<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0" xmlns:cc="http://cyber.law.harvard.edu/rss/creativeCommonsRssModule.html">
    <channel>
        <title><![CDATA[Stories by Eduardo Torres on Medium]]></title>
        <description><![CDATA[Stories by Eduardo Torres on Medium]]></description>
        <link>https://medium.com/@etconsulting?source=rss-1fe8e05c0968------2</link>
        <image>
            <url>https://cdn-images-1.medium.com/fit/c/150/150/1*bxtp1Rqz1Z4NuvVNB_iJmg.jpeg</url>
            <title>Stories by Eduardo Torres on Medium</title>
            <link>https://medium.com/@etconsulting?source=rss-1fe8e05c0968------2</link>
        </image>
        <generator>Medium</generator>
        <lastBuildDate>Mon, 23 Nov 2026 05:30:11 GMT</lastBuildDate>
        <atom:link href="https://medium.com/@etconsulting/feed" rel="self" type="application/rss+xml"/>
        <webMaster><![CDATA[yourfriends@medium.com]]></webMaster>
        <atom:link href="http://medium.superfeedr.com/" rel="hub"/>
        <item>
            <title><![CDATA[Fue en la época de los apagones]]></title>
            <link>https://etconsulting.medium.com/fue-en-la-%C3%A9poca-de-los-apagones-2931550a6509?source=rss-1fe8e05c0968------2</link>
            <guid isPermaLink="false">https://medium.com/p/2931550a6509</guid>
            <category><![CDATA[ingeniería]]></category>
            <category><![CDATA[coworkers]]></category>
            <category><![CDATA[colombia]]></category>
            <category><![CDATA[recuerdos]]></category>
            <category><![CDATA[bicicleta]]></category>
            <dc:creator><![CDATA[Eduardo Torres]]></dc:creator>
            <pubDate>Sat, 14 Nov 2020 00:15:27 GMT</pubDate>
            <atom:updated>2020-11-14T00:15:27.584Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*9ZrYNyBi8Kl4jVKH" /><figcaption>Photo by <a href="https://unsplash.com/@flo_karr?utm_source=medium&amp;utm_medium=referral">Flo Karr</a> on <a href="https://unsplash.com/?utm_source=medium&amp;utm_medium=referral">Unsplash</a></figcaption></figure><p>Fue en la época de los apagones. Para ahorrar energía se inventaron lo de la hora adelantada el “horario Venezolano”. Se comenzaba a trabajar cuando aun era de madrugada, al fin y al cabo las siete eran en realidad las seis, lo bueno era que las cinco eran en realidad las cuatro y quedaban todavía casi tres horas de luz solar. En el campamento de Ríoclaro, había un buen ambiente, con cierta frecuencia se organizaban excursiones, los Jueves eran como los Viernes, almuerzo especial con bandeja paisa, y en la noche, picadas y bar abierto, los Martes, piscina en los Colores, de mes en mes, sesión especial en la casa de la finca.</p><p>Para aprovechar el tiempo libre y siguiendo la moda, decidimos comprar bicicletas “de montaña”, las compramos en grupo y las pago la empresa, nos las descontarían por cuotas mensuales. Las trajo el camión de las compras, esa misma noche las armamos y al día siguiente, tan pronto como terminó la jornada laboral, nos fuimos en grupo, de paseo en bicicleta hasta la piscina de<br>Los Colores. Del campamento a la carretera que llamaban la “Autopista Medellín-Bogota”, seis kilómetros de carretera destapada, las bicicletas, pesadas, pero especiales para esa vía, después diez kilómetros mas por la carretera pavimentada hasta la piscina. El plan de piscina se alargó y cuando decidimos regresar ya era de noche. Éramos siete y una sola linterna.</p><p>Cogimos la carretera principal, con precaución, pues no veíamos mayor cosa, las lomas significaban un buen esfuerzo al subir, pero era agradable dejarse impulsar al bajar, poco a poco fuimos perdiendo la cautela, la noche era fresca, y casi no había tráfico, dejamos de conversar y sin darnos cuenta, pedaleábamos como si fuera de día, en fila india, siguiendo la senda del<br>primero.</p><p>De pronto un ruido sordo seguido de un grito de angustia, y otro ruido y otro, como al descargar bultos sin cuidado contra el piso. En segundos, los seis ciclistas sin linterna, por cuenta de un bache de la carretera, estábamos en el suelo, adoloridos, atontados y a ciegas; yo buscando mis gafas, otro su billetera y alguien mas preguntando por su “walkman”.</p><p>Escuchamos el ruido del motor de un camión que subía por el otro carril de la vía, de afán y como pudimos, apartamos las bicicletas, en medio del ruido alcanzamos a escuchar un chasquido, como cuando se pisa una cucaracha. Era el “walkman”.</p><p>Recuperados del susto, comenzando a doler los raspones y riéndonos de nuestra propia torpeza, nos encontramos con que las llantas delanteras de las bicicletas se habían roto con el golpe. El compañero de la linterna y único sobreviviente a la caída múltiple continuó solo el camino con la misión de enviarnos un camión para llevarnos de regreso con nuestras bicicletas rotas.</p><p>Al día siguiente, algún guasón coloco en la cartelera una caricatura del equipo de ciclistas “los aporreados”.</p><p>La fiebre de las bicicletas pasó rápido, la crisis de la energía se superó (o la gente se acomodo a la crisis), al terminar la hora de “verano” (En USA), el horario volvió a ser el de siempre. Tal vez la situación con la guerrilla se complicó y los paras se activaron, lo cierto es que poco a poco la vida en el campamento fue perdiendo su encanto de bohemia, se acabaron los Juerves, los paseos, las reuniones mensuales, las bebetas.</p><p>Sobrevivieron la bandeja paisa de los Jueves y las bicicletas que terminaron oxidándose arrumadas quien sabe donde.</p><p>Casi sin darnos cuenta, terminamos la obra y nos dispersamos.</p><p>Hoy siento nostalgia, me acuerdo bien de los rostros, se me olvidan algunos, casi todos los nombres.</p><blockquote>Fabio Carmona, Fernando, Carlos Córdova, José Luis, El Costeno, El otro ingeniero paisa de apellido Giraldo, El maestro Luis, La Medica, Eliana, el hombre de personal (de Turbo), Federico Sieger, Ismael Arango y su gente de integral, El Dr. Clodomiro, Luz Dora, Fernando Montoya, Aurelio Rendón, El hombre pastuso de la mina, el ing. de mantenimiento, Perea, y los demás jefes de turno, el ing. de producción, el ing. civil de la planta, el hombre todero de la planta, el capataz de la finca, los ings. jóvenes de la planta, el ing. mecánico, el ing. electricista que se caso con Eliana, el ing. electrónico que secuestraron, las chicas del laboratorio, Héctor Fabio Giraldo, el contra, mi hermano Edgar, la medica de Ríoclaro, la despachadora, Gerardo Tibaduiza el contratista de movimiento de tierra, ………</blockquote><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=2931550a6509" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Las Mercedes]]></title>
            <link>https://etconsulting.medium.com/las-mercedes-24f2fe7ff313?source=rss-1fe8e05c0968------2</link>
            <guid isPermaLink="false">https://medium.com/p/24f2fe7ff313</guid>
            <category><![CDATA[las-mercedes]]></category>
            <category><![CDATA[plot]]></category>
            <category><![CDATA[colombia]]></category>
            <category><![CDATA[suspenso]]></category>
            <dc:creator><![CDATA[Eduardo Torres]]></dc:creator>
            <pubDate>Fri, 13 Nov 2020 23:55:23 GMT</pubDate>
            <atom:updated>2020-11-13T23:55:23.321Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*MBVf3rwg-hnae8UQ" /><figcaption>Photo by <a href="https://unsplash.com/@0fernanda7?utm_source=medium&amp;utm_medium=referral">Fernanda Fierro</a> on <a href="https://unsplash.com/?utm_source=medium&amp;utm_medium=referral">Unsplash</a></figcaption></figure><blockquote>A Fernando Padierna y a Aurelio Rendón, treinta años después, gracias siempre.</blockquote><p>Por años he tratado de recordar el apellido de Fernando, esta semana vino a mi mente, clarísimo, Pernía, pero Fabio Carmona, un común compañero de andanzas me aclaró, no es Pernía es Padierna, si, Fernando Padierna, el Administrador de las obras que hicimos en 1990 como parte de la ampliación de la Fábrica de Cementos Rio Claro.</p><p>La fábrica está localizada en la vereda de Jerusalén, en jurisdicción del Municipio de Sonsón, en Antioquia, pero geográficamente y socialmente tiene más cercanía, influencia e interacción con los municipios de San Luis en las estribaciones de la montaña y Puerto Triunfo en la rivera del Rio Magdalena y especialmente con los corregimientos de Doradal y Las Mercedes, en la zona geográfica conocida como el Magdalena Medio Antioqueño.</p><p>En esa zona, el Rio Claro es una maravilla natural, pues el lecho del rio es de mármol, el cauce transcurre en medio de un bosque tropical de exuberante belleza y hay una serie de cavernas y ríos subterráneos que son un atractivo para espeleólogos, biólogos, turistas y aventureros.</p><p>El Rio Claro marcaba la frontera entre la zona controlada por los paramilitares, del rio hacia el oriente hasta el Rio Magdalena, esto es Puerto Triunfo y la zona controlada por la guerrilla del ELN, del Rio Claro hacia el Occidente, la zona montañosa, se podría decir que San Luis.</p><p>Pablo Escobar había sido por mucho tiempo el claro dominador de la zona, de hecho, una de sus posesiones más preciadas era la Hacienda Nápoles en Doradal, pero para esa época estaba en guerra contra el estado y en esa vorágine ya estaba enfrentado con sus antiguos aliados, las Autodefensas Campesinas del Magdalena Medio que, comandadas por Ramón Isaza, se habían hecho fuertes en la región y tenían su centro de operaciones en el corregimiento de Las Mercedes.</p><p>Cementos Rio Claro, una empresa del Grupo Argos, tenía más de 20 años de establecida en la zona, era de hecho la empresa más influyente en la región, no solo por los aportes de impuestos y por la generación de empleos directos e indirectos y la demanda de servicios y suministros locales sino por el apoyo directo a las comunidades a través de su departamento de relaciones con la comunidad que después se convirtió en la Fundación Social de Cementos Rio Claro, programa que era manejado por Luz Dora Ramírez, una mujer extraordinaria, que murió unos pocos años más tarde, asesinada en San Luis por guerrilleros de las FARC, víctima de la irracionalidad del conflicto armado que todavía asuela al país.</p><p>Yo trabajaba con Conconcreto SA, como Director de la construcción de las obras civiles de la segunda línea de producción, teníamos nuestras oficinas y campamentos de obra en el área de la fábrica, área debidamente protegida, por razones de seguridad industrial y de seguridad física, aislada con un muro perimetral y que solo era accesible a través de las porterías, donde se surtía un exigente proceso de identificación y verificación para el ingreso.</p><p>Sin embargo, un día estando en mi oficina, se presentó un hombre vestido de paisano, sin uniforme de trabajo y me espetó: “Ingeniero Torres, esta noche lo espera Don Ramón Isaza en las Mercedes”.</p><p>A mí se me encalambraron las piernas, pero haciendo gala de una calma que no tenía, le dije al emisario, “Por favor dígale a Don Ramón, que esta noche no puedo atender su invitación, porque estoy saliendo de viaje a atender otro compromiso”.</p><p>El tipo me miro con algo de sorpresa, me dijo, “Usted verá” y sin más salió de mi oficina.</p><p>El hombre se fue caminando como si estuviera en su casa y yo me quede sentado en mi escritorio, atornillado a mi silla, sabiendo bien lo que significaba el cruce de mensajes.</p><p>Después de unos minutos pensando que hacer, tomé el maletín con mis documentos, pasé por la oficina de Fernando y le dije, sin ninguna explicación, que salía de inmediato de viaje para Bogotá. No hizo ninguna pregunta; salvo que era Jueves, mi viaje no era inusual, mi familia vivía en Bogotá y yo habitualmente viajaba en mi campero los Viernes en la tarde a visitarlos y regresaba a la obra los Domingos en la noche.</p><p>Aquel Viernes madrugué a las oficinas de Conconcreto en Santa Bárbara, le expliqué al gerente de la empresa en Bogotá la situación y recibí una respuesta de este tenor; Usted no está obligado a asistir a esa reunión, si lo hace es por cuenta y riesgo suyo. No hubo como hacerle entender al gerente que aquella invitación no era excusable, al final terminó diciéndome, palabras más palabras menos, que yo era libre de tomar la decisión de regresar a la obra o renunciar al trabajo.</p><p>En realidad, con mujer y tres hijos, ¿quién puede renunciar?</p><p>Aquel fin de semana no hubo comentarios sobre el trabajo en casa, no valía la pena alterar la cotidianidad con una preocupación adicional, me tomé una libertad si, en lugar de viajar el Domingo en la noche lo hice el Lunes de día. Era además más seguro; al llegar a la fábrica, fui directamente a las oficinas de la Gerencia de la Planta.