<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0" xmlns:cc="http://cyber.law.harvard.edu/rss/creativeCommonsRssModule.html">
    <channel>
        <title><![CDATA[Stories by CIKIT Electricals and Technologies on Medium]]></title>
        <description><![CDATA[Stories by CIKIT Electricals and Technologies on Medium]]></description>
        <link>https://medium.com/@cikittechnologies?source=rss-a728dc5307e0------2</link>
        <image>
            <url>https://cdn-images-1.medium.com/fit/c/150/150/1*YUC2OrC_7dsRlPnbsM3NxQ.jpeg</url>
            <title>Stories by CIKIT Electricals and Technologies on Medium</title>
            <link>https://medium.com/@cikittechnologies?source=rss-a728dc5307e0------2</link>
        </image>
        <generator>Medium</generator>
        <lastBuildDate>Thu, 19 Nov 2026 11:57:21 GMT</lastBuildDate>
        <atom:link href="https://medium.com/@cikittechnologies/feed" rel="self" type="application/rss+xml"/>
        <webMaster><![CDATA[yourfriends@medium.com]]></webMaster>
        <atom:link href="http://medium.superfeedr.com/" rel="hub"/>
        <item>
            <title><![CDATA[Testing Procedure of ESE Air Terminal]]></title>
            <link>https://medium.com/@cikittechnologies/testing-procedure-of-ese-air-terminal-92c31b0017b6?source=rss-a728dc5307e0------2</link>
            <guid isPermaLink="false">https://medium.com/p/92c31b0017b6</guid>
            <dc:creator><![CDATA[CIKIT Electricals and Technologies]]></dc:creator>
            <pubDate>Mon, 27 Mar 2023 06:29:58 GMT</pubDate>
            <atom:updated>2023-03-27T06:29:58.582Z</atom:updated>
            <content:encoded><![CDATA[<p>In the <a href="https://cikit.in/ese-lightning-air-terminal/">ESE</a> system, the internal design arrangement senses lightning down streamers and triggers upward leaders prior to other passive objects in the structure. Since the upward streamer is triggered in advance when compared to other conventional air terminals, the area protected by the ESE terminal will be larger than that of conventional terminals.</p><p>NFC 17–102/2011 has given the testing sequence of the ESE lightning air terminal.</p><p>1) Mechanical Dimension Test</p><p>2) Environmental Test</p><p>3) Electrical Test</p><p>4) Early Streamer Emission Test.</p><p><strong>Mechanical Dimension Test:</strong></p><p>During testing, all the dimensions of the air terminals will be physically measured and the actual values will be verified with the dimensions given by the manufacturers.</p><p><strong>2. Environmental Test:</strong></p><p>NFC 17/102 explains about two different types of tests to be performed on the ESE air terminal sample to ensure its operation on adverse environmental conditions. The tests are as follows.</p><ul><li>Salt mist treatment test</li><li>Humid sulphurous atmosphere treatment test</li></ul><p><strong>2.1 Salt Mist treatment</strong></p><p>Salt mist treatment has to be done as per NF EN 60068 –52 standard with level 2 severity. The sample should be subjected to salt &amp; fog (sodium chloride solution) atmosphere for 3 cycle -72 hours</p><p><strong>2.2 Humid Sulphurous Atmosphere Treatment:</strong></p><p>The sample should be tested in a humid sulphurous atmosphere with seven cycles and a sulphur dioxide concentration of 667 ppm (in volume).</p><p>Each cycle should be carried for 24 hours. There are two periods</p><ul><li>Heating Period</li><li>Standing Period</li></ul><p><strong>Heating Period:</strong></p><p>The sample should be tested at a temperature of 40°C ± 3°C for 8 hours.</p><p><strong>Standing period:</strong></p><p>The sample should be tested for 16-hour standing period.</p><p>The ESE is subjected to the following tests without cleaning after done salt &amp; Sulphur mist test.</p><p><strong>Electrical Test:</strong></p><p>The ESE air terminal should be tested with a minimum of 100kA lightning impulse current at 10/350 µs waveform</p><p><strong>Early Streamer Emission Test:</strong></p><p><a href="https://cikit.in/ese-lightning-air-terminal/">ESE</a> should be tested for the triggering time given by the manufacturers. The difference between reference wave &amp; measuring wave is the triggering time ‘∆t’.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/242/0*OpGK_SoMOGvVvTcU.png" /></figure><p>As per NFC 17–102/2011, the value of ‘∆t’ should be between 10µs and 60µs. An air terminal is considered as ESEAT only if the triggering advance time is greater than 10µs, also the value of ‘∆t’ being greater than 60µs, it is to be still considered as maximum 60µs for all design calculations.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/185/0*lNqup880rIZLc2Rb.png" /></figure><p><strong>Why do the sequences need to be followed?</strong></p><p>The sequence of testing is kept in such a manner to inspect and confirm that the <a href="https://cikit.in/ese-lightning-air-terminal/">ESE</a> sample after going through the rigorous environmental tests and current carrying tests, the sample is still be able to sense downward leaders and trigger upward leaders at an advanced time than the conventional lightning air terminals. That’s exactly why the standard says that these tests are to be carried out in the same sequence with the same sample as mentioned in their requirements to qualify the sample as an <a href="https://cikit.in/ese-lightning-air-terminal/">ESE</a> type Air Terminal.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=92c31b0017b6" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Equipotential Bonding]]></title>
