<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0" xmlns:cc="http://cyber.law.harvard.edu/rss/creativeCommonsRssModule.html">
    <channel>
        <title><![CDATA[Stories by G Jayasankar Pillai on Medium]]></title>
        <description><![CDATA[Stories by G Jayasankar Pillai on Medium]]></description>
        <link>https://medium.com/@gjayasankar67?source=rss-6ed1c65f0749------2</link>
        <image>
            <url>https://cdn-images-1.medium.com/fit/c/150/150/0*6U9SEkaEBOO4X2sf</url>
            <title>Stories by G Jayasankar Pillai on Medium</title>
            <link>https://medium.com/@gjayasankar67?source=rss-6ed1c65f0749------2</link>
        </image>
        <generator>Medium</generator>
        <lastBuildDate>Mon, 23 Nov 2026 07:58:11 GMT</lastBuildDate>
        <atom:link href="https://medium.com/@gjayasankar67/feed" rel="self" type="application/rss+xml"/>
        <webMaster><![CDATA[yourfriends@medium.com]]></webMaster>
        <atom:link href="http://medium.superfeedr.com/" rel="hub"/>
        <item>
            <title><![CDATA[HULL DEFLECTION CALCULATION OF SHIPS]]></title>
            <link>https://medium.com/@gjayasankar67/hull-deflection-calculation-of-ships-437f7c723892?source=rss-6ed1c65f0749------2</link>
            <guid isPermaLink="false">https://medium.com/p/437f7c723892</guid>
            <category><![CDATA[aircraft]]></category>
            <dc:creator><![CDATA[G Jayasankar Pillai]]></dc:creator>
            <pubDate>Fri, 20 Sep 2019 11:13:05 GMT</pubDate>
            <atom:updated>2023-07-31T05:31:45.048Z</atom:updated>
            <content:encoded><![CDATA[<p><strong>HULL DEFLECTION CALCULATION OF SHIPS</strong></p><p><em>(Author: G.Jayasankar Pillai)</em></p><p><strong>Significance of Hull Deflection Calculation:</strong></p><p>Hull deflection calculation is very critical while designing long structures above main deck of ships as in an FPSO. The topside above main deck are not continuous along ships length, and the length of each of the topside is generally maintained less than 10% of ships length (as a general thump rule). This is to minimize the effect of hull girder bending on the topside structure and its stresses.</p><p>However the topsides are welded on the ships deck and placed on stool for load distribution to main deck structure. The ships hull is subjected to global hull girder loads of vertical still water bending moment /shear force, vertical wave bending moment /shear force, horizontal wave bending moment / shear force and torsional moments. In tankers converted to FPSO the hull vertical deflection due to vertical still water bending moment and wave bending moment causes maximum vertical deflection of the hull and considered critical for the topside design.</p><p>Hull vertical deflection is one of the main input parameter for the design of the topside structure on FPSO.</p><p>This article details how the hull vertical deflection at midship is calculated based on first principles. A sample VLCC is considered in the analysis.</p><p><strong>Sample Vessel Particulars</strong></p><p>The principal particulars of the sample double hull VLCC is considered. The particulars of the vessel is provided below.</p><p>Type: Double skin Oil Tanker</p><p>Length: 310.00 m</p><p>Breadth: 58.00 m</p><p>Depth: 31.00 m</p><p>Draft: 22.00 m (Scantling Draft)</p><p>Cb: 0.85</p><p>Vertical SWBM: 7.50e6 kNm (H); -6.0e6 kNm(S)</p><p>Vertical WBM: 9.68e6 kNm (H); 10.216 kNm(S)</p><p>Moment of Inertia at Midship: 1320 m⁴</p><p>The document details a basic procedure to calculate the vertical hull deflection at the midship of the vessel. The vertical hull deflection at the end is assumed to be zero.</p><p><strong>Hull Vertical Deflection Calculation:</strong></p><p>The basic definition of bending moment is considered in this calculation.</p><p>Bending Moment, <strong>BM = E.I.(d2y/dx2) — — — — — — — — — (1)</strong></p><p>BM= Vertical SWBM + Vertical WBM= 17.18 x 106 kNm</p><p>E= 2.06 x 105 N/mm2= 206,000 x 1000 kN/m²</p><p>I= 1,320.00 m4</p><p>17.18 x 106 = 206,000 x 1000 x 1,320 x (d2y/dx2)</p><p>17.18= 271,920 (d2y/dx2) <strong>— — — — — — — — — (2)</strong></p><p>Integrating (2) above;</p><p>17.18 x = 271,920 (dy/dx) + C1 <strong>— — — — — — — — — (3)</strong></p><p>At x= L/2= 310/2= 155m; slope dy/dx = 0</p><p>Hence (3) above turns out</p><p>17.18 x 155 = 271,920 x 0 + C1</p><p>Hence C1= 2662.90</p><p>Integrating (3) above;</p><p>17.18 (x2/2) = 271,920 (y) + 2662.90 (x)</p><p>Hence Vertical Deflection, y = [{17.18 (x2/2)} — {2662.90 (x)}]/ 271,920</p><p>y at midship (L/2) = {17.18 x (1552/2)- 2662.90 x 155}/(271,920)= 0.7589 m</p><p><strong>Conclusion:</strong></p><p>Hence maximum vertical deflection of the VLCC (315m x 58m x 31m x 22m) at the midship region is +/-<strong>758.90mm</strong> with deflection at the fore end and aft end as zero. The ratio of the ships length to max vertical deflection is ~ 415.