</p><p>El ingeniero Aurelio Rendón, escuchó con mucha atención mi relato, y me ofreció ayuda, era algo muy simple pero muy importante, cuando se concretase la visita a Las Mercedes, iría en un carro de los que estaban al servicio de la fábrica, uno que fuera de la región, uno que fuera operado por un trabajador de ese corregimiento. Me dio además mucha confianza explicándome que la compañía tenía como política la de no acceder a ninguna pretensión que implicara dar dinero, pero era abierta a estudiar la colaboración con las obras que beneficiaran a la comunidad.</p><p>No paso mucho tiempo de haber regresado a mi oficina cuando llegó, tan de improviso como el anterior un nuevo mensajero.</p><p>La instrucción era perentoria, ese día, tarde en la noche, debería ir a Las Mercedes para entrevistarme con Don Ramón Isaza. Le dije al mensajero que atendería la reunión. Y este se retiró de mi oficina, como el anterior emisario, caminando como si fuese alguien de la casa.</p><p>En aquella época no había teléfonos celulares, de modo que las comunicaciones no eran tan inmediatas como son ahora, pero la planta disponía de servicio telefónico de larga distancia nacional, entonces, llamé a mi cuñado Fernando Samudio, a Cúcuta donde el vivía y de manera breve (por razones del tema y porque las llamadas, particularmente las de larga distancia eran breves) le conté de mi cita nocturna y le pedí que en caso de que algún evento sucediera se hiciera cargo del cuidado de mis hijos.</p><p>A continuación, me reuní con Fernando, Fernando Padierna el Administrador de la Obra y le comenté el asunto con todos los detalles.</p><p>Mi plan era ir solo, pero al terminar mi relato, Fernando me dijo, “Ingeniero, Usted no va solo, yo voy con Usted”.</p><p>No creo haberle insistido mucho en que no fuera, era una oferta muy valiente, generosa y conveniente.</p><p>En los campamentos de obra, los horarios son tempraneros, se desayuna temprano en la mañana, se almuerza al filo del mediodía y se cena entre seis y siete, y a más tardar, a las diez de la noche ya prácticamente todo el mundo está durmiendo pues al siguiente día hay que madrugar.</p><p>Parece que en el mundo de la guerra el horario es a la inversa, la cita era a la hora que nosotros habitualmente nos acostábamos, de manera que hacia las nueve nos embarcamos en la camioneta que nos llevaría de la fábrica hasta las Mercedes, el trayecto no era largo, tal vez unos veinte kilómetros, pero no queríamos llegar tarde, y tampoco sabíamos, pero nos imaginábamos que habría retenes; nos sorprendió que la primera parada fuera a la salida de Jerusalén, era el comandante de las autodefensas de esa zona, todo el mundo lo conocía, era lo que se dice un “secreto a voces”; amable la parada y el primer trago de aguardiente, “Ingeniero, que gusto verlo, ¿se toma uno?”.</p><p>Íbamos en una camioneta Toyota, de esas que son la cabina con una sola banca y el platón; el conductor en su puesto, Fernando en el centro y yo en la ventanilla derecha. No conversábamos, estábamos ensimismados en nuestros pensamientos, no había música, solo el ruido del motor y del carro transitando por la carretera. La vía está trazada sobre una topografía de colinas, no hay casi tramos rectos, pero las curvas son suaves, es la transición de la planicie del valle del Rio Magdalena a las montañas de la cordillera central. En esas carreteras donde la vegetación circundante es muy frondosa, independientemente de si la noche es con luna llena o el cielo esta nublado, la obscuridad es casi total; solo las luces dela camioneta alumbrando el camino y la cabina en penumbra, los tres pendientes del camino.</p><p>La segunda parada fue poco después de desviarnos de la carretera que llaman “Autopista Medellín-Bogotá” ya en ramal que conduce a Las Mercedes. Allí el diálogo no fue tan amable, la primera pregunta fue al conductor de la camioneta, las siguientes al pasajero dela ventanilla derecha, ya no era, como en Jerusalén, un solo hombre sin armas visibles, sonriente y amable, esta vez eran varios, serios, nerviosos, armados hasta los dientes, eran más de los que veíamos, estábamos rodeados y se notaba que había otros hombres vigilando el entorno, el que nos hablaba estaba comunicado con su radio portátil con alguien más, a quien le reportaba.</p><p>Después de varias preguntas, un cometario, directamente al conductor, “Sigan”; sin ningún atisbo de simpatía, solo ese escueto “Sigan”.</p><p>Y seguimos, no solo continuamos la marcha, sino que nos mantuvimos en silencio.</p><p>El ramal a Las Mercedes era realmente angosto, me parecía que la topografía un poco más quebrada y el estado de la vía destapada, lamentable. Avanzábamos muy despacio, zangoloteándonos a medida que el conductor esquivaba los baches y las cárcavas de la carretera. Y con ese estado de la carretera aún más pendientes del camino.</p><p>Nos esperaba otro retén, me pareció que no era numeroso, pero estaban mejor armados y menos nerviosas, esta vez, las preguntas me las hicieron directamente, era claro que estaban verificando las repuestas dadas en el anterior reten, la pregunta final me sorprendió, ¿Vieron algo en el camino?; la<br>respuesta obvia, No señor, no vimos nada.</p><p>Y esta vez, “Sigan, los están esperando” y como en un retén militar, una señal de despedida con la mano al ala del sombrero.</p><p>Unos pocos minutos después llegamos a Las Mercedes, como la mayoría de los poblados pequeños de Antioquia y de la región andina en Colombia, está dispuesto alrededor de una plaza en la que hay una iglesia y a la que desemboca invariablemente la carretera. El alumbrado púbico iluminaba precariamente las calles, a esa hora todo estaba ya cerrado, excepto la cantina de la plaza, que como la de casi todos esos pueblos de tierra caliente, tiene también mesas con sillas en la parte de afuera. En esa plaza, cerca de la cantina terminó nuestro viaje, el conductor se detuvo y apagó el motor.</p><p>Fernando y yo desembarcamos y alguien se nos acercó; “buenas noches, sigan y esperan en la cantina, Don Ramón está ocupado y los atenderá más tarde”, y sin más, se marchó.</p><p>Entramos a la cantina, Fernando y yo saludamos al unísono a los presentes con un “buenas noches señores” y nos aproximamos a la barra.</p><p>El cantinero, amable, nos dijo, “siéntense señores, ¿qué les sirvo de tomar?”</p><p>Nos acomodamos en una mesa, nos dimos cuenta de que todos los presentes estaban armados, no solo con sus armas cortas, todos estaban preparados con sus armas largas de dotación y aunque aparentaban no mirarnos, era claro que éramos el centro de sus miradas.</p><p>Le pregunté a Fernando que quería tomar y como coincidimos en el gusto, pedimos media botella de aguardiente.</p><p>La mesa en la que nos sentamos estaba cerca de la mesa de billar, así que después del segundo aguardiente y como la mesa de billar estaba desocupada, decidimos jugar un poco, para calmar la tensión, para tener un tema intrascendente de conversación y mantenernos sobrios.</p><p>Ni Fernando ni yo éramos buenos jugadores, pero creo que aquella noche, ante la mirada escrutadora del auditorio jugamos nuestro mejor juego, tal vez no hicimos muchas carambolas, pero eran decentes las tacadas, a pesar de la situación, el pulso era seguro, sin que nos temblara la mano.</p><p>No sé cuánto tiempo pasó, pero poco a poco el lugar se fue desocupando, de pronto apareció la persona que nos recibió y nos dijo, “Hoy tenemos una emergencia y Don Ramón no los puede atender, váyanse”.</p><p>Pagamos la cuenta, nos embarcamos en la camioneta donde el conductor nos había esperado durmiendo y emprendimos el regreso, hicimos el viaje en silencio y sin paradas, esta vez ya no hubo retenes.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=24f2fe7ff313" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Doña Vicenta]]></title>
            <link>https://etconsulting.medium.com/do%C3%B1a-vicenta-39a7fd2d91a7?source=rss-1fe8e05c0968------2</link>
            <guid isPermaLink="false">https://medium.com/p/39a7fd2d91a7</guid>
            <category><![CDATA[personas-que-inspiran]]></category>
            <category><![CDATA[barranquilla]]></category>
            <category><![CDATA[relatos-breves]]></category>
            <category><![CDATA[mujeres]]></category>
            <category><![CDATA[relatos-cortos]]></category>
            <dc:creator><![CDATA[Eduardo Torres]]></dc:creator>
            <pubDate>Tue, 03 Nov 2020 21:57:02 GMT</pubDate>
            <atom:updated>2020-11-03T21:57:02.127Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/960/1*Nz17Kh5sNp0HTTwYFAw1Vg.jpeg" /></figure><p>Querida Francisca,</p><p>Leí con mucha atención tu cuento titulado “Um Grande Engaño”; me gustó muchísimo, me pareció muy interesante tu propuesta de escribirlo como las anotaciones del diario de un hombre mayor.</p><p>Ya con solo empezar la lectura, me causa admiración que una niña tan joven como tu tenga la sensibilidad y la capacidad de percibir que, si un hombre mayor y duro como debe ser un policía, escribe en su diario sus “sentimientos más profundos”, a la gente le parecerá extraño y que, para seguir adelante haya que hacerlo sin que “importe lo que digan los demás”.</p><p>Ya en esta primera página hay una lección de vida que le da sentido a leer tu cuento.</p><p>Me gustó también el ritmo de la historia, su sentido del humor y el final, que te lo agradezco, en mi nombre y en el de los demás lectores, a mí también me encantan los finales felices.</p><p>En uno de los pasajes haces una descripción magnífica, de alguien que tenía “los ojos azules transparentes y brillantes como el mar”; debo decirte que me emocioné al leerla, aunque para mí, no pueden ser los ojos de un portero torvo de “mirada siniestra”; son por el contrario los ojos de una anciana dulce y amorosa, Doña Vicenta, la mama del Ingeniero Hernán Duarte Esguerra, mi primer patrón, a quien conocí hace muchos años cuando recién graduado de la universidad tuve mi primer trabajo en Barranquilla.</p><p>Te haré un breve resumen, era el año de 1977, yo había llegado a la ciudad unos seis meses antes, en noviembre de 1976, emocionado, pues después de batallar mucho había conseguido un trabajo, mi primer trabajo. Aquella empresa era muy particular, pues era muy “desordenada”, no había un espacio físico de oficina, tampoco había bodega ni taller, de manera que los equipos y algunos materiales estaban diseminados en diferentes patios donde si bien no cobraban renta o esta era muy baja, con frecuencia saqueaban los equipos y las cosas se perdían.</p><p>Además, la nómina de los trabajadores no se pagaba a tiempo. En cualquier otra empresa aquello habría sido un desastre; esa situación tan incómoda se superaba por supuesto al realizar el pago, pero también por el trato amable, respetuoso y considerado que el Ingeniero Hernán deparaba a sus trabajadores, que en realidad lo veían como el “padre de la familia”.</p><p>A pesar de mi inexperiencia, entendí que aquel desorden no podía continuar y me propuse pagar la nómina de los trabajadores puntualmente y alquilar una casa que nos sirviera de oficina, bodega, taller y vivienda.</p><p>Como teníamos una limitación presupuestal importante, encontramos una casa con un buen terreno en un barrio marginal de la ciudad donde los precios eran más asequibles. La tomamos en alquiler y la adecuamos de manera tal que además de una bodega y taller, tendríamos una pequeña oficina, vivienda para el mecánico con su familia y un apartamento anexo que destinamos para alojar visitantes.</p><p>El ambiente de trabajo era familiar, tanto que, si yo estaba en la oficina a la hora de comer, invariablemente lo haría en la casa del mecánico, pues su mujer servía la mesa para su familia y para mí.</p><p>Aquel ambiente era tan amable que el dueño, cuando venía de visita a Barranquilla ya no se alojaba en hotel sino en el apartamento preparado para visitantes.</p><p>Un día, el dueño de la empresa nos anunció que, de manera temporal, alguien de su familia se movería al apartamento de visitantes.</p><p>Fue cuando conocí a Doña Vicenta, una anciana amable de ojos azules transparentes y brillantes como el mar. Doña Vicenta, la madre del dueño de la empresa, era enfermera, siendo joven había vivido en Santa Marta donde se casó y nacieron sus hijos, cuando estos crecieron ella se fue a vivir a las Antillas, a la isla de Curazao, y después a Holanda. Ya retirada, había decidido regresar buscando un clima más benigno y aunque era una mujer muy independiente, añoraba el trato cálido y cercano de los caribeños y pensaba que en Barranquilla a donde su hijo viajaba con frecuencia gozaría de compañía con independencia.