            <link>https://medium.com/@cikittechnologies/equipotential-bonding-3b33b94a38f0?source=rss-a728dc5307e0------2</link>
            <guid isPermaLink="false">https://medium.com/p/3b33b94a38f0</guid>
            <category><![CDATA[equipotential]]></category>
            <category><![CDATA[engineering]]></category>
            <category><![CDATA[earthing]]></category>
            <category><![CDATA[protection]]></category>
            <category><![CDATA[lightning]]></category>
            <dc:creator><![CDATA[CIKIT Electricals and Technologies]]></dc:creator>
            <pubDate>Sat, 24 Sep 2022 08:20:33 GMT</pubDate>
            <atom:updated>2022-09-24T08:20:33.338Z</atom:updated>
            <content:encoded><![CDATA[<p>Introduction:</p><p>The electrical connection of all exposed conductive parts and extraneous conductive parts to maintain substantially equal potential is called equipotential bonding. The potential equalization between all surfaces which are thus bonded.</p><p><strong>Exposed conductive part:</strong></p><p>Noncurrent carrying conductor in equipment which can be touched and not a live conductor and it may become live conductor during fault condition.</p><p><strong>Extraneous conductive part:</strong></p><p>A conductive part which carry potential include earth potential but not forming in electrical installation</p><p>In a building installation, equipotential bonding conductors shall be interconnected with the following conductive parts:</p><ul><li>Protective conductor;</li><li>Earth continuity conductor; and</li><li>Risers of air-conditioning systems and heating systems (if any).</li></ul><p>The zone is created by connecting all extraneous conductive part by means of an equipotential bonding conductor to the main earthing terminal or earth electrode and it is completed by connecting all exposed conductive part to the main earthing terminal by using protective conductor. Such zone is called equipotential zone</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/584/1*36iJPcDTDSTpKJk559BS7A.png" /></figure><p>Where,</p><p>1 = Equipotential bonding conductor</p><p>2 = Protective conductor</p><p>3 = Earthing conductor.</p><p>M = exposed conductive parts</p><p>P = incoming metallic service</p><p>C = extraneous conductive parts</p><p>EE= Earthing Electrode</p><p>This zone does not mean that voltage cannot exist between conductive parts during faulty condition. The voltage still exists between exposed and extraneous conductive part but voltage will minimize due to the application of bonding.</p><p>The extraneous conductive parts that are required to be bonded to the main earthing terminal of the installation (or to the earth electrode of the installation) include:</p><p>a) Gas pipes;</p><p>b) Other service pipes and ducting;</p><p>c) Risers and pipes of fire protection equipment;</p><p>d) Exposed metallic parts of the building structure; and</p><p>e) Lightning conductors.</p><p>There are two aspects of equipotential bonding</p><ul><li>Main equipotential bonding — service enters the building</li><li>Supplementary bonding — bonding within rooms particularly kitchen and bathrooms</li></ul><p><strong>Main equipotential bonding</strong></p><p>A main equipotential bonding with a main earthing bar shall be provided near the main service entrance. Connections shall be made to the following parts by bonding conductors:</p><ul><li>Lightning conductor;</li><li>Earthing systems of the electric power distribution system;</li><li>The central heating system;</li><li>The conductive water supply line;</li><li>The conductive parts of the waste water line;</li><li>The conductive parts of the gas supply; and</li><li>The structural metal framework of the building, (if applicable). All the bonded pipelines should be metal, if the pipelines are in insulator like plastics, no need to do the bonding.</li></ul><p><strong>Supplementary bonding</strong></p><p>The supplementary bonding or additional are necessary in the location where the increase of electric shock. In domestic premises, the room having bath or shower, kitchens and in the area surrounding of swimming pool is consider as high risk for electric shock.</p><p>The following requirements shall be fulfilled:</p><ul><li>The impedance between extraneous conductive parts and the equipotential bonding bar shall not exceed 0 1 Ω.</li><li>All equipotential bonding conductors shall be insulated, the insulation being coloured green yellow.</li><li>Equipotential conductors between permanently installed extraneous conductive parts and the equipotential bonding bar shall have a cross-sectional area of not less than 4 mm2 copper or copper equivalents</li><li>The equipotential bonding bar, if any, should have adequate mechanical and electrical properties, and resistance against corrosion.</li></ul><p><strong>Conclusion:</strong></p><p>It should be clearly understood that, there are number of supply other than electrical supply which employ metallic connection near by the conductive parts. During faulty condition, the potential difference between these parts will cause severe electric shock to personnel and also chances to occur arcing between this. So Equipotential bonding is necessary to eliminate the voltage gradient or difference in voltage potential in exposed conductive parts and extraneous conductive parts.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=3b33b94a38f0" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[“Periodical Maintenance of LPS to Enhance Overall Life and Performance”]]></title>