</p><p><strong>This deflection of the hull girder at midship is significant and this needs to be taken into account in the design of the topside structure above main deck of an FPSO/ Tanker.</strong></p><p><strong>Hull Horizontal Deflection Calculation:</strong></p><p>Normally hull structure of VLCC etc are with high tensile steel with Yield min 355 MPa.</p><p>The allowable stress due to bending allowable by Classification societies is 175/k where k is the material factor. k is 1.0 for 235 Mpa yield/ k is 0.72 for 355 MPa yield material.</p><p>Hence based on this allowable bending stress due to SWBM and WBM is 175/0.72= 243 MPa.</p><p>From based formula for Youngs Modulus;</p><p>Youngs Modulus= Stress/ Strain</p><p>Strain= 243/2.06x10⁵=0.001179 mm/mm</p><p>Hence a longitudinal deflection of +/- 0.0012 mm/mm is a realistic strain which can be considered for the Horizontal hull deflection considering SWBM and WBM.</p><p>In profile view of topside, considering 0 strain at mid column, the strain at the forward columns “L”m from mid of module, due to sag will be = Strain x L. The sign depends on Hog/ Sag condition of the hull..</p><p><strong>Conclusion:</strong></p><p>Hence an assumption of 1.1mm/meter to 1.2mm/meter is a very realistic assumption of hull deflection considering SWBM and WBM of a standard VLCC hull for design of FPSO topside structure.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=437f7c723892" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Engineering Tips for the Offshore Oil & Gas Industry]]></title>
            <link>https://medium.com/@gjayasankar67/engineering-tips-for-the-offshore-oil-gas-industry-8733dd3890a7?source=rss-6ed1c65f0749------2</link>
            <guid isPermaLink="false">https://medium.com/p/8733dd3890a7</guid>
            <category><![CDATA[fpso-modu-mopu]]></category>
            <category><![CDATA[oil-and-gas]]></category>
            <category><![CDATA[offshore-engineering]]></category>
            <category><![CDATA[fpso-engineering]]></category>
            <category><![CDATA[oil-and-gas-engineering]]></category>
            <dc:creator><![CDATA[G Jayasankar Pillai]]></dc:creator>
            <pubDate>Wed, 28 Aug 2019 05:38:56 GMT</pubDate>
            <atom:updated>2019-09-06T12:17:28.661Z</atom:updated>
            <content:encoded><![CDATA[<h3><strong>ENGINEERING TIPS FOR THE OFFSHORE INDUSTRY</strong></h3><p><em>(Article by G.Jayasankar Pillai)</em></p><p>Engineering Tips for Offshore Oil &amp; Gas Facility Including FPSO, FSO, MOPU, MODU, FSRU based on my past 15 years’ experience.</p><p>Having about 15 years in Offshore O &amp; G engineering and 9 years in FPSO engineering, in Structural / Naval Architecture, I am very keen in sharing my experience (limited but rare) with those interested. Also being an FPSO enthusiast I have studied the Techno-Commercial details of several FPSO’s and some offshore projects find it very interesting. Believe in the fact “Knowledge is to be Shared”.</p><p>Oil and gas is the main source of energy today with Oil forming the major energy source. The world oil consumption today (2019) is about 98 million barrels of oil per day increasing at a rate of about 1.0 to 1.50 million barrels of oil per day. (Refer iea publications for details). India alone needs about 5 to 6 million barrels of oil per day as on today.</p><p><strong>(A) Oil &amp; Gas Formations:</strong></p><p>Oil and gas in combination with water, sand and other impurities are found below earth’s surface at varying depths in pockets known as “formations”. These are seen on land as well as below the seabed, offshore. This article mainly focuses on the Oil ad Gas facilities Offshore and the underlying engineering aspects. This article intends to focus on their various engineering aspects of FPSO, FSO, MOPU, MODU, FSRU etc. The potency of a formation is assessed based on VOIP or the Volume of Oil Inplace. The entire economics of the offshore project itself depends on this VOIP or OIIP (ie Original Oil in-place). Recoverable reserves are oil and gas reserves that are economically and technically feasible to extract at the existing price of oil. It is worth highlighting that the Oil / Gas that can be extracted is only about 25% to 30% of the VOIP/ OIIP unless new effective methods are followed to extract more from the formation.