</p><p>Escuchar sus historias en las tardes al terminar la jornada de trabajo era como mirar el mundo, además de sus viajes por el Caribe y por Europa, era una mujer que había roto esquemas y tabúes. Sus ojos cobraban un brillo especial cuando rememoraba esas épocas.</p><p>Un día nos anunció que recibiría la visita de dos de sus nietas que vendrían desde Holanda. Estarían en Barranquilla un par de semanas. Por aquella época había llegado a trabajar en la ciudad Edgar Laverde, un joven paisano y amigo de infancia de mi pueblo, No tuve que hacer mucho esfuerzo para convencerlo de que me acompañara en el plan de hacerles a las nietas la vida tan amable cono fuera posible en su paso por la ciudad.</p><p>Ingrid y Maria, las nietas de las que ya teníamos alguna imagen por cuenta de los relatos de su abuela, eran más bonitas y amigables de lo que nos podíamos haber imaginado. Fueron un par de semanas inolvidables, de fiestas y paseos a las playas cercanas de Santa Marta y Cartagena, tiempo en el que la simpatía inicial se transformó en un bonito romance con la complicidad un tanto alcahuete de la abuela.</p><p>Ingrid y María regresaron a Europa y ni Edgar ni yo cumplimos con la promesa de escribirles e ir a visitarlas.</p><p>En aquella época estaba de moda la canción “Chiquitita” del grupo sueco ABBA; aun hoy, cuando escucho esa canción, mi memoria regresa a Barranquilla, a María, mi María y puedo ver a Doña Vicenta sonriente, con la felicidad reflejada en sus ojos profundamente azules y brillantes, como el mar Caribe en los días esplendidos del verano.</p><p>Querida Francisca, te doy las gracias nuevamente pues la lectura de tu cuento me ha permitido hacer esta amable evocación del pasado,</p><p>Recibe un cariñoso abrazo,<br>Eduardo</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=39a7fd2d91a7" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[La guitarra de Dalmiro Landázuri]]></title>
            <link>https://etconsulting.medium.com/la-guitarra-de-dalmiro-land%C3%A1zuri-31ff0c3a87d?source=rss-1fe8e05c0968------2</link>
            <guid isPermaLink="false">https://medium.com/p/31ff0c3a87d</guid>
            <category><![CDATA[carpinteria]]></category>
            <category><![CDATA[ingeniería]]></category>
            <category><![CDATA[madera]]></category>
            <category><![CDATA[construcción]]></category>
            <category><![CDATA[coworking]]></category>
            <dc:creator><![CDATA[Eduardo Torres]]></dc:creator>
            <pubDate>Tue, 03 Nov 2020 21:08:04 GMT</pubDate>
            <atom:updated>2020-11-03T21:08:04.519Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*ZelEEHfqRQck9_w1" /><figcaption>Photo by <a href="https://unsplash.com/@toddquackenbush?utm_source=medium&amp;utm_medium=referral">Todd Quackenbush</a> on <a href="https://unsplash.com/?utm_source=medium&amp;utm_medium=referral">Unsplash</a></figcaption></figure><p>Dalmiro Landázuri era un carpintero de obra, en mi concepto, el mejor con el que yo trabajé. Maestro de un oficio que está desapareciendo o desapareció por completo.</p><p>Lo conocí en la construcción de la Fábrica de Cementos Paz del Río, él se encargaba de confeccionar las formaletas de madera que se necesitaban en la obra y particularmente en mi caso, las que se requerían para hacer ciertos elementos como los marcos de las aberturas y recesos en los silos que construíamos utilizando formaletas deslizantes de Lambertini, que tenían tableros metálicos.</p><p>SADE, la empresa para la que trabajábamos impulsaba el uso de formaletas metálicas, el sistema ACROW y el sistema OUTINORD, estábamos, tal vez sin saberlo, cimentando y presenciando los inicios del fin de su oficio.</p><p>Dalmiro, era no solo carpintero de formaletas, era también un ebanista fino; fabricaba muebles con los retales de las formaletas y las maderas desechadas de los guacales usados, dependiendo del diseño, podían ser incluso muebles muy finos y bien elaborados, era un maestro en el arte de los ensambles.</p><p>Dalmiro tenía una afición muy especial, fabricaba guitarras. Era un “luthier” y de los buenos, porque no solo las fabricaba, las tocaba.</p><p>Daniel Greniez, el Director de la Obra, un ingeniero francés, muy serio, muy exigente, caminaba frecuentemente por la obra, generalmente solo, observándolo todo muy atentamente y siempre llamando la atención porque la calidad de los acabados no satisfacía sus expectativas, pasaba con frecuencia por la carpintería a revisar las formaletas que fabricaba Landázuri, y se quejaba de los costos, Dalmiro siempre pedía madera fina, “cedro macho” o “amarillo” porque según él, estas maderas no se deformaban o se deformaban muy poco con la humedad y el agua de los concretos; el Ingeniero Greniez también reclamaba por el tiempo que se empleaba haciendo las formaletas y los atrasos en la entrega de las mismas a los frentes de trabajo y enfatizaba en el impacto que esos atrasos tenían en el cronograma de ejecución de la obra y en su reprimenda tal vez haría algún cometario echándole la culpa del atraso al tiempo que debería demandar la fabricación de la guitarra, siempre inacabada, que se encontraba colgada de alguna percha en la carpintería.</p><p>Dalmiro construía sus guitarras de manera similar a como Aureliano sus pescados de oro. Terminaba una e iniciaba de inmediato otra. Claro que, con tanto trabajo en la obra, terminar cada guitarra podía tomar un semestre, de pronto más.</p><p>En la obra había un grupo de personajes muy particular, en la oficina técnica, por la parte mecánica Albero Pabón en tándem con Liévano y en la parte civil Guillermo Ospina con Albero Olaya, en los equipos y servicios generales, Jairo García, en el campo, los supervisores argentinos encabezados por el señor Belga y los supervisores colombianos Monroy y Espitia, los maestros de obra Vicente Holguín y Hernando Cubillos, mi compañero de deslizados Víctor Reina, un equipo extraordinario de trabajo y a la vez de eximios “mamagallistas”, cada uno con su sello personal, unos con la chispa permanente, otros de chispazos ocasionales, demoledores.</p><p>Los sábados de quincena de pago, era común que, en la tarde, después de terminar la jornada de trabajo, en las cercanías de la obra se organizara un piquete, un asado generalmente hecho en una parrilla también confeccionada en la obra con retales de varillas de construcción, asado que transcurría alegremente escanciado con unas buenas “polas”. No había que preocuparse de nevera o hielo, porque en aquel tiempo las cervezas eran buenas al clima y a “pico de botella”.</p><p>Los “jefes” no asistían a estas reuniones, que se habían bautizado como el “centro cultural”.</p><p>Sin embargo, un sábado, el centro cultural contó con la presencia excepcional de Daniel Greniez, quien al cabo de unas cervezas comenzó a destapar su lado amable, lo que permitió que pasáramos de la conversación más o menos formal a los chistes y de los chistes a las canciones, y claro que con las canciones la guitarra de Dalmiro.</p><p>A Dalmiro, como todo carpintero que se respetase, le faltaban algunas falanges, perdidas noblemente en la sierra, batallando con la madera.</p><p>Después de varias canciones, y de repente, en una pausa, el ingeniero Greniez le lanzó la pregunta a Dalmiro, en su español con característico acento gutural francés:</p><p><em>“Landazuri, y Usted, ¿cómo fue que se lastimó los dedos?”</em></p><p>Y en ese silencio profundo que a veces se forma en medio del bullicio, un silencio en el que se puede sentir el aletear de una mariposa y se palpa la expectativa en los rostros de cada uno de los presentes, como en cámara lenta, el “Negro” Landázuri, sonriendo, abrazando su guitarra, con una luz de ebriedad alegrándole el brillo de los ojos, con su más profundo acento chocoano le contestó:</p><p><em>“Rasgando la guitarra, Ingeniero”.</em></p><p>…</p><p>Ese día, Dalmiro se ganó la medalla de oro del centro cultural.</p><blockquote>Esta anécdota la he escrito como un regalo de cumpleaños para la joven escritora Francisca Vilaca, teniendo en mi mente a las entonces pequeñas niñas Charlotte Y Jessica Greniez y por supuesto a Vicky y a Daniel.</blockquote><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=31ff0c3a87d" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Sopresas te da la vida]]></title>
            <link>https://etconsulting.medium.com/sopresas-te-da-la-vida-1cba74d117a4?source=rss-1fe8e05c0968------2</link>
            <guid isPermaLink="false">https://medium.com/p/1cba74d117a4</guid>
            <category><![CDATA[cronicas]]></category>
            <category><![CDATA[ingeniero]]></category>
            <category><![CDATA[plot-twist]]></category>
            <category><![CDATA[inesperado]]></category>
            <category><![CDATA[recuerdos]]></category>
            <dc:creator><![CDATA[Eduardo Torres]]></dc:creator>
            <pubDate>Thu, 29 Oct 2020 22:28:48 GMT</pubDate>
            <atom:updated>2020-10-29T22:28:48.858Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*ZTMGNtYCnkzk0Jev" /><figcaption>Photo by <a href="https://unsplash.com/@dmjdenise?utm_source=medium&amp;utm_medium=referral">Denise Jans</a> on <a href="https://unsplash.com/?utm_source=medium&amp;utm_medium=referral">Unsplash</a></figcaption></figure><h3>I- Berdugo verdugo</h3><p>Calamar es una población del Departamento de Bolívar, en Colombia, en las riberas del Rio Magdalena, donde se inicia el Canal del Dique, que comunica el Rio Magdalena con la bahía de Cartagena.</p><p>En la época de oro de la navegación fluvial, Calamar fue una población floreciente, esa era la imagen que el Profesor Napoleón Henríquez, mi profesor de geografía en el Colegio de bachillerato de Zipaquirá, nos transmitió de su pueblo natal. “Calamar es lo máximo”, decía con una sonrisa que le iluminaba la cara.</p><p>La realidad a finales de los setentas era distinta, las ciudades y poblaciones ribereñas habían experimentado un proceso paulatino de deterioro y despoblamiento desde mediados de los cincuentas. La desforestación de las riberas y la sedimentación del cauce del rio habían reducido a un mínimo la navegación y el rio causaba estragos cuando se crecía en la época de lluvias.</p><p>Hernán Duarte construía unos espolones para proteger la población de los embates del rio que estaban erosionando la orilla y amenazaba con desbarrancar el pueblo y un tablestacado para garantizar la estabilidad de la cimentación del puente sobre el canal del dique en la carretera Calamar –Ponedera; vía entonces en construcción y que acortaría apreciablemente el recorrido entre Sincelejo y Barranquilla.</p><p>Yo trabajaba como Ingeniero Residente de esas obras, que eran relativamente pequeñas y poco complejas, razón por la cual también atendía las obras de construcción del puente sobre el rio Fundación en la población del Reten, Magdalena, cerca de Aracataca.</p><p>Vivía en Barranquilla, convenientemente equidistante de las dos obras, y donde se hacían todas las labores administrativas relacionadas con los contratos, pues estas obras estaban controladas por la Seccional del Ministerio de Obras Públicas ubicada en esa ciudad.</p><p>Viajaba alternativamente un día al Norte, a El Reten y al día siguiente al Sur, a Calamar, el día intermedio para hacer vueltas de soporte en Barranquilla, compras, pagos, tramitar el sobregiro del banco y hacerle seguimiento a las Actas de Obra, pues esa era la labor principal a mi cargo, asegurar el flujo de fondos para atender las obras.</p><p>El Ingeniero Gómez, el Residente Interventor, funcionario del Ministerio de Obras, oriundo de Riohacha, era reacio a viajar a Calamar, al principio iba una o dos veces por semana, pero con el avance de los trabajos, espacio sus visitas, hasta que fueron solo una por mes, para medir el avance de los trabajos y hacer el acta mensual de obra.</p><p>Era difícil convencerlo de que fuera, decía que “era mejor estar preso en Barranquilla que suelto en Calamar”.</p><p>Calamar es una población de clima ardiente, con temperaturas muy altas, prácticamente insoportables trabajando al rayo del sol, por lo que la jornada de trabajo se iniciaba a las cinco de la mañana, se paraba a las diez y se reiniciaba a las tres de la tarde, extendiéndose hasta las seis para completar las ocho horas de trabajo de la jornada.</p><p>Los trabajos se realizaban desde un planchón en cuya cubierta se había instalado un martillo de hinca.