            <link>https://medium.com/@cikittechnologies/periodical-maintenance-of-lps-to-enhance-overall-life-and-performance-b6e71b12f35f?source=rss-a728dc5307e0------2</link>
            <guid isPermaLink="false">https://medium.com/p/b6e71b12f35f</guid>
            <category><![CDATA[engine]]></category>
            <category><![CDATA[lightning]]></category>
            <category><![CDATA[earthing]]></category>
            <category><![CDATA[electrical]]></category>
            <dc:creator><![CDATA[CIKIT Electricals and Technologies]]></dc:creator>
            <pubDate>Tue, 06 Sep 2022 05:49:37 GMT</pubDate>
            <atom:updated>2022-09-06T05:49:37.012Z</atom:updated>
            <content:encoded><![CDATA[<p><strong>Introduction:</strong></p><p>The main and most effective measure for protection of structures against physical damage is considered to be the lightning protection system (LPS). The components of LPS are more prone to direct lightning strikes and corrosion due to local environment. Hence proper inspection and maintenance should be carried out periodically as described by IEC 62305 to ensure the good operating condition of LPS. Inspection and maintenance shall not be conducted during threat of thunderstorms. In our last article we have explained about inspection of lightning protection system. In this article we shall discuss about testing and maintenance of lightning protection system.</p><p><strong>Testing:</strong></p><ul><li>Performing continuity tests, especially continuity of those parts of the LPS which were not visible for performing visual inspection;</li><li>Conducting earth resistance tests of the earth-termination system. The isolated and combined earth resistance values should be measured and the results should be recorded in an LPS inspection report.</li></ul><p>• If the resistance to earth of the earth-termination system as a whole exceeds 10Ω, the value can be improved by installing additional earth electrodes. An LPS should be inspected whenever any modification or repairs are made to a protected structure and also following any known lightning discharge to the LPS. The results of testing, visual inspection, condition of air terminals and conductors, effects of corrosion, condition of joints and earth resistance values measured should be documented in an LPS inspection report. If an inspection shows that repairs are necessary, those repairs should be executed without delay and not be postponed until the next maintenance cycle.</p><p><strong>Maintenance of LPS:</strong></p><p>The LPS should be maintained regularly to ensure that it continues to fulfill the requirements throughout the lifetime of the system. LPS maintenance should become a part of the overall maintenance program for the structure. The frequency of maintenance of an LPS depends on the following factors.</p><ol><li>Weather and environment-related degradation</li><li>Exposure to actual lightning damage</li><li>Protection level of design Maintenance procedure contains a list of routine items to be checked (Checklist) to ensure the proper operation of the system.</li></ol><p>The maintenance procedure for LPS should contain the following items.</p><p>— Verification of all LPS conductors and system components;</p><p>— Verification of the electrical continuity of the LPS installation;</p><p>— Measurement of the resistance to earth of the earth-termination system;</p><p>— Verification of SPDs;</p><p>— Re-fastening of components and conductors;</p><p>— Verification to ensure the effectiveness of the LPS has not been reduced after additions to, or changes in, the structure and its installations.</p><p>All the maintenance activities carried out for LPS should be recorded and the records should include the details of corrective actions taken. The maintenance report helps us to evaluate the components of LPS and the installation procedure. Those records can be used to update the maintenance procedures to prevent the damages.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=b6e71b12f35f" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Article on Foundation Earthing]]></title>
            <link>https://medium.com/@cikittechnologies/article-on-foundation-earthing-f3246d8cfe1c?source=rss-a728dc5307e0------2</link>
            <guid isPermaLink="false">https://medium.com/p/f3246d8cfe1c</guid>
            <category><![CDATA[lighting]]></category>
            <category><![CDATA[engineer]]></category>
            <category><![CDATA[earth]]></category>
            <category><![CDATA[protection]]></category>
            <category><![CDATA[electrical]]></category>
            <dc:creator><![CDATA[CIKIT Electricals and Technologies]]></dc:creator>
            <pubDate>Thu, 25 Aug 2022 09:56:52 GMT</pubDate>
            <atom:updated>2022-08-25T09:56:52.102Z</atom:updated>