</p><p><strong>(B) Why FPSOs ?:</strong></p><p>Crude present in the formations (both offshore and onshore) is generally an unstable compound of oil, gas, water, sand and other impurities. This highly unstable compound is never suitable for storage, offloading or export. This crude needs to be stabilised &amp; separated to Oil and Gas for storage/ offloading and export to downstream facilities onshore. The separated gas is either reinjected to the well to retain well pressure, exported to a downstream facility or flared off.</p><p>Fixed platforms can support processing in shallow water (about 100 m max) but without crude storage and directly offloaded to onshore facilities through the subsea pipelines. However, with the increasing demand for Oil and Gas, exploring deep-water becomes a viable option. Storage is critical in such cases, due to logistics and hence an FPSO is found to be the best option for deep waters.</p><p>The FPSO is an integrated offshore facility capability of stabilizing crude, storing, offloading, re-injection (gas or water) or export. The separated water / gas is generally re-injected to the formation to maintain a positive well pressure. Hence an FPSO, Floating Production Storage and Offloading.</p><p>FPSOs are either of New Build hull or Converted from existing tanker hulls (but modified) based on the economic feasibility of the project.</p><p>The cost of an FPSO can range anywhere from US$ 300 million to US$ 800 million or could be as high as US$ 1200 million mainly based on factors like (i) hull size (ii) hull type- New build of conversion, (iii) topside facilities and weight (iii) mooring and (iv) SURF, Subsea Umbilical Risers Flow lines required. As of 2018, a VLCC double hull alone would cost about US$ 100 to 120 million for new build and about US$ 60 million for a used double hull VLCC hull. For FPSO conversions, the hulls used are either Panamax, Aframax, Suezmax or VLCC depends on the formation content, recoverable resources of Oil and Gas, number of wells, SURF etc.</p><p>The economics of the offshore Oil &amp; Gas project depends on VOIP / OIIP and the estimated Recoverable Oil.</p><p><strong>© Factors Governing FPSO Size:</strong></p><p>There are many crucial factors governing the size of an FPSO size. Few of the critical factors are detailed below.</p><p><strong>i)</strong> <strong>Estimation of Recoverable Oil:</strong></p><p>One of the major challenge/ risk in an offshore project is the estimation of the Recoverable Oil from the VOIP/ OIIP. The VOIP/ OIIP in a formation is estimated by carrying out an initial 2D seismic imaging survey and later confirmed by a 3D seismic imaging survey of the ocean floor. Specialised seismic survey vessels are used to carry out such surveys offshore. This is one of the major initial cost of the project.</p><p>The recoverable oil is then estimated based on the VOIP/ OIIP arrived at based on the above surveys. Normally recoverable oil is about 25% to 30% of VOIP/ OIIP as detailed earlier. Nowadays EOR or Enhanced Oil recovery methods are developed to increase the quantity of recoverable oil.</p><p><strong>ii)</strong> <strong>Offshore FPSO / offshore facility life span:</strong></p><p>Normally FPSO/ offshore facility life span varies anywhere from 5 years for marginal fields to even as high as 25/ 30 years for green fields.</p><p>As an example the US$ 10 Billion FSRU Prelude is designed for a life span of 25 years to operate in Prelude and Concerto <a href="https://en.wikipedia.org/wiki/Natural_gas_field">gas fields</a> in the <a href="https://en.wikipedia.org/wiki/Browse_LNG">Browse LNG</a> Basin,<a href="https://en.wikipedia.org/wiki/Prelude_FLNG#cite_note-offshore-9">[9]</a> 200 kilometres (120 miles) off the coast of Australia.</p><p><strong>iii)</strong> <strong>The geometry of the formation:</strong></p><p>The formation could be well spread over a significant area or locally spread in limited area but with higher depth etc. This governs the number of wells that can be drilled in the formation. More number of wells increase the CAPEX for the project. However, more wells might be required to increase the production rate to improve the Rate of Return (IRR) for the project</p><p><strong>iv)</strong> <strong>The project economics:</strong></p><p>The project is mainly driven by the CAPEX, Capital Expenditure and the OPEX, the Operational Expenditure.