</p><p>A bordo del planchón la sensación de calor era aún mayor, además del efecto del reflejo de los rayos del sol en el espejo del rio, las planchas de la cubierta del planchón y las tablestacas metálicas se calentaban y era como estar encima de una estufa, para mitigar el calor, la cubierta y las tablestacas se rociaban permanentemente con agua bombeada del rio; se podía ver como el agua se evaporaba casi como cuando se pone agua en la superficie caliente de una plancha eléctrica.</p><p>El único restaurante del pueblo era en realidad una caseta al lado de la carretera, cerca del puente, donde los ocasionales buses de pasajeros o camiones, paraban para que los pasajeros se aprovisionaran de gaseosas o cervezas frías y al medio día, un almuerzo con una porción de pescado frito y arroz con ñame o yuca y tajadas de plátano maduro.</p><p>Yo habitualmente viajaba muy temprano desde Barranquilla, en la camioneta de la compañía manejada por un conductor. Se empleaban unas dos horas en el recorrido. Al llegar a Calamar, de desayuno, una taza de café negro con una buena porción de queso salado, eventualmente una arepa de huevo, a veces una posta de bocachico frito con patacones.</p><p>El viaje tempranero tenía el atractivo de que estaría de regreso en Barranquilla a tiempo para un buen almuerzo.</p><p>Pero no siempre se podía, de modo que en ocasiones había que permanecer hasta la tarde, entonces entendía la reticencia del ingeniero Gómez, pues además de lo precario del restaurante, prácticamente no había nada que hacer. A mediodía, el calor era tan sofocante que el pueblo parecía desierto pues sus habitantes se refugiaban en sus casas para evitar la canícula.</p><p>La única distracción que ofrecía el pueblo era el juego del billar, en la caseta donde funcionaba el restaurante había también un par de mesas de buchácara y una solitaria mesa de billar convencional.</p><p>En una de esas ocasiones en las que hubo que permanecer en la población todo el día, después de almorzar en el restaurante y no habiendo nada más que hacer, para pasar el tiempo le propuse a Berdugo, el conductor de la camioneta que jugáramos un chico de billar. Yo no era un buen jugador, pero esa era la única distracción.</p><p>Berdugo se negó a jugar, aduciendo que él “no jugaba billar”.</p><p>Como éramos los únicos presentes en el lugar, le insistí y él se mantuvo en su negativa, de modo que no tuve otra alternativa que decirle que mi propuesta no era opcional, que era una orden; además, decidí que el chico fuera a cincuenta carambolas.</p><p>Y le indique que él saldría es decir que el haría la primera tacada.</p><p>Y él, disgustado y muy serio, cumpliendo la orden, salió; anotó aquella carambola y siguió anotando una a una, sin parar hasta completar las cincuenta.</p><p>Cuando terminó, ni siquiera sonrió, yo estaba perplejo (y aun hoy, cuarenta y cuatro años después, me sorprendo del evento). Le espeté, “Berdugo, pero Usted me dijo que no jugaba billar”.</p><p>Y él, todavía serio, me contestó, “Ingeniero y es cierto, yo le dije que no juego billar, no que no sepa jugar; yo no juego billar porque mi esposa me lo prohibió.”</p><h3>II- Eso le pasó por avión</h3><p>Estábamos iniciando las obras civiles de la segunda unidad de la Termoeléctrica de la Guajira ubicada en el municipio de Mingueo, equidistante de Riohacha y Santa Marta. Formábamos el grupo de dirección de la obra, un grupo pequeño, solo seis personas, y casi todos nos conocíamos por haber trabajado en proyectos anteriores, excepto por Pedro, el Administrador de la Obra, que venía de otra empresa.</p><p>Era sábado y después de haber pagado la primera nómina catorcenal, viajamos juntos a Santa Marta para descansar durante el fin de semana. Era también nuestra primera salida colectiva, habíamos compartido el mismo transporte y el viaje había sido “por entre las tiendas”, de manera que la parada en el hotel que habíamos reservado para todo el grupo, fue solo para registrarnos y dejar los equipajes; seguimos hacia un bar por recomendación de alguien del grupo, tal vez el Nato Barragán, encargado de personal y baquiano en la zona.</p><p>Al cabo de unas pocas cervezas adicionales, alguien propuso jugar al billar, y para que todos participáramos se estableció que se jugaría por parejas. Cuando nos aprestábamos para conformar los grupos, Pedro dijo que mientras nos organizábamos él iba al hotel por su taco.</p><p>Como nos conocíamos, formamos las parejas de manera tal que los chicos de billar resultaran relativamente balanceados, Alberto Ayala, muy hábilmente manejó la repartición para hacer pareja con Pedro.</p><p>Dos parejas iniciaron el juego, sin incidentes mayores, ya que nos conocíamos bien, los comentarios eran los de siempre, los que se hacen entre un grupo de asiduos contertulios.</p><p>Pedro regresó del hotel y ensambló su taco, Alberto sonreía ladinamente, pues se sabía ganador, él era un jugador razonablemente bueno, pero con Pedro, que debería ser muy buen jugador, la suerte estaba echada.</p><p>Cuando les llegó el turno de jugar a Alberto y a Pedro, y como todos los demás nos conocíamos y sería bueno catear al nuevo, le pedimos a Pedro que hiciera la primera tacada, la tacada de salida.</p><p>El hombre cuadró las bolas asegurándose de que quedaran en la posición teórica mandada por los cánones, entizó el taco con el mejor estilo, revisó nuevamente los ángulos de la carambola, se cuadró en perfecta posición para tacar y … se pifió en la tacada.</p><p>La carcajada fue espontanea, masiva, exultante como cuando se canta un gol y en medio de la algarabía de nuestras risas alcanzamos a escuchar a Alberto, el único que no se rio, cuando exclamó, “¡No joda, la cagué!”</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=1cba74d117a4" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[From the Andes Mountains to the Mekong Delta]]></title>
            <link>https://etconsulting.medium.com/from-the-andes-mountains-to-the-mekong-delta-b6b297d5bea5?source=rss-1fe8e05c0968------2</link>
            <guid isPermaLink="false">https://medium.com/p/b6b297d5bea5</guid>
            <category><![CDATA[experience]]></category>
            <category><![CDATA[construction]]></category>
            <category><![CDATA[learning]]></category>
            <category><![CDATA[path]]></category>
            <category><![CDATA[engineering]]></category>
            <dc:creator><![CDATA[Eduardo Torres]]></dc:creator>
            <pubDate>Mon, 19 Oct 2020 21:22:12 GMT</pubDate>
            <atom:updated>2020-10-19T21:22:12.960Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*i62ecaw2dk9dJNiY" /><figcaption>Photo by <a href="https://unsplash.com/@chuttersnap?utm_source=medium&amp;utm_medium=referral">CHUTTERSNAP</a> on <a href="https://unsplash.com/?utm_source=medium&amp;utm_medium=referral">Unsplash</a></figcaption></figure><h4>An itinerary of permanent learning</h4><h4>Reflections from my experience</h4><p>In my previous writing, illustrating the topic of building trust, I outlined in a very general way the itinerary that took me from project to project, from the Andes mountain range in Colombia to the Mekong Delta in Vietnam, giving me a life of permanent learning. I share some of those learnings in the story below…</p><h4><strong><em>In the highlands of Boyacá — Colombia…</em></strong></h4><p>At the beginning of the eighties, the first links of the practical learning chain were forged. I was working with Jaime Becerra, for SADE S.A. We were in charge of the works with sliding forms that SADE S.A. did as a contractor for the DISTRAL SA-MITSUBISHI HEAVY INDUSTRIES consortium.</p><p>DISTRAL SA was a very large Colombian company. Their main activity was the manufacture and assembly of boilers. They were involved in most of the projects that were carried out in Colombia with this type of equipment. MITSUBISHI, supplied the turbines and generators.</p><p>In a five-year period, we built the chimneys and silos of all the thermoelectric plants that were built in Colombia during that period.</p><p>A decade later, Jaime and I partnered and formed a small engineering and construction company that we called COBETO (Constructora Becerra Torres Cía. Ltda.). At that time, our old colleague and friend Jairo García had already established FOSTER INGENIERIA, a company dedicated to the design and supply of industrialized modular forms.</p><p>The Engineer Camilo García, Manager of CONSTRUCCIONES Y MONTAJES DISTRAL (CMD), accepted the joint proposal we made with Jairo to build the silos and the pre-heater tower for the works of the reconversion of the cement factory in HOLCIM at Nobsa, where CMD was one of two general contractors.</p><p>Some years later, Jairo recommended us to the contractors of the second line of Cemex’s cement factory in Caracolito, near Ibagué, where we built the silos in consortium with the Mexican contractor MEDRANO Y ASOCIADOS.</p><h4><strong><em>In the Rocky Mountains — Utah (USA)…</em></strong></h4><p>The work in the Cemex factory gave Gabriel Medrano the confidence and trust to invite us to represent him in a supervisory job at the Holnam plant in Devil’s Slide, Utah, USA.</p><p>The initial assignment to supervise the construction of the silos became a greater responsibility when the contractor for that work, American Marietta, suddenly declared bankruptcy, leaving the works unfinished. So, a very small project management team, four people including the team leader, took control of all the unfinished works and practically without interruption or major delays over the initial schedule and to a large extent within budget the works were completed. The unfinished contract with the bankrupt initial contractor was liquidated, without going to court, the claims for payments and high compensation by subcontractors and suppliers for services rendered to that project were satisfactorily closed.</p><h4>In Cuba…</h4><p>A few months after my return to Colombia from the United States, HOLDERBANK, Canada, invited me to be part of the management team responsible for the renovation and technological update of the Cement Factory of Cienfuegos, in Cuba, a project that, to the technical difficulties of a larger scale modification in the existing structures to house the new equipment with more capacity, added the even greater difficulties, related to the contractual management and the enormous resource limitations of the environment.</p><p>Cementos Cienfuegos SA was the first large basic industry company in Cuba, formed as a “mixed” company, in which ownership is shared, as in a joint-stock company, between the socialist state and a capital company.</p><p>Harmonize two “business” cultures so diametrically opposed, and carry out the works with the criteria of quality, budget and execution time according to European standards, in an environment with many shortcomings and restrictions on the “capitalist” concepts of stimulating workers; gave rise to multiple obstacles that made this project a challenge and an unparalleled experience.</p><p>With an extraordinary point in favor, the two cultures shared the priority of safety over any other concept, and the superior level of formal education and general culture of all the workers, made this aspect the most rewarding of the execution of the project.</p><h4>In the heart of the Carpathian Mountains in Romania…</h4><p>A year and a half later, upon completion of the construction of the Water Sports Complex in Bogotá, I joined the team that was in charge of modernizing Holcim’s cement factory in Campulung, in Romania.</p><p>The project consisted of converting the existing clinker production plant with four furnaces into a plant with the same capacity with a single furnace, adding the processes of pre- homogenization of raw materials and the use of alternative fuels.</p><p>I was in charge of civil works, but from the initial discussions of process engineering and general arrangements, I became involved in issues related to the other disciplines.</p><p>Memorable were the conversations with the highly experienced engineers from the German silo design firm, the discussions related to deep foundations between the German-educated Romanian professor of geotechnics and the Belgian-educated Greek builder; the talks with the Romanian consultant, specialist in structural design, emeritus professor at the University of Bucharest on the project structures and the validation of the design of the pre-homogenization hall, an space structure with 84 meters of free span, designed in Canada by a Colombian-Canadian consultant.