<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0" xmlns:cc="http://cyber.law.harvard.edu/rss/creativeCommonsRssModule.html">
    <channel>
        <title><![CDATA[Stories by Corey Conner on Medium]]></title>
        <description><![CDATA[Stories by Corey Conner on Medium]]></description>
        <link>https://medium.com/@coreyconner?source=rss-d984ba119fa3------2</link>
        <image>
            <url>https://cdn-images-1.medium.com/fit/c/150/150/0*TsFkUWm535N9rAfb.jpeg</url>
            <title>Stories by Corey Conner on Medium</title>
            <link>https://medium.com/@coreyconner?source=rss-d984ba119fa3------2</link>
        </image>
        <generator>Medium</generator>
        <lastBuildDate>Tue, 17 Nov 2026 20:17:46 GMT</lastBuildDate>
        <atom:link href="https://medium.com/@coreyconner/feed" rel="self" type="application/rss+xml"/>
        <webMaster><![CDATA[yourfriends@medium.com]]></webMaster>
        <atom:link href="http://medium.superfeedr.com/" rel="hub"/>
        <item>
            <title><![CDATA[UNC Charlotte’s Belk Tower demolished]]></title>
            <link>https://medium.com/@coreyconner/unc-charlotte-landmark-demolished-c1c0b46ef537?source=rss-d984ba119fa3------2</link>
            <guid isPermaLink="false">https://medium.com/p/c1c0b46ef537</guid>
            <category><![CDATA[north-carolina]]></category>
            <category><![CDATA[architecture]]></category>
            <dc:creator><![CDATA[Corey Conner]]></dc:creator>
            <pubDate>Wed, 06 Jan 2016 23:29:50 GMT</pubDate>
            <atom:updated>2026-03-19T04:47:19.384Z</atom:updated>
            <cc:license>https://creativecommons.org/licenses/by-nc/4.0/</cc:license>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*AhJ_AELscDdhJR_sADkZ_Q.jpeg" /></figure><h3>The Day the Tower Died — Part I</h3><p><em>As the sun rose over the top of the Storrs Building at UNC Charlotte on the first Monday of the new year, it was greeted by a slightly shorter Belk Tower as construction workers had removed the monument’s peak earlier that morning.</em></p><p><em>In October, Chancellor Phil Dubois emailed faculty, staff, students and alumni, telling the university community that the 46 year old tower that served as a centerpiece to the campus posed a safety threat and would be demolished.</em></p><p><em>But as the safety fences went up around the tower, what wasn’t known to the university community was that facilities management had planned for the tower’s demolition and designed a potential replacement tower four months before the October announcement and two months before the structural analysis of the Belk Tower was completed.</em></p><h3>The Diagnosis</h3><p>In May the university conducted a Facility Condition Assessment Program study of the Belk Tower to assess its safety.</p><p>According to the FCAP Executive Summary Report, there were a number of issues, many related to the level of moisture within the structure and general deterioration.</p><p>The accumulation of water and humidity led to rusting of electrical equipment and landing platforms in the Tower.</p><p>A 2008 version of the report had indicated rusting electrical equipment and problems with joints in the walls and the tower’s brick base. The report estimated the suggested repairs would cost $112,000.</p><iframe src="https://cdn.embedly.com/widgets/media.html?src=https%3A%2F%2Fwww.youtube.com%2Fembed%2F7wDevR1rj-A%3Ffeature%3Doembed&amp;url=https%3A%2F%2Fwww.youtube.com%2Fwatch%3Fv%3D7wDevR1rj-A&amp;image=https%3A%2F%2Fi.ytimg.com%2Fvi%2F7wDevR1rj-A%2Fhqdefault.jpg&amp;key=d04bfffea46d4aeda930ec88cc64b87c&amp;type=text%2Fhtml&amp;schema=youtube" width="854" height="480" frameborder="0" scrolling="no"><a href="https://medium.com/media/c1f920a1d31909ef3f3f7367380c8158/href">https://medium.com/media/c1f920a1d31909ef3f3f7367380c8158/href</a></iframe><p>Some repairs were made to the Tower since then, but not the major repairs the report indicated were needed. Electrical equipment that was replaced in 2012 had since rusted.</p><p>The 2015 report stressed the need for a structural analysis. Problems needing immediate attention would cost $345,156.