</p><p>CAPEX generally includes cost of initial seismic survey, drilling / well completion, subsea development cost including subsea pipe lines, manifolds, jumpers, SDU (subsea distribution units), PLEMS (pipe line end manifolds), PLETS (pipe line end termination), Riser base. In addition, the cost of FPSO, SURF (subsea, umbilical, risers, flow line), riser base, offloading hoses etc.)</p><p>OPEX includes crew/ office expenses (including salaries), transport/ hotel expenses in the vessel, consumables for topsides machinery (FO, LO, etc), spare and tools for machinery (topside and marine), chemicals for chemical injection, insurance, crew boat expense etc.</p><p>The challenge is how a balance could be struck between CAPEX and OPEX to minimise the overall project cost, during the entire life span of the project.</p><p>Few of the driving factors include:</p><p>1. Rate of crude/ gas processing (BOPD of oil and/ or mmscfd of gas)</p><p>2. Storage capacity of stabilised crude/ offspec crude available in the FPSO</p><p>3. Offloading vessel capacity</p><p>4. Frequency and number of offloading vessels available etc.</p><p>5. Distance to the offloading facility, speed of offloading tanker</p><p><em>Note:</em></p><p><em>BOPD: Barrels of oil per day/ mmscfd: Millions of standard cubic feet per day of gas/ Oil Equivalent of Gas: Approx. 5000 to 5500 cubic feet of gas considered equivalent to 1 barrel of oil (depends on the calorific value of the gas generally)</em></p><p><strong>(D) CAPEX to total Sales Ratio:</strong></p><p>Based on a preliminary desktop study of few FPSO projects since 2008, it is very interesting to note that a relation exist between the total CAPEX and cost of Recoverable Oil in the project. The projects are randomly picked for the study and the project locations includes Angola Offshore, Nigeria Offshore, Equatorial Guinea and Shetland UK. Refer to the Table 1.0 below.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/601/1*eHjfiAf9ngy0XWmjjM50uA.png" /></figure><p>Table 1: CAPEX to Total Sales Ratio</p><p>It is interesting to note that from the above Table 1, the Ratio of CAPEX to estimated Total Sales revenue (of stabilized crude) lies in the range of about 20% to 25%.</p><p><strong>(E) Name Plate Capacity of an FPSO</strong></p><p>The name plate capacity of an FPSO indicates the major functions with respect to processing of the Crude from the well.</p><p>A typical name plate capacity of an FPSO is as below. The explanation is provided in Italics:</p><p>Crude Oil Production: 80,000 BOPD</p><p><em>FPSO is capable of producing upto 80,000 barrels of stabilised crude oil per day max</em></p><p>Gas Production: 200 mmscfd</p><p><em>FPSO is capable of total gas production at rate of 200 million standard cubic feet of gas per day</em></p><p>Water Injection: 120,000 BWPD</p><p><em>FPSO is capable of carrying out water injection to the well at 120,000 barrels of water per day.</em></p><p>Produced Water: 90,000 BWPD</p><p><em>FPSO is capable of handling produced water at 90,000 barrels of water per day</em></p><p>Crude Storage : 1,700,000 bbls</p><p><em>FPSO is capable of storage of 1.70 million barrels of crude in the hull tanks. The FPSO also need a separate tank to carry Off spec crude (crude which does not meet the requirements) which does not meet the export specification of crude. Normally governed by Functional Specification of the FPSO and is generally 2 to 3% of max storage.</em></p><p><strong>(F) Components of an FPSO</strong></p><p>The literal meaning of the word FPSO as generally known , “Floating”, “Production”, “Storage” and “Offloading”.</p><p>Why “Floating”? As it is an Oil and Gas facility offshore.</p><p>Why “Production”? The crude in the raw form from the formation is highly unstable and unsuitable for transport and storage and hence need to be stabilised.</p><p>Why “Storage”? The crude from the formation, once stabilized in the topsides needs to be stored temporarily prior to export via shuttle tankers (offloading tanker) or exported to down stream piping system. Storage is critical to ensure that the produced crude meets the specific requirements making it suitable for export.