</p><p>The execution phase was a permanent engineering exercise, and particularly, the implementation of construction methods with the construction contractors.</p><p>An example was the decision to centralize with an Austrian supplier the high-capacity cranes; guaranteeing equipment operated and maintained in optimal conditions and the provision of timely service. Specific examples of the success of this decision were the supply of the 500 ton capacity telescopic crane for the erection of the clinker silos roof and equipment and the repair of the tower crane used in the construction of the structure and assembly of the pre-heater equipment. An event in which the supplier used a helicopter to replace the engine of the tower crane, installed in the counterweight at a height of 140 meters, so that the crane, essential for the execution of the works, was only out of service for three days.</p><p>At a certain point in the project, I had to assumed, in addition to the functions of the civil works management, the general construction management of the project. From that stage, I particularly remember the implementation of the alternative fuels project, in all its phases from design to construction and commissioning, including the preliminary and temporary phase for the use of tires as an alternative fuel at the calcine stage of the clinker production.</p><h4>Back to the origin,</h4><p>The following year and a half, in Colombia, in Nobsa, assigned by the organization in Switzerland to support a project in crisis. It was the construction of a new cement grinding line including a multi cell cement silo;the structural engineering peer reviewers found critical discrepancies in the developed engineering, and the project started to experience delays creating an internal conflict with the operational and financial team and other conflict with the construction contractors.</p><p>Rarely have I worked so hard with such a capable team, with results difficult to evaluate from the perspectives of execution time and cost, but objectively from the aspects of safety and quality, two million man-hours without disabling work accidents (LTI) and a grinding station (Cement Mill 3), historically producing above its nominal capacity with the best operational availability and efficiency indices.</p><h4>From the origin to the antipodes, to the island of Java, in Indonesia,</h4><p>I arrived to Asia appointed as a construction manager in the project management team for the construction of a cement factory, close to the sea, in Tuban, to produce 4000 tons of Clinker per day and dispatch one and a half million tons of cement per year, with a jetty-type port facility.</p><p>The construction work of the buildings and the supply and assembly of the equipment related to the clinker and cement production process were carried out under an engineering, supply and construction (EPC) contract; port facilities with the modality of “packages” with contracts at fixed prices; and infrastructure with in-house engineering and unit price contracts with local contractors.</p><p>The EPC contract, of great technical and constructive complexity, and apparently the least complex from the perspective of contractual management, became a space of permanent confrontation and open claims. This environment prevented more timely solutions from being found to the problems that always arise in the development of a work, despite the fact that the parties assigned a highly competent team of highly qualified professionals and contractors to the project. Market conditions made it urgent to double the plant’s capacity; Paradoxically, this circumstance made it possible to close the accumulated differences in the first contract and advance a second on better terms.</p><p>In the development of the contract for the construction of the civil works of the jetty, it was possible to implement a “partnering” (cooperation) scheme for the management of contractual relationships, which made it possible to significantly improve the quality of the original design by applying the concept of “ value-added engineering ”; and to overcome the obstacle that meant the loss of the main construction equipment owned by the contractor, equipment that was wrecked in the Pacific when it was towed to the work site; a situation that could have ended in the courts and without work and that was corrected in an exercise in which the parties established their positions in a transparent manner to reach solutions and compromises that allowed the work to be successfully concluded.</p><p>Confidence taking me to new confines: <strong>Cambodia and the Mekong Delta</strong> …The results of those five years of work were the recommendation to join the management team of the construction of a plant in Cambodia. A successful project, which merits its own story. …</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=b6b297d5bea5" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Building trust, a daily job]]></title>
            <link>https://etconsulting.medium.com/building-trust-a-daily-job-c1bc43b327c0?source=rss-1fe8e05c0968------2</link>
            <guid isPermaLink="false">https://medium.com/p/c1bc43b327c0</guid>
            <category><![CDATA[growth]]></category>
            <category><![CDATA[teamwork]]></category>
            <category><![CDATA[experience]]></category>
            <category><![CDATA[engineering]]></category>
            <category><![CDATA[trust]]></category>
            <dc:creator><![CDATA[Eduardo Torres]]></dc:creator>
            <pubDate>Tue, 22 Sep 2020 19:51:23 GMT</pubDate>
            <atom:updated>2020-09-22T19:51:23.385Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*GuOvhqu6wVP37BdC" /><figcaption>Photo by <a href="https://unsplash.com/@isaacmsmith?utm_source=medium&amp;utm_medium=referral">Isaac Smith</a> on <a href="https://unsplash.com/?utm_source=medium&amp;utm_medium=referral">Unsplash</a></figcaption></figure><p>Reflections from my experience</p><blockquote>Trust is built with consistent words and actions<br>Jorge Iriarte, FB, Oct 4, 2012</blockquote><blockquote>Trust: Openness, Certainty, Power, Spontaneity, Familiarity, Loyalty, Intimacy, Hope, Relief, Candidness, Conviction, Confidence, Security, Serenity<br>Woxicon / Synonyms / Spanish / C / Confidence</blockquote><p>This is the fifth installment of a reflection exercise on essential elements of project management. This segment in particular deals with the elements necessary to create trust. The type of trust that is built over time, with other people, and that which at the same time is earned for oneself, the one that allows you to stay on the job path and marks to a large extent the course of life itself.</p><p>I think that the following short chronicle, written in parallel with this exercise, illustrates the concept and most likely, dear reader, reflects your own story:</p><h4>If perhaps for a month…</h4><blockquote>The invitation came at the most opportune moment and from the least expected person.<br>The small engineering and construction company that we formed six years before had focused on works or projects that required sliding forms. That was our strength and our Achilles heel; because of the challenge that this type of construction implies, very few companies could face it with knowledge, experience and equipment (that was our advantage — few players in the market), but, the market was very limited (and that was the down side). As our financial condition was very weak, we were competing at a disadvantage; in such a way that, either they beheaded us due to the financial risk or they conditioned us to contract the works in consortium, a condition in which generally, due to the same financial weakness and due to the nature of our services, we had to assume the risk of labor in the specialized part of construction, one of the lowest cost components, but the most risky; a matter that, as in a vicious circle, limited us in the progress of the company’s qualification, which is measured by the volume of turnover and not by the complexity of the work.</blockquote><blockquote>One of these cases occurred in the construction of the second line of the Caracolito cement factory, near Ibagué. When the multinational Cemex acquired the national company Cementos Diamante, the national contractor that carried out the work was replaced by Mexican contractors trusted by the new owners.</blockquote><blockquote>With one of them, (Medrano y Asociados, them acting as contractors and we as their associates), we built several of the factory silos. Although the works were delivered to the satisfaction of the new owner; the winding up of the association (between Medrano y Asociados and us) was quite difficult and very tense.</blockquote><blockquote>So the call that I received a couple of years later from Gabriel Medrano was completely unexpected.</blockquote><blockquote>He requested that one of the two partners of our company travel to Utah, United States, to supervise some work in the construction of silos in a Holcim plant, for a period of three months. He had to meet that request, since Holcim was one of his main clients in Mexico. His company, for reasons of its ongoing contracts, did not have any person to whom it could delegate an order of such responsibility. He trusted us to successfully oversee the work on their behalf. The decision was not difficult for us, we were in a dry season, there was no work, the conditions were good, it would be a very timely income for the meager finances of our company and an interesting experience. The decision of who would attend the request was simple, I had a visa that would allow me to travel with the urgency that Gabriel required, his final question was, “Eduardo, do you speak English?”; my answer, “YES!”.</blockquote><blockquote>The matter promised to go better than expected, we received a second call from Gabriel who told us that the Director of that project in Utah, an Engineer called Tom Ireland, was very happy with Medrano’s appointees for the work in Utah. Tom had been the project manager for the conversion of the Holcim Cement Factory in Nobsa, where we had acted as subcontractors, doing a job with exceptional results in the construction of the preheater tower.</blockquote><blockquote>I arrived at the Devil’s Slide plant in Utah, one day of the last year of the 20th century. It was the early fall, early in the morning, Ramiro Velasco, the Holcim engineer in charge of the construction, was waiting for me with the references that Gabriel and Tom had given him; he was busy (as is usually the case in the early hours of the day in the middle of a project); so take advantage of the time, I took a tour of the project site.</blockquote><blockquote>Upon my return to his office, and when we were beginning our conversation about the work to be done and the responsibilities in my charge, a call came in from Tom, who, knowing that I was there, asked to put me on the phone, on the speaker, for an informal and friendly conversation, but there was a “critical” question, “Eduardo, How do you see things?” And my short answer, “Good, but they can be improved!”</blockquote><blockquote>When the call ended and we returned to our conversation about work, the tone, almost imperceptibly, was no longer the same, to my comment that my assignment would be for three months, a clarification was followed from the engineer Velasco, “The Director doesn’t have the latest information; your assignment is perhaps for a month”.</blockquote><blockquote>I took the news calmly, at that moment everything was profit, a trip, an experience and a financial relief, momentary, but relief, having the water around your neck, you only need a point of support, enough so that the water does not cover nose …</blockquote><blockquote>At the end of the first month, a question, Engineer (Velasco), when do I travel back home? And an answer, “Engineer, next month”.</blockquote><blockquote>And so from month to month, with an almost imperceptible change, the question was: “Ramiro, when do I travel back home?” And the answer, “Eduardo, next month”.</blockquote><blockquote>That assignment of “perhaps a month” lasted for thirteen months. And after a pause of almost a year, another call, this time from Ramiro himself: “come on, I’ll wait for you in Cuba”. A project that absorbed us for three and a half years. A year and a half later, another call: “we need you in Romania”. Another busy five years, and right after: “let’s go to Indonesia”. A double project for five and a half years more.