            <content:encoded><![CDATA[<p>Earth-termination systems should perform the following tasks:</p><ul><li>Conduction of the lightning current into the earth;</li><li>Equipotential bonding between the down-conductors;</li></ul><p>• Potential control in the vicinity of conductive building walls. Foundation earthing meets all the above requirements. For large structures and industrial plants the foundation is normally reinforced. The reinforcing rods of the foundation, foundation slab and outer walls in the region below the soil surface of such structures form an excellent foundation earth electrode.</p><p>Advantage:</p><ul><li>The<a href="https://www.linkedin.com/posts/cikit-electricals-technologies_foundation-earthing-activity-6912739592899088384-x0p4?utm_source=share&amp;utm_medium=member_desktop"> foundation earthing </a>termination provides the very low earthing resistance for the dissipation of fault current</li><li>It can perform as an excellent equipotentialization reference</li></ul><p>• The concrete is of adequate construction and covers the foundation earth electrode by at least 50 mm; they are reasonably protected against corrosion</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/578/0*OigGqrY1sfKdimhY.png" /></figure><p><strong>Materials in Foundation</strong><a href="https://www.cikit.in/"><strong> Earthing:</strong></a></p><p>The reinforced rods of the foundation and buried walls can be used as foundation earth electrode. Reinforcing rods of concrete columns and walls standing on a foundation should be connected to the reinforcing rods of the foundation and to the conductive parts of the roof. Metals used for earth electrode should conform to the requirements as per IEC 62305 Part 3, selection of material and the behavior of the metal with respect to soil should also take into consideration. A further problem arises from electrochemical corrosion due to galvanic currents. Steel in concrete has approximately the same galvanic potential in the electrochemical series as copper in soil. Therefore, when steel in concrete is connected to steel in soil,a driving galvanic voltage of approximately 1V causes corrosion current to flow through the soil. Earth electrodes in soil should use copper, copper coated steel or stainless steel conductors where these are connected to steel in concrete. Upward routing of the conductors connected to the down-conductors can be performed on the brickwork, within the plaster or within the wall. The water-insulating layer often inserted below the structure foundation to reduce the humidity in basement floors provides consistent electrical isolation. The earth electrode should be installed under the foundation in the sub-concrete. A foundation earth electrode consisting of a network of mesh size not exceeding 10m shall be installed in the clean concrete layer at the bottom of the foundation pit.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/491/0*qogZ5FdUaq3kWQw1.png" /></figure><p>Where the groundwater level is high, the foundation of the structure should be isolated from subsoil water. A sealing waterproof layer should be applied to the outer surface of the foundation, which also provides electrical isolation. The usual practice in establishing such a waterproof foundation is to pour a clean layer of concrete approximately 10 cm to 15 cm in depth on the bottom of the foundation pit, onto which the isolation, and later the concrete foundation, is laid.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/939/0*JWF80T-BfxT8_j0D.png" /></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/922/0*POfDiTiZOrJbEsJe.png" /></figure><p>1-down-conductor</p><p>2-test joint</p><p>3-bonding conductor to the internal LPS</p><p>4- non-reinforced layer of concrete</p><p>5 -connecting conductor of the LPS</p><p>6 foundation earth electrode</p><p>7 damp proof membrane, watertight insulating layer</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=f3246d8cfe1c" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Article on “ Natural Component as a LPS Conductor”]]></title>
            <link>https://medium.com/@cikittechnologies/article-on-natural-component-as-a-lps-conductor-a80fa8d1fe2b?source=rss-a728dc5307e0------2</link>
            <guid isPermaLink="false">https://medium.com/p/a80fa8d1fe2b</guid>
            <category><![CDATA[electrical]]></category>
            <category><![CDATA[earthing]]></category>
            <category><![CDATA[lightning]]></category>
            <category><![CDATA[engineer]]></category>
            <category><![CDATA[protection]]></category>
            <dc:creator><![CDATA[CIKIT Electricals and Technologies]]></dc:creator>
            <pubDate>Tue, 09 Aug 2022 07:56:52 GMT</pubDate>
            <atom:updated>2022-08-09T07:57:16.106Z</atom:updated>
