<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0" xmlns:cc="http://cyber.law.harvard.edu/rss/creativeCommonsRssModule.html">
    <channel>
        <title><![CDATA[Stories by Harry Hunter (He/Him) on Medium]]></title>
        <description><![CDATA[Stories by Harry Hunter (He/Him) on Medium]]></description>
        <link>https://medium.com/@harryjan?source=rss-8b5f64b2463c------2</link>
        <image>
            <url>https://cdn-images-1.medium.com/fit/c/150/150/1*mi6gqrQf9rxs2IY1YgEPFQ@2x.jpeg</url>
            <title>Stories by Harry Hunter (He/Him) on Medium</title>
            <link>https://medium.com/@harryjan?source=rss-8b5f64b2463c------2</link>
        </image>
        <generator>Medium</generator>
        <lastBuildDate>Thu, 19 Nov 2026 04:26:33 GMT</lastBuildDate>
        <atom:link href="https://medium.com/@harryjan/feed" rel="self" type="application/rss+xml"/>
        <webMaster><![CDATA[yourfriends@medium.com]]></webMaster>
        <atom:link href="http://medium.superfeedr.com/" rel="hub"/>
        <item>
            <title><![CDATA[The Hydrogen Sonata]]></title>
            <link>https://medium.com/continuum-industries/the-hydrogen-sonata-74bf37d5af2?source=rss-8b5f64b2463c------2</link>
            <guid isPermaLink="false">https://medium.com/p/74bf37d5af2</guid>
            <category><![CDATA[infrastructure]]></category>
            <category><![CDATA[innovation]]></category>
            <category><![CDATA[oil]]></category>
            <category><![CDATA[ai]]></category>
            <category><![CDATA[hydrogen]]></category>
            <dc:creator><![CDATA[Harry Hunter (He/Him)]]></dc:creator>
            <pubDate>Wed, 02 Nov 2022 15:45:14 GMT</pubDate>
            <atom:updated>2022-11-25T10:31:02.614Z</atom:updated>
            <content:encoded><![CDATA[<h4>Converting Natural Gas networks to Hydrogen is core to achieving the UK&#39;s Carbon Net-Zero targets.</h4><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*wKFf_C-7_t_kqrDY9U1ZEg.png" /></figure><p>In 1858 ‘Colonel’ Edwin Drake became the first American to strike oil in the state of Pennsylvania, kicking off the most significant energy revolution in history and the start of the petrochemical age.</p><p>Growth went exponential as money, people and innovation flooded the new market; production grew to 450,000 barrels by 1860 and onwards to 3 million barrels by 1862. For the first time in history, broad swathes of humanity had true energy abundance as the price per barrel crashed from $10/barrel to $0.10/barrel over the same period, making lighting and heating oil affordable to most Americans.</p><p>Energy abundance spread to every corner of the globe over the subsequent decades as innovation and investments in infrastructure distributed what was considered a “miracle liquid” to cities and farms the world over. The first long-distance pipeline (110 miles) was built in Pennsylvania in 1879. By 1884, more than 10,000 miles of pipeline crisscrossed the United States and by 1907, it was said that oil pipelines had “a girdle around the world, twice over”.</p><p>Today, we live in a world dominated by both the progress enabled by this revolution and the increasingly deadly consequences of it. There is no question now that humanity must leave the petrochemical age behind for the sunny uplands of carbon net-zero energy production.</p><p>Humanity requires a new revolution to deliver energy abundance, we can no longer afford the petty squabbles over proven, safe technologies that can unquestionably replace the use of petrochemicals. Electrification and renewable power generation are undoubtedly at the core of this new age, but it will not be the silver bullet solution replacing every single carbon-emitting process on its own!</p><p>Delivering carbon net-zero energy abundance in time to respond to climate change will only be delivered by utilising all available technologies from wind and solar, to nuclear and hydrogen.</p><h3>Delivering Transformative Infrastructure</h3><p>Blue and green hydrogen technology brings the opportunity to slash the carbon emissions of use cases currently dominated by Natural Gas. From heating homes to industrial ammonia production, it can replace natural gas on a close and even like-for-like basis. But to achieve this in time we require an infrastructure revolution as dramatic as 1880s Pennsylvania.</p><p>23 million households in the UK currently use natural gas boilers for heating, supplied by 174,000 miles* of pipelines crisscrossing the country. Converting the whole residential network to hydrogen could bring a direct reduction in UK carbon emissions of 17%** by 2035 which would make up over 20% of the UK Government’s total global Net-Zero commitment.