</p><p>Following the FCAP report, the university would hire SKA Consulting Engineers to analyze the tower in July. SKA delivered the final structural integrity report on Aug. 21.</p><p>But before SKA even submitted a proposal for completing a structural analysis, Director of Facilities Planning Chris Gilbert contacted fellow facilities staff about a concept for a new tower. Gilbert is the lead on the Belk Tower project.</p><p>In an email dated June 3, Gilbert wrote, “A draft of something I hope we will be able to use to kick off the tower discussion and the landscape improvement project.”</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/772/1*Zy-nGGWIbxIMwqo8BTREFg.jpeg" /><figcaption>Screenshot of presentation from June 3 email Gilbert created in promoting the concept of a new tower.</figcaption></figure><p>On July 22, Gilbert, with three additional facilities management employees, met with Chris Weiant from Linda Construction to discuss the Belk Tower’s demolition.</p><p>“Implosion looks to be the least expensive at this point in time, but I will walk thru the scenarios and break it out,” Weiant emailed Gilbert the day after the meeting.</p><p>Gilbert responded, “A cost for ‘laying it down’ vs. implosion is good because, when I sell this idea, the work may be incorporated with a renovation/ reworking of the entire quad.”</p><p>Laura Construction withdrew from the project in early August due to an insurance issue. D.H. Griffin is managing the demolition.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*x8kHGUxYtc_3QU-5m9evAA.jpeg" /><figcaption>Render provided by Messer Construction to UNC Charlotte on September 9.</figcaption></figure><p>Stephanie Kegley with Messer Construction contacted Gilbert on August 13 about completing a preliminary model of a new tower and submitting demolition plans.</p><p>Gilbert shared the in-house design from June, but indicated that once an architect was hired the design would likely not be the same.</p><p>A week after discussion with Messer, the SKA structural analysis report was completed. The report determined that there were issues that needed to be addressed in the next 12–18 months, but “the observed distress is not an immediate safety concern.”</p><h4>The SKA structural analysis report concluded:</h4><blockquote>“Overall, the 50 year old precast concrete tower structure appears to be in fair condition. However, there are elements of the tower construction that are experiencing significant distress, such as, the steel embeds and shear plates located every 7 feet for the full height of the 150’ tall tower. The majority of these steel plates are experiencing corrosion ranging from light to severe with delamination. The observed distress is not an immediate safety concern, but if not addressed within the next 12 to 18 months could threaten the structural integrity of the tower.”</blockquote><p>Associate Vice Chancellor for Facilities Phil Jones informed Dubois of the Belk Tower’s condition in early September. The information was presented to the Chancellor’s cabinet on Sept. 21.</p><p><em>Update: The university confirmed that Dubois was not aware of issues with the Belk Tower prior to Sept. 2.</em></p><p>After reviewing the SKA report provided by Gilbert following the cabinet presentation, Dubois questioned whether the report really indicated a dire situation.</p><p>Gilbert assured Dubois there was a real safety threat, and Dubois again sought reassurance.</p><p>“OK. So you are confident that I can play Chicken Little — the sky is falling?” Dubois asked.</p><p>“Yes Sir! I will do it for you if you’d like,” Gilbert said. “As an Alum myself, I think this is a great opportunity — an event to replace it and revitalize campus.”</p><h3>A New Tower</h3><p>Between June and August, Gilbert’s idea to replace the tower remained the same — a large clock tower, with practically the same height as its predecessor, modeled after the gate structures at the university’s main entrance</p><p>In May, Gilbert estimated the cost of a new tower to be $1.68 million.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*coI5IjWaJAyBZrF2E66r8w.jpeg" /></figure><p>But an October briefing, looking at the price of the Tate Tower at CPCC, suggested a new tower at UNC Chalotte could costs $1.95 million.