</p><p>Why “Offloading”? The crude extracted from the formation is stabilised for storage and transport. The final product is either offloaded through shuttle tankers or through export pipe lines to the shore based down stream facility. The down stream facility mainly includes refining of crude to usable fuel like diesel, petrol, kerosene etc. The down stream facility is often very large and shore based for ease of supply to the consumers.</p><p>The Functional Specification of an FPSO contains the “Name Plate Capacity” as detailed below, highlighting the major production / utility features. The name plate capacity forms the major part of the FPSO specification.</p><p>v Oil handling capacity: 55,000 BOPD (Barrels of oils per day)</p><p>v Produced Water Treatment: 75,000 BWPD (Barrels of water per day)</p><p>v Water Injection Capacity: 85,000 BWPD (Barrels of water per day)</p><p>v Gas handling: 94 mmscfd (million standard cubic feet per day)</p><p>v Liquid handling: 120,000 BLPD (Barrels of liquid per day)</p><p>v Product Offloading: 5,000 cubic meter per hour</p><p>v Oil Storage Capacity: 500,000 barrels</p><p>v Gas compression: 101 mmscfd</p><p>v Power generation: 3 x 10 MW each (3 x 50%)</p><p>The major components of the FPSO are as below:</p><p>Ø Hull:</p><p>An FPSO hull can either be an existing tanker hull or newly build. The hull included the COT (Crude Oil Storage ) tanks, water ballast tanks, Off spec crude tanks, forepeak tanks etc. Generally towards the aft of the hull a machinery room is provided for new build FPSO and is an engine room for converted FPSO. The engine room aft houses the marine facility including bilge, ballast, firefighting system, Inert gas system etc.</p><p>Ø Topside:</p><p>The production facility in an FPSO is generally placed above the main deck of the vessel.</p><p>Why can’t the topside be placed directly on the main deck?</p><p>Safety wise FPSO is divided into Zones, from 0,1 and 2 (Refer ABS Rules). The crude storage tank is Zone 0. About 3.50m above main deck is considered Zone 1. Also a 3.50m radius ball around the air pipe of a tank is considered Zone 1. Zone 2 is zone further away from Zone 0 and Zone 1. Generally, all process facilities are provided in Zone 2 which is the safest. Electrical fixtures in Zone 1 are to comply with stringent requirements of safety like ATEX (explosive atmosphere) compliance and are to be explosion proof etc.</p><p>The topsides on board an FPSO is raised further above main deck greater than 3.50m to about 4.5m to 5.0m considering above safe zone requirements, in addition to structural beam depth of 800mm to 1000mm.</p><p>The topside include the process facility like Crude Oil Stabilisation, Gas compression, Produced water treatment, Gas treatment etc, and the Utilities which include water injection, chemical injection, power generation, E House (Electrical House), laydown module etc.</p><p>The break down of an FPSO topside facility is detailed below:</p><p>o <strong>CSU (Crude Stabilisation Unit)</strong></p><p>Crude Stabilisation Unit (CSU) separates oil, water, gas and sediments from crude. Mainly includes vessels such as Slug catcher, HP Separator, MP Separator, LP Separator etc in general. Inter stage heater/s and crude transfer pumps are provided in between these separators to condition the fluid prior to separation at each stage. Though vessels (HP/ MP/ LP separators) are generally single (without redundancy), the transfer pumps and inter stage heaters are generally provided with 2 x 100% redundancy to minimise production break down.</p><p>Another major component in a CSU is the electro static coalescer which is used to further remove oil from the water, post separation but using high voltage technique.</p><p>CSU module is also provided with a Produced Water Treatment package which treats the produced water after separation; for re injection to well or to discharge the same offshore.</p><p>A CSU module can weight about 700t to 1000 t depending on the size and types of the vessels in the module.</p><p>o <strong>Gas Compression</strong></p><p>The gas separated from crude can either be (i) used to power Gas Turbines for power generation in the FPSO or (ii) re injected to the well to maintain pre desired well pressure or (iii) exported to downstream piping system for export to onshore facility.