            <content:encoded><![CDATA[<p>Article on <a href="https://www.linkedin.com/posts/cikit-electricals-technologies_natural-component-as-a-lps-conductor-activity-6904768105340399616-_hoj?utm_source=linkedin_share&amp;utm_medium=member_desktop_web"><strong>“ Natural Component as a LPS Conductor”</strong></a></p><p><strong>Metallic Roofing:</strong></p><ul><li>LPS conductors and rods should be mechanically secured so that they are capable of withstanding stress due to wind or weather and work carried out on the roof surface.</li><li>Metal covering provided for mechanical protection of outer walls parapet capping may be used as a natural component of the air-termination, if there is no risk of fire ignition by melting metal.</li><li>The combustibility depends on the type of material under the metal cladding. The combustibility of the material employed should be confirmed by the contractor.</li></ul><p>• The roof sealing arrangement on metallic roofs, as with other types of roof, can be perforated by a lightning flash.</p><p>• In such a case, water can penetrate and leak through the roof at a point far from the striking point. If this possibility is to be avoided, a separate air-termination system should be installed.</p><p>• Roof coverings of conductive sheet which do not conform to condition in standard may be used as air terminations where melting at the striking point of lightning can be accepted.</p><ul><li>If this is not acceptable, the conductive roof sheeting should be protected by an airtermination system of sufficient height.</li><li>Non-conductive as well as conductive supports are allowed. When conductive supports are used, the connection to the roof-sheet should withstand partial lightning current.</li><li>Flush-mounted and protruding structures on the roof surface should be protected by means of air-termination rods. Alternatively, extraneous metalwork should be bonded to the LPS.</li></ul><figure><img alt="" src="https://cdn-images-1.medium.com/max/975/1*hH7uOtMtoDom56Ejg5vrXw.png" /></figure><blockquote><strong>Natural Components:</strong></blockquote><p>1. The metal of the electricallycontinuous reinforced concrete framework of the structure;</p><p>• With prefabricated reinforced concrete, it is important to establish interconnection points between the reinforcing elements.</p><p>• It is also important that reinforced concrete contains a conductive connection between the interconnection points. The individual parts should be connected on-site during assembly.</p><ul><li>In the case of pre-stressed concrete, attention should be paid to the risk of causing unacceptable mechanical consequences, due either to lightning current or as a result of the connection to the lightning protection system.</li></ul><p>2. The interconnected steel framework of the structure;</p><p>Ring conductors are not necessary if the metal framework of steel structures or the interconnected reinforcing steel of the structure is used as down-conductors.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/704/1*0eW9lUB-qQ3v2iPmg4MPdQ.png" /></figure><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=a80fa8d1fe2b" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[“Earth Enhancing Compound”]]></title>
            <link>https://medium.com/@cikittechnologies/earth-enhancing-compound-792752dd806c?source=rss-a728dc5307e0------2</link>
            <guid isPermaLink="false">https://medium.com/p/792752dd806c</guid>
            <category><![CDATA[electrical]]></category>
            <category><![CDATA[earthing]]></category>
            <category><![CDATA[lightning]]></category>
            <category><![CDATA[protection]]></category>
            <category><![CDATA[engineer]]></category>
            <dc:creator><![CDATA[CIKIT Electricals and Technologies]]></dc:creator>
            <pubDate>Mon, 25 Jul 2022 12:04:47 GMT</pubDate>
            <atom:updated>2022-08-05T11:38:21.424Z</atom:updated>
            <content:encoded><![CDATA[<p><a href="https://www.linkedin.com/company/cikit-electricals-technologies/posts/?feedView=all">Earth enhancing compounds</a> (EEC) or Back filling compounds (BFC) are highly conductive compounds which are filled around the earth electrode by replacing the existing high resistance soil to provide low earth resistance value and improve the performance of earthing system. Why do we need EEC/BFC? In areas with soils of high resistivity, multiple earth rods, even in large number, may sometime fail to produce an adequately low resistance to earth. The alternative is to reduce the resistivity of the soil immediately surrounding the earth electrode.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/169/1*3Y8i0y2Qv8DLAsjY-Le3NQ.png" /></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/169/1*fY3-r1NPjQ8D_oyIqCEtWA.png" /></figure><p>The greater part of the fall in potential occurs in the soil within a few feet of the electrode surface, since it is here that the current density is highest. To obtain a low overall resistance the current density should be as low as possible in the medium adjacent to the electrode, which should be so designed as to cause the current density to decrease rapidly with distance from the electrode. Hence, using highly conductive earth enhancing compounds around the earth electrode is an effective way of achieving low earth resistance value. IS 3043 has given the characteristics of earth enhancing compound</p><p>Characteristics of <a href="https://www.cikit.in/">EEC/BFC:</a> Since the materials are used directly on soil, the impact of these materials on environment is very high and it may pollute the land and ground water. Hence, special care should be taken on selecting the materials for BFC. The materials should have the following characteristics.</p><ul><li>The earth enhancing compound’s resistivity shall be 0.12 Ωm</li><li>It should be chemically inert to subsoil</li><li>It should not pollute the environment</li><li>It should provide a stable environment in terms of physical and chemical properties and exhibit low resistivity</li><li>It should not be corrosive to the earth electrodes being used</li><li>It should be hygroscopic in nature</li><li>It should be able to maintain moisture to enhance conductivity</li></ul><p>• It should not leach into normal soil</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=792752dd806c" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[ESE Lightning air terminal]]></title>