</p><p>Achieving this requires vast investments ranging from scaling blue and green hydrogen production to transforming the UK’s pipeline network, to adapting millions of boilers within our homes.</p><p>With an existing pipeline network seven times in length the circumference of Earth and 2030 climate goals on the horizon, the UK must innovate and invest in new ways of working to radically accelerate the conversion of existing and the development of new pipelines.</p><p>Whilst much of the ‘bare metal’ of existing pipelines is planned to be retained, converting from natural gas to hydrogen will require new technologies to pump, monitor and deliver hydrogen safely at scale. From planning permission to environmental assessment, to operational regulation developers, operators and regulators will have to collaborate closely to help deliver the UK’s 2030 climate objectives.</p><h4>Remote First Analysis</h4><p>With 174,000 miles of existing pipelines to understand and prioritise for conversion developers, operators and regulators must make better use of remote data collection and analysis.</p><p>Using modern technology and data-sets desk studies can provide far more value than is traditionally assumed. Improvements such as integrating data sets such as the National Underground Asset Register (NUAR) or using LIDAR carrying drones to review existing routes could radically improve delivery teams&#39; productivity.</p><p>Investments should be made in collaborative platforms to improve communication between developers, operators and regulators including secure access to real-time data and analysis. Decision makers will be under the dual pressures of the need for speed whilst assuming accountability for decisions within a fractious planning permission process; correctly used collaborative technology is the gold bullet for giving them the confidence in making the right decisions for the long term.</p><h4>Iterative Data, Iterative Learning</h4><p>With such a large challenge ahead, it will be impossible to have all the data collected, available and analysed before decisions are made. Developers, operators and regulators will need to take an iterative approach, being comfortable with ambiguity and change as validated data gradually becomes available.</p><p>Following data and information management best practices will be critical for success, including using secure centralised data infrastructure operated by qualified staff. Whilst a data schema covering such a large asset base is almost unimaginably large, technologies such as machine learning are available and in use across the construction sector. These could generate insights and actions to support the delivery teams remaining on time and within budget.</p><h4>Multiple paths, multiple opportunities</h4><p>With much of the UK’s natural gas infrastructure first developed between 1960 and 1980, asset operators need to understand how their ageing pipelines would integrate into a new hydrogen model. Will every pipeline still be required? Which should be prioritised? How has the customer base changed since an existing asset was developed?</p><p>Developers and asset owners should view the existing network as their base case for conversion, but also consider how new technologies and new routes could improve the capacity or operational performance of the new network. Technology now exists for swift side-by-side analysis of existing routes and new opportunities to identify better outcomes at a lower cost.</p><p>In the current political climate of frequent legal challenges, such consideration and documentation of alternative options will provide regulators with assurance in the quality of submitted plans and public stakeholders with satisfaction in the technical elements when faced side-by-side with documented alternatives.</p><h3>Radical change, Professionally delivered</h3><p>Whilst increasingly under pressure, the oil industry improved the quality of life of hundreds of millions of people globally through affordable lighting, heating and eventually transportation. The story of its rapid growth whilst undoubtedly the cause of significant environmental and climatic issues is also one of vision, innovation and investment.</p><p>To respond to the climate emergency, humanity needs to recapture this spirit, imagine a world of clean energy abundance and set our goals, not on the basis of marginal change to an existing system, but radical change delivered at the cadence of our forebears who challenged their teams to transform the world within their lifetimes.</p><p>We have the vision, the technology and the people.