</blockquote><blockquote>Ramiro, an engineer with a career at Holcim, received assignments of greater responsibility; For me, the intermittences between jobs for Holcim and jobs in other sectors gave me a permanent and very enriching field of learning and the opportunity to gradually assume roles of greater importance and responsibility.</blockquote><blockquote>The projects yielded formidable experiences, both from the perspective of technical challenges and from the difficulties associated with cultural differences.</blockquote><blockquote>Finishing the project in Indonesia, Ramiro was assigned to a project in Brazil, I was hired for a project in Cambodia; then Ramiro was transferred to a project in the United States. When I finished my project in Cambodia, and after a sabbatical break, I was hired for a project in Vietnam.</blockquote><blockquote>The pandemic surprised us, Ramiro in Guadalajara (Mexico), attending a project in El Salvador online, and me in Ho Chi Minh (Vietnam), writing these lines.</blockquote><blockquote>There would be many ways to fill pages with data and comments on the very diverse experiences of the projects that we shared with Ramiro throughout those fifteen years, but none will be more valuable than the metamorphosis of turning engineers into colleagues and over time colleagues into friends. And in a tribute to the friendship that we cultivated at that time and to the affection that he has for my children and that which I profess for his, resulted in his gesture of choosing me as the godfather of his youngest daughter.</blockquote><blockquote>Compadre, thank you for the trust and take good care of yourself.</blockquote><p>This story is the result of hard teamwork, in fact, of many teams working with common goals harmonizing different interests, with mentors and leaders who led the way and provided decisive and timely support, in a continuous effort that allowed to overcome the small day-to-day difficulties, but also occasional overwhelming challenges.</p><p>In those endeavors, many people gave the best of each one of them, with many of them we built very strong working bonds; with the vast majority, feelings of sincere appreciation, respect, and mutual trust. With some of those people, we built lasting friendships that endure despite the geographical distance and the absence.</p><p>With the development of different projects, gradually, each day and with each experience, I also gained confidence in myself, which allows me today, despite, or thanks to the pandemic, walk a new path and endeavor in the realization of these reflections.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=c1bc43b327c0" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Desde los Andes hasta el Delta del Mekong]]></title>
            <link>https://etconsulting.medium.com/desde-los-andes-hasta-el-delta-del-mekong-e25f8ea32e6e?source=rss-1fe8e05c0968------2</link>
            <guid isPermaLink="false">https://medium.com/p/e25f8ea32e6e</guid>
            <category><![CDATA[construcción]]></category>
            <category><![CDATA[ingeniería]]></category>
            <category><![CDATA[experiencias]]></category>
            <category><![CDATA[aprendizaje]]></category>
            <category><![CDATA[trayectoria]]></category>
            <dc:creator><![CDATA[Eduardo Torres]]></dc:creator>
            <pubDate>Mon, 14 Sep 2020 20:06:10 GMT</pubDate>
            <atom:updated>2020-09-14T20:17:09.698Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*nsCQeLhlRx1Jg3Yx" /><figcaption>Photo by <a href="https://unsplash.com/@chuttersnap?utm_source=medium&amp;utm_medium=referral">chuttersnap</a> on <a href="https://unsplash.com/?utm_source=medium&amp;utm_medium=referral">Unsplash</a></figcaption></figure><h4>Un itinerario de permanente aprendizaje</h4><h4>Reflexiones desde la Experiencia</h4><p>En el anterior escrito, ilustrando el tema de la construcción de confianza, esbocé de manera muy general el itinerario que me llevó de proyecto en proyecto, desde la cordillera de los Andes en Colombia hasta el Delta del Mekong en Vietnam, brindándome una vida de permanente aprendizaje.</p><p><strong><em>En el altiplano de Boyacá, a principios de los ochentas</em></strong>, se forjaron los primeros eslabones de esta cadena. Con Jaime Becerra, estábamos a cargo de los trabajos con formaletas deslizantes que SADE SA hacía como contratista del consorcio DISTRAL SA-MITSUBISHI HEAVY INDUSTRIES; en un quinquenio construimos las chimeneas y los silos de todas las centrales termoeléctricas que en ese periodo se edificaron en el país.</p><p>DISTRAL SA era una empresa colombiana muy grande. Su actividad principal era la fabricación y montaje de calderas razón por la cual estaban presentes en todos los proyectos de ese tipo que se hacían en el país y en algunos en el exterior, pues exportaban sus calderas, incluso a los Estados Unidos.</p><p>MITSUBISHI, como lo hace todavía alrededor del mundo, proveía las turbinas y los generadores.</p><p>Una década más tarde, Jaime y yo nos asociamos y constituimos una pequeña empresa de ingeniería y construcciones que llamamos COBETO (Constructora Becerra Torres Cía. Ltda.). Para esa época, nuestro antiguo compañero y amigo Jairo García ya había establecido FOSTER INGENIERIA, empresa dedicada al diseño y suministro de formaletas modulares industrializadas.</p><p>En ese entonces, el Ingeniero Camilo García, Gerente de CONSTRUCCIONES Y MONTAJES DISTRAL (CMD), aceptó la propuesta conjunta que hicimos con Jairo para construir los silos y la torre del pre-calentador de las obras de la reconversión de la fábrica de cemento de HOLCIM en Nobsa, en las que CMD era uno de los dos contratistas generales.</p><p>Algunos años después, Jairo nos recomendó ante los contratistas de la segunda línea de la fábrica de cementos de Cemex en Caracolito, cerca de Ibagué, en donde construimos los silos en consorcio con el contratista mexicano MEDRANO Y ASOCIADOS.</p><p>El trabajo en la fábrica de Cemex, le dio la confianza necesaria a Gabriel Medrano para invitarnos a representarlo en un trabajo de supervisión en la planta de Holnam en Devil’s Slide, Utah, USA.</p><p><strong><em>En las Montañas Rocosas, transitando del siglo 20 al 21</em></strong>, la asignación inicial para supervisar la construcción de los silos, se tornó en una responsabilidad mayor cuando el contratista de aquella obra, American Marietta, se declaró súbitamente en bancarrota dejando las obras sin terminar, entonces, un muy pequeño equipo de manejo de proyecto, cuatro personas incluyendo el líder del equipo, tomamos el control de todos los trabajos inconclusos y prácticamente sin interrupción ni mayores demoras sobre el programa inicial y en una buena medida dentro del presupuesto se terminaron las obras y se liquidó, sin llegar a los tribunales, el contrato inconcluso con el contratista inicial en bancarrota, se cerraron satisfactoriamente los reclamos de pagos y compensaciones elevados por los subcontratistas y proveedores por servicios prestados a ese proyecto.</p><p>Unos meses después de mi regreso a Colombia, HOLDERBANK, Canadá, me invitó a formar parte del equipo de gerencia del proyecto en la renovación y actualización tecnológica de la Fábrica de Cementos de Cienfuegos, <strong><em>la “Perla del Sur”, en Cuba</em></strong>, un proyecto que, a las dificultades técnicas de una modificación de escala mayor en las estructuras existentes para albergar los nuevos equipos de más capacidad, sumaba las dificultades aún mayores, relacionadas con el manejo contractual y las enormes limitaciones de recursos del entorno.</p><p>Cementos Cienfuegos SA era la primera gran empresa de la industria básica en Cuba, conformada como empresa “mixta”, en la que la propiedad se comparte, como en una sociedad por acciones, entre el estado socialista y una empresa de capitales.</p><p>Armonizar dos culturas “empresariales” tan diametralmente opuestas, y adelantar las obras con los criterios de calidad, presupuesto y tiempo de ejecución según los estándares europeos, en un entorno con muchísimas carencias y restricciones a los conceptos “capitalistas” de estímulo a los trabajadores; dieron origen a diarios y múltiples escollos que hicieron de este proyecto un reto y una experiencia sin par. Con un extraordinario punto a favor, las dos culturas compartían la prioridad de la seguridad sobre cualquier otro concepto, y el nivel superior de educación formal y de cultura general de todos los trabajadores, hicieron de este aspecto el más gratificante de la ejecución del proyecto.</p><p>Año y medio después, al terminar la construcción del Complejo de Deportes Acuáticos de Bogotá, me integré al equipo que estaba a cargo de la modernización de la fábrica de cemento de Holcim en Campulung, <strong><em>en el corazón de los Montes Cárpatos en Rumania</em></strong>.</p><p>El proyecto consistía en re-convertir la planta existente de producción de Clinker de cuatro hornos en una planta de la misma capacidad de un solo horno, adicionando los procesos de pre-homogenización de materias primas y utilización de combustibles alternativos.</p><p>Estaba a cargo de las obras civiles, pero desde las discusiones iniciales de ingeniería de proceso y de arreglos generales, me fui involucrando en temas relacionados con las otras disciplinas.</p><p>Fueron memorables las conversaciones con los muy experimentados ingenieros de la firma alemana diseñadora de los silos, las discusiones relacionadas con las cimentaciones profundas entre el profesor rumano doctor en geotecnia educado en Alemania y el constructor griego educado en Bélgica; las pláticas con el consultor rumano, especialista en diseño estructural, profesor emérito de la Universidad de Bucarest sobre las estructuras del proyecto y la validación del diseño de la nave de pre homogenización, una estructura espacial con 84 metros de luz libre, diseñada en Canadá por un consultor colombo-canadiense.</p><p>La fase de ejecución fue un ejercicio permanente de ingeniería, la implementación de los métodos de construcción con los contratistas de la obra; la decisión de centralizar con un proveedor austriaco las grúas de gran capacidad; garantizando equipos operados y mantenidos en óptimas condiciones y el servicio más oportuno. Un ejemplo de lo acertado de esa decisión fue el suministro de la grúa telescópica de 500 ton de capacidad y la reparación de la torre grúa utilizada en la construcción de la estructura y montaje de los equipos del pre-calentador, evento en el que el proveedor utilizó un helicóptero para reemplazar el motor de la torre grúa, instalado en el contrapeso a 140 metros de altura, de manera que, la grúa, esencial para le ejecución de los trabajos, solo estuvo fuera de servicio tres días.</p><p>Este proyecto, requirió que en cierto momento asumiera, además de las funciones de la dirección de las obras civiles, la dirección de la construcción general. De esa etapa, recuerdo particularmente la implementación del proyecto de combustibles alternativos, en todas sus fases desde el diseño hasta la construcción y puesta en marcha, incluyendo la fase preliminar y temporal para el uso de neumáticos como combustible alternativo.</p><p><strong><em>De regreso al origen</em></strong>, el siguiente año y medio, en Colombia, en Nobsa, asignado por la organización en Suiza a apoyar un proyecto en crisis. Pocas veces he trabajado tan duro con un equipo tan capaz, con resultados difíciles de evaluar desde las perspectivas de tiempo de ejecución y costo, pero si objetivamente desde los aspectos de seguridad y calidad, dos millones de horas hombre sin accidentes laborales incapacitantes (LTI) y una estación de molienda (Molino de Cemento 3), produciendo históricamente por encima de su capacidad nominal con los mejores índices de disponibilidad operacional y eficiencia.</p><p><strong><em>Del origen a las antípodas, a la Isla de Java</em></strong>, en Indonesia, como gerente de construcción en el equipo de gerencia del proyecto para la construcción de una fábrica de cemento, cercana al mar, en Tuban, para producir 4000 toneladas de Clinker por día y despachar un millón y medio de toneladas de cemento por año, con una facilidad portuaria tipo jetty.</p><p>Los trabajos de construcción de los edificios y el suministro y montaje de los equipos relacionados con el proceso de producción de clinker y cemento se ejecutaron con un contrato de ingeniería, suministro y construcción (EPC); las facilidades portuarias con la modalidad de “paquetes” con contratos a precios fijos y la infraestructura con ingeniería de la casa y contratos de precios unitarios con contratistas locales.