</p><p>The gas compression module houses the Gas compressors. There could be LP compressor, MP compressor, HP compressor based on the pressure of gas required. Normally a sparring philosophy of 2 x 100% or 3 x 50% is adopted in an FPSO. However, a 3 x 50% is found to be of advantage to the FPSO as it can operate at higher varying range of loads with single or double compressor and third compressor as standby.</p><p>Two of the main component in the Gas Compression module is the scrubber/s and cooler. The scrubbers are used to “scrub out” or remove the left out moisture content in the gas. The cooler is generally provide after each stage of compression to cool down the compressed gas to pre required temperature. After each stage of compression the gas needs to be pressurised and cooled to suit the intake temperature and pressure of the next stage gas compressor.</p><p>The gas compression module generally is provided with a treatment facility. The gas treatment facility improves the gas quality with respect to moisture/ impurity content (CO2, H2S content) and maintains the required pressure for power generation and export to down stream facility. For re injection of gas to the well much of gas treatment might not be necessary but pressure needs to be maintained. In some case the gas treatment can be a part of the Gas compression module.</p><p>In FPSOs generally gas turbine generators or GTGs are used as the primary source of power generation. FPSO with higher gas production 60/80/120 mmscfd or higher, the gas is generally used to power the GTG. The produced gas needs to be treated to suit the GTG fuel requirement. The fuel quality including pressure, temperature, CO2, H2S content etc is managed through a Fuel Gas Conditioning package, forming part of the gas compression module.</p><p>o <strong>Flare tower</strong></p><p>Flare tower structure forms one of the major topside structure of an FPSO. It is used to flare the excess gas produced during separation/ crude stabilisation. This facility is required as part of the safety feature of the FPSO. Due to some reason if the gas produced cannot be exported or re injected, the same needs to be flared up as it cannot be stored in the facility.</p><p>The height of a flare tower can vary anywhere between 20 m , for FPSO with low gas production to as high as even 250 m, for FPSO with high gas production. The height of the flare tower is governed by the radiation ball during worst case flaring of the gas at the tip of the tower. Sufficient height is provided to ensure that the nearby hydrocarbon facilities (CSU, gas compression facility) as well as the ships main deck and the flare control below the tower is not adversely affected by the radiation/ heat. The allowable radiation to be maintained within limits as detailed in API. The flare radiation data is provided by the flare tip manufacturer but based on the worst case gas composition for continuous flaring, intermittent flaring and accidental flaring etc.</p><p>The flare tower has a flare tip, flare line (HP/LP lines) and a pilot gas pipe for flare ignition. The flare control panel is normally placed at the bottom of the main deck.</p><p>One of the critical factor to be considered is the electrical (cables, glands, lights etc) and instrumentation fittings as they need to be designed to withstand the high temperature due to flaring.</p><p>A flare tower weight (preliminary) can vary anywhere between 30/40 t for a 25m tower to 300 t for a 250m tower.</p><p>o <strong>Utility Modules</strong></p><p>The major Utility modules supporting the FPSO production includes (i) Chemical Injection Module (ii) Water Injection Module (iii) Power Generation Module cum Compressed air system (v) E House Module (vi) Pipe racks.</p><p><strong>Chemical Injection Module</strong></p><p>The chemical injection module is where various chemicals are mixed and a precise and accurate amount of chemicals is injected into a system with required back pressure either continuously or intermittently.</p><p>The chemical injection module has the lowest level (in line with the FPSO pancake above main deck) accommodating the chemical injection pumps (normally 2 x 100% ) for injecting the various types of chemicals. Normally different pumps are used to inject different chemical. The chemical totes (tanks) are stored on the second level and connected to the mixing tanks (separate tanks provided for the various chemicals) at the lower deck.