            <link>https://medium.com/@cikittechnologies/ese-lightning-air-terminal-77edf77414ab?source=rss-a728dc5307e0------2</link>
            <guid isPermaLink="false">https://medium.com/p/77edf77414ab</guid>
            <category><![CDATA[enginee]]></category>
            <category><![CDATA[protection]]></category>
            <category><![CDATA[earthing]]></category>
            <category><![CDATA[electrical]]></category>
            <category><![CDATA[lightning]]></category>
            <dc:creator><![CDATA[CIKIT Electricals and Technologies]]></dc:creator>
            <pubDate>Sat, 02 Jul 2022 10:54:08 GMT</pubDate>
            <atom:updated>2022-07-02T10:54:08.898Z</atom:updated>
            <content:encoded><![CDATA[<p><a href="https://www.linkedin.com/posts/cikit-electricals-technologies_ese-lightning-air-terminal-activity-6937364721675177984-lup_?utm_source=linkedin_share&amp;utm_medium=member_desktop_web">ESE Air Terminal Rod</a> is an active type lightning arrester which stimulates continuous upward leader before any other object does within its radius of protection. Due to its earlier triggering of upward leader, the area of protection is much larger when compared to a simple conventional air terminal rods. The area protected by an ESE terminal depends upon the time difference between the streamer raised from an ESE terminal and the streamer raised from other passive components located at same height. If this time difference is higher, the area protected by the air terminal will also be higher. That time difference is generally termed as triggering advance time and it is always expressed in micro seconds (10−6 s or µs).</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/88/1*7DlaVbHhGA627V_t5LbegQ.png" /><figcaption>ESE Air Terminal</figcaption></figure><p>Triggering Advance Time (t):</p><p>The triggering advance time is defined as the difference in triggering time of an early streamer lightning rod and a simple conventional air terminal rod obtained when both rods are exposed to the same atmospheric &amp; electrical conditions. ∆t = TSR — TESE. where, TSR = The mean triggering time of the upward leader of a simple conventional air terminal rod. TESE = The mean triggering time of the upward leader of a ESE air terminal rod.</p><p>As per NFC 17–102/2011, the value of ‘∆t’ should be between 10µs and 60µs. An air terminal is considered as ESEAT only if the triggering advance time is greater than 10 µs., also the value of ‘t’ being greater than 60µs, it is to be still considered as maximum 60µs for all design calculations.</p><p>Radius of Protection — NFC 17- 102/2011:</p><p>The radius of protection is the distance between the point where you want to place the (ESE) air terminal rod and the farthest point from the structure or building to be protected. For calculating the radius of protection, it is very important to get the triggering advance time of the device and the height of the mast on which the ESE air terminal rod is mounted upon. The ESE Air terminal should be installed at least 2 meters over the surface of the structure to be protected.</p><p>Calculation for Radius of Protection:</p><p>For Early Streamer Emission air terminal, the radius of protection for different levels can be calculated using the following equation:</p><p>𝑅𝑝 ℎ = ( 2𝑟ℎ − ℎ 2 + ∆(2𝑟+∆) For h ≥ 5m Rp (h)</p><p>= h x Rp (5)/5 for 2m ≤ h ≤ 5m h — Height (m) of the mast above the considered surface ∆ — ∆ = ∆t x 10−6 s</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/737/1*3hnt4oC8KoiclyLz6hBSzQ.png" /></figure><p>r — Depends on the selected level of protection ( in meter)</p><p>r = 20 for Level 1 protection</p><p>r = 30 for Level 2 protection</p><p>r = 45 for Level 3 protection</p><p>r = 60 for Level 4 protection</p><p>For buildings taller than 60 meters, minimum of 4 down conductors should be used</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=77edf77414ab" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Selection of Materials for Lightning Protection System]]></title>
            <link>https://medium.com/@cikittechnologies/selection-of-materials-for-lightning-protection-system-3304f7cb1e71?source=rss-a728dc5307e0------2</link>
            <guid isPermaLink="false">https://medium.com/p/3304f7cb1e71</guid>
            <category><![CDATA[lightning]]></category>
            <category><![CDATA[engineering]]></category>
            <category><![CDATA[electrical]]></category>
            <category><![CDATA[protection]]></category>
            <category><![CDATA[earthing-electrodes]]></category>
            <dc:creator><![CDATA[CIKIT Electricals and Technologies]]></dc:creator>