</p><p>El contrato EPC, de gran complejidad técnica y constructiva, y aparentemente el menos complejo desde la perspectiva de manejo contractual, se convirtió en un espacio de permanente confrontación y reclamos abiertos. Ese ambiente impidió que se encontraran soluciones más oportunas a los problemas que siempre surgen en el desarrollo de una obra, a pesar de que las partes destinaron al proyecto un equipo muy competente de profesionales y contratistas muy calificados. Las condiciones del mercado hicieron urgente la duplicación de la capacidad de la planta; paradójicamente, esa circunstancia permitió cerrar las diferencias acumuladas en el primer contrato y adelantar un segundo en mejores términos.</p><p>En el desarrollo del contrato de construcción de las obras civiles del “jetty”, se logró implementar un esquema de “partnering” (cooperación) para el manejo de las relaciones contractuales, que permitió mejorar ostensiblemente la calidad del diseño original aplicando el concepto de “ingeniería con valor agregado”; y superar el obstáculo que significó la pérdida del equipo principal de construcción propiedad del contratista, equipo que naufragó en el Pacifico cuando se remolcaba a la obra; situación que podría haber terminado en los tribunales y sin obra y que se subsanó en un ejercicio en el que las partes establecieron sus posiciones de manera transparente para llegar a soluciones y compromisos que permitieron concluir exitosamente la obra.</p><p><strong><em>La confianza llevándome a nuevos confines: Camboya y el Delta del Mekong…</em></strong></p><p>Los resultados de esos cinco años de trabajo fueron la recomendación para vincularme al equipo de gerencia de la construcción de una planta en Camboya. Un proyecto exitoso, que como lo mencioné en mi primer escrito de esta serie, podría ser un caso de estudio y que me abrió la puerta para llegar a Vietnam, a un proyecto que me brindó una oportunidad formidable de aprendizaje, como lo describí en el segundo artículo de esta saga, “Una torre de Babel”.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=e25f8ea32e6e" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Construir confianza, un trabajo diario]]></title>
            <link>https://etconsulting.medium.com/construir-confianza-un-trabajo-diario-bfbc9eb1841e?source=rss-1fe8e05c0968------2</link>
            <guid isPermaLink="false">https://medium.com/p/bfbc9eb1841e</guid>
            <category><![CDATA[confianza]]></category>
            <category><![CDATA[crecimiento-personal]]></category>
            <category><![CDATA[ingeniería]]></category>
            <category><![CDATA[trabajo-en-equipo]]></category>
            <category><![CDATA[experiencias]]></category>
            <dc:creator><![CDATA[Eduardo Torres]]></dc:creator>
            <pubDate>Thu, 27 Aug 2020 21:02:02 GMT</pubDate>
            <atom:updated>2020-08-27T21:02:02.257Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*1UprwbF8phuohk7P" /><figcaption>Photo by <a href="https://unsplash.com/@isaacmsmith?utm_source=medium&amp;utm_medium=referral">Isaac Smith</a> on <a href="https://unsplash.com/?utm_source=medium&amp;utm_medium=referral">Unsplash</a></figcaption></figure><h4>Reflexiones desde la experiencia</h4><blockquote>“La confianza se construye con palabras y acciones coherentes”<br>Jorge Iriarte, FB, Oct 4, 2012</blockquote><blockquote>“Confianza: Franqueza, Certeza, Poder, Espontaneidad, Familiaridad, Temeridad, Anhelo, Lealtad, Intimidad, Esperanza, Desprevención, Alivio, Candidez, Convencimiento, Confidencia, Seguridad, Serenidad”<br>Woxicon / Sinónimos / Español / C / confianza</blockquote><p>A manera de breve introducción, soy ingeniero civil, con 44 años de experiencia en el manejo de proyectos de construcción en América (Colombia, República Dominicana, Estados Unidos y Cuba), Europa (Rumania) y Asia (Indonesia, Camboya y Vietnam).</p><p>Esta quinta entrega del ejercicio de reflexión sobre elementos esenciales de la gerencia de proyectos, se refiere a lo que significa crear <strong>confianza</strong>, esa que se construye a lo largo del tiempo, con otras personas y la que al mismo tiempo se gana para uno mismo, la que permite mantenerse en el camino laboral y marca en una buena medida el rumbo de la vida misma.</p><p>Creo que la corta crónica que encontrará a continuación, escrita en paralelo con este ejercicio, ilustra bien el concepto y muy probablemente, estimado lector, refleja su propia historia:</p><blockquote><strong>Si acaso por un mes …</strong></blockquote><blockquote>La invitación llegó en el momento más oportuno y de la persona menos esperada.</blockquote><blockquote>La pequeña empresa de ingeniería y construcción que constituimos seis años atrás se había enfocado en las obras o proyectos que requieren formaletas deslizantes, ese era nuestro punto fuerte y nuestro talón de Aquiles, pues siendo pocas las empresas que podían enfrentar con conocimiento, experiencia y equipos el reto que implica este tipo de construcción, el mercado era muy limitado. Como nuestra condición financiera era muy débil, competíamos en desventaja; de manera que, o nos descabezaban por el riesgo financiero o nos condicionaban a contratar las obras en consorcio, condición en la que generalmente, por esa misma debilidad financiera y por la naturaleza de nuestros servicios, teníamos<br>que asumir el riesgo de la mano de obra en la parte especializada de la construcción, uno de los componentes de costo menores, pero el más riesgoso; asunto que, como en un círculo vicioso nos limitaba en el progreso de la calificación de la empresa, que se mide por el volumen de la facturación y no por la complejidad de la obra.</blockquote><blockquote>Uno de esos casos se presentó en la construcción de la segunda línea de la fábrica de cementos de Caracolito, cerca de Ibagué. Cuando la multinacional Cemex adquirió la empresa nacional Cementos Diamante, el contratista nacional que adelantaba los trabajos fue reemplazado por contratistas mexicanos de la confianza de los nuevos dueños.</blockquote><blockquote>Con uno de ellos, Medrano y Asociados, ellos actuando como contratistas y nosotros como sus asociados, construimos varios de los silos de la fábrica. Aunque las obras se entregaros a satisfacción del nuevo dueño; la liquidación de la asociación fue bastante difícil y muy tensa.</blockquote><blockquote>De modo que fue inesperada la llamada que un par de años más tarde recibimos de Gabriel Medrano.</blockquote><blockquote>Nos solicitaba que uno de los dos socios de nuestra empresa, se desplazara a Utah, Estados Unidos, para supervisar unos trabajos en la construcción de unos silos en una planta de Holcim, por un periodo de tres meses. Él debía atender esa solicitud, pues Holcim era uno de sus clientes principales en México. Su empresa, por razones de sus contratos en marcha, no disponía de ninguna persona a quien pudiera delegar un pedido de tanta responsabilidad. Confiaba en nosotros para poder superar ese escollo. Para nosotros no fue difícil la decisión, estábamos en una época de sequía, no había trabajo, las condiciones eran buenas, sería un ingreso muy oportuno para las magras finanzas de nuestra empresa y una experiencia interesante. La decisión de quien atendería el pedido fue sencilla, yo tenía una visa que me permitiría viajar con la urgencia que lo requería Gabriel, su pregunta final fue, “Eduardo, ¿hablas inglés?”; mi respuesta, “YES!”.</blockquote><blockquote>El asunto prometía ir mejor de lo esperado, recibimos una segunda llamada de Gabriel que nos comentaba que el Director de aquel proyecto, el Ingeniero Tom Ireland, estaba muy contento con la respuesta de Medrano. Tom había sido el director del proyecto de reconversión de la Fábrica de Cementos de Holcim en Nobsa, donde nosotros habíamos actuado como subcontratistas, haciendo un trabajo con excepcionales resultados en la construcción de la torre del precalentador.</blockquote><blockquote>Llegué a la planta de Devil’s Slide, un día del último año del siglo 20, a principios del otoño, temprano en la mañana, Ramiro Velasco, el ingeniero de Holcim a cargo de la construcción, me esperaba con las referencias que Gabriel y Tom le habían dado; estaba ocupado como suele ocurrir a primera hora en los proyectos; y para no mantenerme esperando y aprovechar el tiempo, di una vuelta por las obras.</blockquote><blockquote>A mi regreso a su oficina, y cuando estábamos iniciando nuestra conversación sobre los trabajos a hacer y las responsabilidades a mi cargo, entró una llamada de Tom, quien al saber que yo estaba allí, pidió que me pusiera al teléfono, por el altavoz, para una conversación informal y amistosa, pero hubo una pregunta “fatal”, ¿Cómo ves las cosas? Y mi respuesta, “Bien, ¡pero se pueden mejorar!”</blockquote><blockquote>Cuando terminó la llamada y regresamos a nuestra conversación sobre el trabajo, el tono, de manera casi imperceptible, ya no era el mismo, a mi comentario de que mi asignación seria por tres meses, siguió una aclaración del ingeniero Velasco, “El Director no tiene la última información, si acaso, por un mes.”</blockquote><blockquote>Yo tome la noticia con calma, en aquel momento todo era ganancia, un viaje, una experiencia y un alivio financiero, momentáneo, pero alivio, teniendo el agua al cuello, solo se necesita un punto de apoyo, suficiente para que el agua no tape la nariz …</blockquote><blockquote>Al término del primer mes, una pregunta, Ingeniero, ¿cuando viajo? Y una respuesta, Ingeniero, el mes próximo.</blockquote><blockquote>Y así de mes en mes, con un cambio casi imperceptible, la pregunta era: Ramiro, ¿cuando viajo? Y la respuesta, Eduardo, el mes próximo.</blockquote><blockquote>Esa asignación de “si acaso un mes”, se prolongó por trece, y después de una pausa de casi un año, otra llamada, esta vez de Ramiro, vente, te espero en Cuba, un proyecto que nos absorbió tres años y medio, año y medio más tarde, otra llamada, te necesitamos en Rumania, ocupados cinco años, y sin pausa, vámonos a Indonesia, un proyecto doble, cinco años y medio.</blockquote><blockquote>Ramiro, un ingeniero con carrera en Holcim, recibió asignaciones de mayores responsabilidades; a mí, las intermitencias entre los trabajos para Holcim y los trabajos en otros sectores, me brindaron un permanente y muy enriquecedor campo de aprendizaje y la oportunidad de ir asumiendo paulatinamente roles de mayor envergadura y responsabilidad.</blockquote><blockquote>Los proyectos depararon experiencias formidables, tanto desde la perspectiva de los retos técnicos como desde las dificultades asociadas a las diferencias culturales.</blockquote><blockquote>Terminando el proyecto en Indonesia, Ramiro fue asignado a un proyecto en Brasil, yo fui contratado para un proyecto en Camboya; después Ramiro fue trasladado a un proyecto en los Estados Unidos; al terminar mi proyecto en Camboya y tras una pausa sabática, fui contratado para un proyecto en Vietnam.</blockquote><blockquote>La pandemia nos sorprendió, a Ramiro en Guadalajara, atendiendo “on line” un proyecto en El Salvador, a mí en la ciudad de Ho Chi Minh, escribiendo estas líneas.</blockquote><blockquote>Habrá como llenar páginas con datos y comentarios de las muy diversas experiencias de los proyectos que compartimos con Ramiro a lo largo de esos quince años, pero ninguna será más valiosa que la metamorfosis de convertir ingenieros en compañeros y con el tiempo a los compañeros en amigos; y en un tributo a la amistad que cultivamos en ese tiempo y al cariño que él les tiene a mis hijos y el que yo profeso por los suyos, su gesto de hacerme padrino de su hija menor.</blockquote><blockquote>Compadre, gracias por la confianza y cuídese mucho.</blockquote><p>Esta historia es el resultado de un arduo trabajo de equipo, en realidad, de muchos equipos trabajando con miras comunes armonizando intereses diferentes, con mentores y líderes que marcaron el camino y brindaron apoyo decidido y oportuno, en un esfuerzo continuo que permitió superar las pequeñas dificultades del día a día, pero también ocasionales dificultades abrumadoras.</p><p>En esos empeños, muchas personas dieron lo mejor de cada una de ellas, con muchas de ellas construimos lazos muy fuertes de trabajo; con la gran mayoría, sentimientos de sincero aprecio, respeto y mutua confianza. Con algunas de esas personas, amistades perdurables a la distancia y a la ausencia.</p><p>Con el paso de los proyectos, paulatinamente, cada día y con cada experiencia, también fui ganado confianza en mí mismo, la que me permite hoy, a pesar de, o gracias a la pandemia, andar por un nuevo camino, del cual hace parte escribir estas reflexiones.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=bfbc9eb1841e" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[One of lime and another of sand]]></title>