</p><p>Chemical injection systems typically consist of multiple chemical services with associated single or multi-compartment storage tanks or pressure vessels. The chemicals are stored in tanks and transferred from the tank to the injection point by mean of chemical injection pumps, while flow rates can be adjusted locally or remotely in order to ensure that the correct amount of chemicals are injected.</p><p>The purpose of injecting the chemicals into a system is to protect the mechanical integrity of the system from (i) accelerated corrosion (ii) prevent scale formation (iii) control hydrate formation (iv) prevent oxygen induced corrosion (v) emulsion breaker for rapid and sharp separation of water from oil (vi) reduce wax formation (vii) water treatment (viii) Odorization (ix) form control etc.</p><p>The chemical injection is carried out to aid in CRUDE PRODUCTION by (a) wax inhibition in crude (b) asphalt inhibition in crude © scale inhibition in pipes (d) pour point depression. Chemical injection is also carried out as part of PRODUCED WATER TREATMENT (the water produced after separation of oil and gas from oil) to enable (a) corrosion inhibition (b) foam inhibition © demulsify and (d) biocides. Chemicals are also used for HYDRATE CONTROL such as (a) MEG Mono ethylene Glycol or (b) methanol etc.</p><p>Generally chemical injection modules are provided near laydown areas or even integrated with the laydown areas, as chemical tote (supply tank) handling is one of the major activity in the laydown area.</p><p><strong>Water Injection Module:</strong></p><p>A water injection facility is provided to inject water at pre-determined pressure into the formation/ well when the pressure reduces due to extraction of crude. The water used for injection could be treated water obtain during separation or sea water or a combination of both.</p><p>The water injection is carried out at about 80 bar to even as high as 250 bar in some cases. This is to maintain an optimum pressure in the well to maintain the crude oil arrival pressure to the FPSO facility.</p><p>The module mainly comprises of booster pump/s and HP Pumps. Prior to injection the water is passed through fine filter, coarse filter etc and then passed through a deaerator tower, for removal of oxygen and dissolved gas. With dissolved oxygen or gas in water, it might not be possible to attain the desired pressure at the HP pump outlet. Hence deaeration is a process generally considered in the water injection facility.</p><p>Further higher oxygen content in the water might increase the rate of corrosion in piping etc. Normally the oxygen content is retained less than 10 PPB (part per billion).</p><p>Normally for practical purpose 2 x 100% sparing is provided for both booster and HP pumps. Water injection can range anywhere from 20,000 BWPD (barrels of water per day). to even as highs as 85,000 BWPD.</p><p><strong>Laydown Module</strong></p><p>One of the major topside module on-board an FPSO is the laydown module. Laydown module is a raised deck in line with topside pancake (pancake level is the raised first deck above main deck of the topside). Normally this module is provided to store spares, tools, machinery components, chemical totes etc. required for the smooth functioning of the FPSO.</p><p>Normally this is recommended to be designed for a pressure of 15 kN/sq.m. unless higher pressure required by the Client.</p><p>In bigger FPSOs (VLCC converted) normally two laydowns are provided, one in the forward region near the process modules and one in the aft region near the utility modules. In many cases the laydown module at the aft is integrated with the chemical injection module.</p><p>A material handling way is arranged for handling materials from laydown areas all the way to the other modules from process modules in the forward to the utility modules at the aft. The width of the material handling way is normally about 2 to 3 meters and depends on the capacity of the material handling trolley used.</p><p>The laydown area is to be designed for wheel loading of the trolleys used for material handling. Also the laydown areas is to be designed for dropped object based on the heaviest load the crane is likely to carry during operation.</p><p>The laydown area is provided with heavy duty bumper rails all around and about 1.80 to 2.0 m height for safety reasons. The bumper hand rail to be designed for marginal shock loads envisaged due to handling of the loads by the crane.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=8733dd3890a7" width="1" height="1" alt="">]]></content:encoded>
        </item>
    </channel>
</rss>