</p><p>Let&#39;s make it happen.</p><p><em>About Continuum Industries</em></p><p><em>Continuum Industries is a provider of an AI-powered infrastructure development platform, Optioneer, that enables power, utility and renewables companies to instantly visualise, analyse and comprehensively assess routing options for power lines, cables and pipelines.</em></p><p><em>By incorporating all environmental constraints into the development process from the very beginning and considering them together with social, engineering and cost criteria, Optioneer bridges the gap between existing routing procedures and the pace at which project development needs to happen to meet Net Zero targets.</em></p><p><em>Sources:</em><br>*<a href="https://www.sciencedirect.com/science/article/pii/S0301421513003625">https://www.sciencedirect.com/science/article/pii/S0301421513003625</a></p><p>**<a href="https://publications.parliament.uk/pa/cm5802/cmselect/cmbeis/1038/report.html">https://publications.parliament.uk/pa/cm5802/cmselect/cmbeis/1038/report.html</a></p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=74bf37d5af2" width="1" height="1" alt=""><hr><p><a href="https://medium.com/continuum-industries/the-hydrogen-sonata-74bf37d5af2">The Hydrogen Sonata</a> was originally published in <a href="https://medium.com/continuum-industries">Continuum Industries</a> on Medium, where people are continuing the conversation by highlighting and responding to this story.</p>]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Recommendations for regulators]]></title>
            <link>https://medium.com/continuum-industries/recommendations-for-regulators-ed613f657d08?source=rss-8b5f64b2463c------2</link>
            <guid isPermaLink="false">https://medium.com/p/ed613f657d08</guid>
            <category><![CDATA[open-source]]></category>
            <category><![CDATA[regulation]]></category>
            <category><![CDATA[data-science]]></category>
            <category><![CDATA[construction]]></category>
            <category><![CDATA[government]]></category>
            <dc:creator><![CDATA[Harry Hunter (He/Him)]]></dc:creator>
            <pubDate>Wed, 26 Oct 2022 13:57:27 GMT</pubDate>
            <atom:updated>2022-10-26T13:57:27.243Z</atom:updated>
            <content:encoded><![CDATA[<h3>Lessons from the Pandemic: Recommendations for regulators</h3><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*Pl0ngASx2X3bpy1oG1SJAA.jpeg" /></figure><p>Traditional drug development is excruciatingly slow. From 2010–2020 the average time from the first submission to regulator sign-off was over 9 years, and that’s after potentially decades of R&amp;D to deliver the drug candidate. Yet in response to COVID-19 the pharmaceutical industry, their regulators and governments around the world overcame decades of status quo processes to deliver highly effective vaccines within a single year.</p><p>In a society crying out for new infrastructure solutions responding to energy security, climate change and shifting demographics we must learn from this harrowing experience to accelerate the design and delivery of critical infrastructure projects.</p><p>Across this series we’ve outlined key lessons learnt from the development of the COVID-19 vaccines:</p><p>How multiple drug candidates were developed concurrently enabling teams to learn from each other and optimize their processes far faster than ever before in <a href="https://medium.com/continuum-industries/lessons-from-the-pandemic-multiple-paths-multiple-opportunities-c58e165c0347">‘Multiple paths, multiple opportunities</a>’.</p><p>How in the midst of a global pandemic, the largest clinical trial in history took place facilitated by remote working and high levels of trust between teams spread across the globe in <a href="https://medium.com/continuum-industries/lessons-from-the-pandemic-remote-first-trials-8cd690e9dbf0">‘Remote first trials’</a>.</p><p>And how regulators radically sped up how they accepted and validated clinical trial results by taking a data-first approach, learning to collaborate with clinical teams in real-time as new data was generated and insights discovered in <a href="https://medium.com/continuum-industries/lessons-from-the-pandemic-iterative-data-iterative-learning-793630cf2482">‘Iterative Data, Iterative Learning’</a>.</p><h3>Recommendations for regulators</h3><p>In this final piece, we’ll take a step back and consider how regulators could get started in learning from the COVID-19 story and adapting the lessons learnt to the built environment.