            <pubDate>Thu, 09 Jun 2022 04:25:33 GMT</pubDate>
            <atom:updated>2022-06-09T04:25:33.205Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*YUSRPOb0tF9L3So_.png" /></figure><p>The components of Lightning Protection System (LPS) are exposed to direct lightning strikes and corrosive atmosphere. To achieve efficiency, the materials should have high current withstanding capacity and the materials should be less corrosive. The current carrying capacity of a material depends on the cross sectional area and <a href="https://www.cikit.in/selection-of-materials-for-lightning-protection-system-2/">the materials should be selected based on the local environment.</a></p><p>A material which is most preferable for some site conditions might be the least preferred material for other site conditions due to its chemical properties.</p><p>Apart from the corrosion of materials due to the local environment, the contact of two dissimilar materials also lead to galvanic corrosion.</p><p>Hence, IEC 62305 suggests the materials that can be used for different corrosive environments and it also given minimum cross sectional area for different materials of LPS Components.</p><h3>Minimum Cross sectional area of different materials:</h3><ul><li>Copper, tin plated copper strip, cable, Copper coated steel Should have minimum 50mm² cross-sectional area.<br>When mechanical strength not considered the cross sectional area of copper material can reduce up to 25mm²</li><li>Minimum 176mm² cross sectional area should be considered for all materials of air terminals and 70mm² cross sectional area considered for sites where mechanical stress such as wind loading is not critical</li><li>Normal cross sectional area of stainless strip, and conductor is 50 mm² and it can be increased upto 75 mm² when thermal &amp; mechanical factors are considered.</li></ul><h3>Protection against corrosion:</h3><ul><li>The <a href="https://www.cikit.in/white-papers/">LPS</a> should be constructed of corrosion-resistant materials such as copper, aluminium , stainless steel and galvanized steel.</li><li>The material of the air termination rods and should be electrochemically compatible with the material of the connection elements and the mounting elements.</li><li>Connections between different materials should be avoided.; otherwise they should be protected against galvanic corrosion.</li><li>Copper parts should never be installed above galvanized or aluminium parts unless those parts are provided with protection against corrosion.</li><li>Aluminium conductors should not be directly attached to calcareous building surfaces such as concrete, limestone and plaster, and should never be used in soil.</li><li>Lead-sheathed steel conductors are not suitable for use as earth conductors</li><li>Lead-sheathed copper conductors should not be used in concrete nor in soil with a high calcium content.</li></ul><p>Aluminium has very good electrical conductivity but it more prone to corrosion on soil and concrete medium. Hence, they can be used for air terminal and down conductor systems above the ground level and connected to earthing system of GI/Copper/SS using proper bimetallic connectors. The fasteners or sleeves for aluminium conductors should be of similar metal and of adequate cross-section to avoid failure by adverse weather conditions.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=3304f7cb1e71" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Current Carrying Capacity Of Different Materials]]></title>
            <link>https://medium.com/@cikittechnologies/current-carrying-capacity-of-different-materials-8cf042483db9?source=rss-a728dc5307e0------2</link>
            <guid isPermaLink="false">https://medium.com/p/8cf042483db9</guid>
            <category><![CDATA[earthing]]></category>
            <category><![CDATA[lightning]]></category>
            <category><![CDATA[engineering]]></category>
            <category><![CDATA[protection]]></category>
            <category><![CDATA[electrical]]></category>
            <dc:creator><![CDATA[CIKIT Electricals and Technologies]]></dc:creator>
            <pubDate>Wed, 25 May 2022 07:14:50 GMT</pubDate>
            <atom:updated>2022-05-25T07:14:50.194Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*-BZaYQPf3fh6Dbzx.jpeg" /></figure><p>The <a href="https://www.cikit.in/">Earth electrodes</a> should be designed to withstand the fault current without any physical damages. The fault current carrying capacity of a material mainly depends on cross sectional area of that particular material. In this article, we shall discuss about the current carrying capacity of pipes and strips of different dimensions and different materials as specified by IS 3043:2018.</p><p>In general, the amount of electric current flowing per unit cross sectional area of a material is called current density of a material. The current density of the earth electrode can also be calculated by the formula specified in IS 3043,</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/152/0*zOMgkzdQp82TvqMu.jpg" /></figure><p>Where,</p><p>S = Cross sectional area, in mm²</p><p>I = value of fault current, in Amps</p><p>t = operating time of disconnecting device, in sec</p><p>k = factor dependent on the material of the protective conductor, the insulation and other</p><p>parts, and the initial and final temperatures.