is based on pricing methods which broadly categorizes into two groups i.e uniform market price (UMP) and locational marginal price (LMP).</p><p>In UMP or single-price market, the market-clearing price (MCP) is obtained by a merit order algorithm; where energy operator/broker arranges all participating consumers’ bids in decreasing level and all participating generators’ offers in increasing manner. The point of intersection of these demand bids and supply offers curves is where maximum social welfare occurs and hence, is selected as MCP.</p><p>Whereas, in LMP or nodal marginal price is determined by solving an optimal power flow (OPF). A mathematical model is developed and solved through optimization solver. The optimization solver aims to figure out the feasible solution with maximizing of social welfare with fulfilling all the constraints and considering generators’ offers and customers’ bids.</p><p><strong>Advantages and disadvantages-</strong></p><p>· UMP based market requires separate technique to account for effect of transmission congestion and losses. These separate heuristic methods result in approximate and non-optimal nodal prices and therefore, makes single-price merit order approach economically less efficient. On the other hand, LMP based market model explicitly consider transmission congestion and losses while defining the model. And, therefore the output obtained is economically more efficient.</p><p>· UMP based merit order approach is relatively very simple and quick computationally in comparison to LMP based market; as nodal marginal price market requires a non-linear numerical search algorithm to solve OPF problem.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=d718391a5881" width="1" height="1" alt="">]]></content:encoded>
        </item>
    </channel>
</rss>