</p><p>In email exchanges with alumni, Dubois expressed that he was not a fan of a tower disproportionately tall for the area. Instead Dubois mentioned the possibility of a water feature multiple times.</p><p>A spokesperson for the university said the university does not have a statement on the idea of a replacement tower, but a committee of stakeholders including students, faculty, staff and alumni will provide input on the new Belk Plaza.</p><p>Gilbert declined to comment on the Belk Tower project.</p><p><em>Part II will be published later in the week and continue the process leading to the Belk Tower’s demolition, including reactions to the announcement. Part II will also include a history of both the Tower and plaza. Coverage of the demolition continues below.</em></p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*k-mpAowBCMwyaRJ9-SGg5w.jpeg" /><figcaption><em>By 7:30 on Monday morning, the peak of the Belk Tower had been removed.</em></figcaption></figure><h3>The Demolition</h3><p>As the construction crew began to remove the Belk Tower, passersby would look up and maybe pause for a minute before continuing on their way.</p><p><a href="http://www.fox46charlotte.com/news/local-news/39521130-story">Despite earlier reports of planned protests</a>, the Tower’s removal was met with little fanfare. There were no crowds or audiences, just people headed elsewhere.</p><iframe src="https://cdn.embedly.com/widgets/media.html?src=https%3A%2F%2Fi.imgur.com%2FuawmS01.mp4&amp;src_secure=1&amp;url=http%3A%2F%2Fi.imgur.com%2FuawmS01.gifv&amp;image=http%3A%2F%2Fi.imgur.com%2FuawmS01h.jpg&amp;key=d04bfffea46d4aeda930ec88cc64b87c&amp;type=video%2Fmp4&amp;schema=imgur" width="718" height="404" frameborder="0" scrolling="no"><a href="https://medium.com/media/5c2bdd5fb71fb50e362c39b974091f4e/href">https://medium.com/media/5c2bdd5fb71fb50e362c39b974091f4e/href</a></iframe><p>As the day wore on, more pieces of the tower were removed as two construction workers were lifted by crane to the top of the tower, disconnecting the next piece. Then a second crane would slowly lower the section to the ground.</p><iframe src="https://cdn.embedly.com/widgets/media.html?src=https%3A%2F%2Fplayer.vimeo.com%2Fvideo%2F150716149&amp;url=https%3A%2F%2Fvimeo.com%2F150716149&amp;image=http%3A%2F%2Fi.vimeocdn.com%2Fvideo%2F550269337_1280.jpg&amp;key=d04bfffea46d4aeda930ec88cc64b87c&amp;type=text%2Fhtml&amp;schema=vimeo" width="1280" height="720" frameborder="0" scrolling="no"><a href="https://medium.com/media/1874495562dbb0dc62797841974d5f36/href">https://medium.com/media/1874495562dbb0dc62797841974d5f36/href</a></iframe><p>It was a slow process. Nearly half of the tower remained standing on Tuesday evening.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*yOGC_tDnWyu_iO_WFRIgJw.jpeg" /></figure><p>With many students still away for the winter break, the loud roar and clanging of the demolition machines could be heard across campus as the removed cylinders were broken down into rubble.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*H1h1PAYANkXNWBr1vE_AOA.jpeg" /></figure><p><em>Author’s note: For some time now I have been promising to talk about the inspiration for the tower’s design. However, I was unable to confirm my suspicions and to include them as factual or a journalistic endeavor would be misleading. But, in the coming days, I will finally put the thought to print in some acceptable format.</em></p><p><em>For now, here is the rendering of the Belk Tower that hung in architect Bill Little’s office. Debunking the idea of both a second tower and the pedestal as an inkwell to the Tower’s pen, the photo clearly shows that the pedestal was originally meant to house the old bell that makes an appearance at football games and graduation.</em></p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*Nur-6x8PV6s3pQTWYI7LTA.jpeg" /><figcaption>Photo courtesy of Little Diversified Architectural Consulting</figcaption></figure><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=c1c0b46ef537" width="1" height="1" alt="">]]></content:encoded>
        </item>
    </channel>
</rss>