</p><p>For the specific cross sectional area, the current density can be calculated from the above</p><p>formula. These values are applicable only for disconnection times not exceeding 5 sec.</p><p>Cross sectional area of pipe,</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/127/0*IehmP_Rq-T3enV-_.png" /></figure><p>R -&gt; Outer diameter of the pipe = D/2<br>r -&gt; Inner diameter of the pipe = (D — 2T)/ 2<br>(Where T is the thickness of pipe)</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/321/0*L2A-4CDHgaj4o6SN.jpg" /></figure><h3>Current carrying capacity of Class A, B and C Steel for t = 1s:</h3><p>Initial temperature: 40 ͦC, Final temperature: 500 ͦ C</p><p>R.M.S current density k for steel at given temperature= 80 A/ mm²</p><p>Note: These values are specified in IS 3043.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/659/0*sgWR0K1l5FRi-_o6.png" /></figure><h3>Current carrying capacity of Copper pipe for t = 1s:</h3><p>Initial temperature: 40 ͦC, Final temperature: 395 ͦC<br>R.M.S current density k for copper at given temperature= 205 A/ mm²</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/657/0*WljS4mCwsDqNUdcL.png" /></figure><h3>Fault current carrying capacity of Copper &amp; Steel strip for t = 1s:</h3><figure><img alt="" src="https://cdn-images-1.medium.com/max/685/0*41x1gR27zKtJ6grX.png" /></figure><h3>Conclusion:</h3><p>From the above calculations based on IS3043:2018, we can conclude that the fault current carrying capacity mainly depends on cross-sectional area and the material of the electrode.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/528/0*vnk6TC8e9qidR_NU.png" /></figure><p>From the above <a href="https://www.cikit.in/white-papers/">calculations</a>, we can find that</p><p>1) <a href="https://www.cikit.in/current-carrying-capacity-of-different-materials/">Current carrying capacity</a> of 48mm dia. pipe is not same for all the classes and it depends on the class of the pipe.</p><p>2) Current carrying capacity of strips of different materials (Copper and Steel) having same cross sectional area (300Sq.mm) won’t be same.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=8cf042483db9" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Lightning Protection for High Rise Buildings]]></title>
            <link>https://medium.com/@cikittechnologies/lightning-protection-for-high-rise-buildings-77714ac5a726?source=rss-a728dc5307e0------2</link>
            <guid isPermaLink="false">https://medium.com/p/77714ac5a726</guid>
            <category><![CDATA[engineering]]></category>
            <category><![CDATA[electrical]]></category>
            <category><![CDATA[protection]]></category>
            <category><![CDATA[lightning]]></category>
            <category><![CDATA[earthing]]></category>
            <dc:creator><![CDATA[CIKIT Electricals and Technologies]]></dc:creator>
            <pubDate>Wed, 11 May 2022 05:42:09 GMT</pubDate>
            <atom:updated>2022-05-11T05:42:09.038Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*Rx_UFnlkU9SWI_yU.jpg" /></figure><h3>Introduction:</h3><p><a href="https://www.cikit.in/lightning-protection-for-high-rise-buildings/">Taller buildings</a> in general attract lightning strikes, hence an efficiently designed LPS is highly critical to safeguarding these structures from the destruction caused due to lightning. Also, such structures should make sure quality earthing systems and surge protection devices are installed to protect the lives and expensive electronic equipment housed in these structures. National Building Code guidelines to be followed while designing LPS for such tall buildings.</p><h3>Design of Lightning Protection System for high rise building:</h3><p>1. A<a href="https://www.cikit.in/white-papers/"> lightning protection system</a> for structures could be done by any of the following methods.</p><ul><li>Protection angle method</li><li>Mesh method</li><li>Rolling sphere method</li></ul><p>2. The protection angle method is suitable for simple-shaped buildings. It also has limitations on the height of the air terminal.</p><p>3. When a building height is more than 60m at level 4, Then the protection angle method is not applicable.</p><p>4. The rolling sphere method can be used in all types of buildings but by using this method we can place air terminals on the upper part of the structure. If the height of the building is greater than the radius of a sphere the possibility of a side flash may hit the structure.</p><p>5. Since it is a taller structure, major lightning flashes will hit on the top, horizontal leading edges, and corners but IEC 62305 -3 suggests providing lateral protection, reduces side flashes (i.e) if the building height exceeds 60m the 20% of the top should be protected by the lateral protection system.</p><p>6. The mesh method is suitable for the protection of plane surfaces and the lateral surfaces to protect against side flashes</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/883/0*92KznYKNhPoCxGeZ.png" /></figure><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=77714ac5a726" width="1" height="1" alt="">]]></content:encoded>
        </item>
    </channel>
</rss>