            <link>https://etconsulting.medium.com/one-of-lime-and-another-of-sand-277241761e6a?source=rss-1fe8e05c0968------2</link>
            <guid isPermaLink="false">https://medium.com/p/277241761e6a</guid>
            <category><![CDATA[entrepreneurship]]></category>
            <category><![CDATA[entrepreneuriat]]></category>
            <category><![CDATA[engineer]]></category>
            <category><![CDATA[civil-engineering]]></category>
            <category><![CDATA[entrepreneur]]></category>
            <dc:creator><![CDATA[Eduardo Torres]]></dc:creator>
            <pubDate>Tue, 18 Aug 2020 22:52:37 GMT</pubDate>
            <atom:updated>2020-08-18T22:52:37.266Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*Rt5prFohOCWvcp_s" /><figcaption>Photo by <a href="https://unsplash.com/@nullplus?utm_source=medium&amp;utm_medium=referral">Razvan Chisu</a> on <a href="https://unsplash.com/?utm_source=medium&amp;utm_medium=referral">Unsplash</a></figcaption></figure><h4>Cisneros-Popalito / Chichimene-Apiay</h4><h4>Entrepreneurship, learning and reaffirmation</h4><p><em>Reflections from my experience</em></p><p>As way brief introduction, I am a civil engineer, with 44 years of experience in managing construction projects in America (Colombia, Dominican Republic, United States and Cuba), Europe (Romania) and Asia (Indonesia, Cambodia and Vietnam). This is the fourth reflection exercise on learnings throughout<br>my career.</p><p>In today’s story I will try to share my first experience as an entrepreneur. Somehow, it was a time similar to the one we are currently living in, detached from the tutelage of the large multinational organization, I worked with less financially strong companies, with fewer resources, with greater exposure to risk, and with significant job precariousness. That context motivated the idea of starting a company, that along with the illusion of being my own boss, of seeking a better life and, that the business would prosper and endure.</p><h4>One of lime…</h4><p>In the mid-eighties, five engineers with reasonable experience founded, with little capital, but with great enthusiasm, an engineering and construction company, our experiences and academic preparation were complementary and the time was propitious, the downward economic and construction cycle seemed to be coming to an end and an upward cycle was in sight, due to various circumstances, large companies had left the market and left open a space of opportunities, the hiring policies of state entities had opened the door to stimulate the creation of small and medium-sized enterprises (the term “SMEs” was in vogue), job conditions began to deteriorate and therefore being employed was no longer so stable and promising; in short, with those conditions we decided to “jumped into the water.”</p><p>Early within the operation of the company we realized that we had to focus the effort on specialized jobs, we were lucky to understand that the most promising area for us was associated with jobs in the construction of the infrastructure to bring natural gas to all homes in the country, its use was incipient, but of dizzying growth. We first got a stake in the works of the urban gas pipeline in Barrancabermeja, then another job in Villavicencio. Things were looking good for us.</p><p>At that time, Ecopetrol, the National Oil Company, had implemented a policy of executing some pipelines by unbundling them, that is, contracting the execution in short sections and in some cases in phases.</p><p>That policy brought us the opportunity to obtain a contract in the construction of the Cisneros-Popalito variant, of the Sebastopol-Medellín pipeline, for the execution of the welding phase and construction of special crossing intersections in the Santo Domingo — Popalito Station section.</p><p>The contract was in the name of a qualified contractor with whom we had a private partnership agreement, so even though we performed the work, we did it on their behalf. Alberto, the partner with experience in transmission lines and who had been in charge of urban gas pipelines, acted as Director of the Work, I was the resident engineer. The partner with experience in the management and operation of equipment would be in charge of supplying the equipment that we had previously defined were needed to execute the works.</p><p>We would not be concerned with the “bending” of the tubes, that is to give the tubes the curves that are needed according to the topography of the land, that was such an specific activity that we decided to sub-contracted to a specialist contractor in that work.</p><p>The main equipment we needed was welding equipment and a backhoe. The initial plan was to buy them new, but there was an opportunity to make some savings, buying them used, at an auction that Cerrejón would do. This decision was the beginning of a series of events that brought us to the brink of failure. In the first instance, the purchase of the equipment at the auction delayed de arrival of the equipment on site, putting us against the ropes, the schedule was delayed, the costs had skyrocketed because we had the people ready to work, the qualified welders, the assistants willing, the bender and<br>his crew, the drivers, the pipe yard guards, the trucks, etc., etc… And things got serious when the equipment that arrived on site and that we were waiting so urgently was practically unusable.</p><p>We had already identified a plan B, and we activated it eagerly, we obtained rented equipment, at rates much higher than those estimated in the budget for the work, but less expensive than the loss of profits and the potential for fines. With the rented equipment, the jobs were progressing fast and we were making up for the delay, when an unforeseen difficulty arose, the welding tests began to show a recurring error. Repairing a weld is far more expensive than getting it done right, and our failure numbers were unimaginably high for the quality of welders we had. We tackled this issue with an additional crew, again, costs were hanging over us.</p><p>The potential cost of fines that could arise if there was any delay in the work was so brutal, that making an effort, which compromised our assets, we decided to cover the additional costs and we managed finish the work on time. Only at the end, when we welded the special crossing intersections, did we understood what had happened, in these sections, the pipe was new and we did not have any failure in the welds; While the pipe that Ecopetrol had supplied to us for the main section were recovered pipes from a line that had been dismantled, although almost imperceptible, the internal section of the pipes was not uniform, and that difference was what generated the failures. We documented a claim to receive compensation for the cost overruns derived from this situation, but we, under the scheme of associated with a private contract, had neither a voice nor a face before the entity that owned the pipeline. And our associates, the contractors, to whom this claim did not suit them in their business relationship with the entity and had a financial position that allowed them to bear the economic consequences of the event, withdrew the claim.</p><p>Shortly after that job, the company we had created was dissolved and each of the partners embarked on a new path. I learned (sometimes at a very high price), that you have to find the niche in which you are very competitive, that there are not only differences between theory and practice but also between practice in one environment and practice in another similar environment when there is a difference in resources; that any implementation that involves people requires time and that this time in general is not short term, it is medium to long term; that external pressures can lead to emotional decisions rather than pragmatic ones and that the consequences of these decisions can lead to situations of extreme difficulty; Therefore we learned that, the service must be sold at a price that compensates costs and with a profit margin; that plural societies are very difficult to manage, and that, if at critical moments<br>the unity of criteria of the partners fails, the society is diluted and what began with a great feeling of friendship can end up distancing friends and that In general, over time we understand that what we judged at the time as a failure was actually the trigger for the change that led us to another path.</p><h4>One of sand…</h4><p>At the beginning of the 1990s, the Chichimene-Apiay pipeline was built to transport the crude that Chevron extracted in the Chichimene field to Ecopetrol’s collection station in Apiay, near Villavicencio; a 40-kilometer line that crossed a good number of streams (called “caños” by the people of the region) and the channel of the Guayuriba River, which at the place of the crossing stretched for a width of almost 2 kilometers.</p><p>The Montecz-Conequipos Consortium won the Bid for the construction of the pipeline and invited me to direct the work. The consortium had the necessary resources, that is, qualified people, with a sense of belonging to the organizations, familiar with and committed to good safety and quality practices, with well-maintained equipment in good working order, with a reasonable inventory of consumables and materials and good purchasing management that guaranteed a supply on time. Open to improvements to procedures and with a good bonus scheme to stimulate achievements at all levels of the organization.</p><p>The challenge consisted in taking advantage of these conditions, maintaining the spirit of unity of the consortium and creating an atmosphere of cooperation with the owner and with the controller. This would allow the work to be carried out, quickly overcoming any technical and contractual discrepancies (that often arise throughout the development of these type of projects), and to be prepared as an entity (Owner, Controller, Contractor) to give a timely and forceful response, with the necessary resources, to any potential setbacks or emergencies.</p><p>We knew that the most critical activity of the project was the subfluvial crossing of the Rio Guayuriba. In this section of the river, the channel is very extensive, the water flows divided into several torrents, not very deep and usually not very large, however, the hydrology records, which are scarce, and especially the records of the local neighbors, indicated that in rainy seasons, the river ran the full width of the channel and the water level rose notably; with this information, we agreed with the owner of the work and with the auditors on the procedure to install the pipe; We would do it in two stages, first building some dikes or cofferdams that would channel the river through the middle of the channel and protect the excavation work of the trench and installation of the pipe to the middle of the river; and doing in a second stage the same work in the other half.</p><p>For the first stage, the preparation of the cofferdams took us more than a month of continuous work with an important train of bulldozers and backhoes stacking thousands of cubic meters of material forming the protection dike, we excavated the ditch, we prepared the section of ballasted pipe and when we were ready to do the “launching of the pipeline section”, as a consequence of torrential rains the river overflow above the levels we had estimated and in a few hours, it swept the cofferdam and filled with drag material and sediments the ditch. Responding to the emergency plan outlined in a general way, and based on the trust built with the counterpart, we rebuilt the cofferdams, re-excavated the trench and installed the pipes; Upon completion of the work, with the proper documentation, we obtained from the owner the compensation for the additional costs generated by the emergency. The project was delivered on time, the owner clearly expressed his satisfaction, and the contracting consortium received fair compensation for their effort. This experience reaffirmed my understanding of how important it is for a company to be very strong in its niche and the need to have control over essential resources; concept that was the basis of my next entrepreneurship.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=277241761e6a" width="1" height="1" alt="">]]></content:encoded>
        </item>
    </channel>
</rss>