</p><p>These policies and capabilities are not mutually exclusive but would make great initial steps if you&#39;re just starting your journey into data-driven decision-making. These are not new ideas! From the UK Environment Agency to the US Federal Digital Service, regulators have an incredible history of innovation which you can learn from.</p><p>Read on to discover three top policies you’ll need to get started in Data-Driven Decision-Making in the built environment and three core capabilities you’ll need to deliver them.</p><h3>Policies</h3><h4>A. Open by default</h4><p>The key to successful data-driven decision-making is trust. Trust in the data, trust in the processing of that data and trust in the interpretation of that data.</p><p>Whilst there are no shortcuts to creating trust between stakeholders, especially in a subject as diverse as infrastructure, building a culture of decision-making in the open is a great way to start.</p><p>From early outreach to stakeholders on forthcoming changes, to external blogs on core technology and policy decisions, a significant amount of goodwill can be gained by ‘saying what you’ll do, then doing what you say’.</p><p>As your data-driven decision-making matures, ‘openness’ will take on a new meaning. This could include publishing your data schema, the source code used to interpret the data or up-to-date statistics on trends over time.</p><p>Teams who assume the light of public interest is always shining on them will make better decisions and build a stronger communications culture in articulating the why, what and how of decisions which might affect thousands of people in the real world.</p><h4>B. Enabling data iteration</h4><p>Rapid iteration is at the core of data-driven decision-making generally, and the COVID-19 response specifically.</p><p>Building the systems is the easy part, building the culture is far harder. Traditionally, admitting a finding or a data point was wrong was seen as a failure much like a parent&#39;s response to their child receiving a C grade whilst expecting an A* in a maths exam.</p><p>People and processes must become capable and comfortable with accepting and considering new data as it becomes available. At the most extreme you might like them to celebrate when old data is found to be inaccurate as a harbinger of a better decision than otherwise would have been made.</p><p>This is a simple concept, yet dastardly difficult to implement, driven perhaps by the memory most of us have as pink-faced 11-year-olds fearful of parental response to a poor grade.</p><h4>C. Submitting multiple concepts</h4><p>COVID-19 was effectively vanquished for the majority by competition between vaccine candidates to quickly identify the most effective, safest and economical candidate.</p><p>The construction industry can deliver similarly radical outcomes by facilitating and enabling the submission of multiple concepts simultaneously. Shifting the debate from binary to bi-model could radically transform stakeholder engagement as decisions move from a simple yes/no on a proposal to inclusive debates on the strengths and weaknesses across multiple concepts.</p><p>As new data is collected and assumptions proved or disproved competition will drive decision-making towards the best solution, learning from each other to iteratively improve with the active input of all stakeholders.</p><h3>Capabilities</h3><h4>A. Accepting, validating and storing your data</h4><p>With your decision-making becoming more data-centric you’ll need the data infrastructure to accept, validate and ultimately store the order of magnitude increase in data tumbling down virtual pipes, spigots and reservoirs.</p><p>But before your CFO has a mild meltdown at the size of the consultancy invoice, you can start small and simple. Software as a Service (SaaS) solutions now support a broad range of construction use cases, from concept designs to environmental assessment to public engagement. Such solutions are inherently scalable and bring with them best-practice talent from hundreds of past projects.</p><p>Above all; keep it simple. Avoid restricting yourself to the detail of an in-house process, but rather adapt to the best practice vendors in the market bring with them. Whilst custom software development projects can bring the satisfaction of seeing your end-to-end vision captured in a tangible form, they also bring significant financial, cyber-security and reputational risks compared to buying off-the-shelf solutions.</p><h4>B. Visualising and benchmarking your data</h4><p>Once you have a steady stream of data spilling down your pipes from early adopting partners, visualisation becomes the priority. Again, with off-the-shelf technology consider simplicity above all else. SaaS solutions which include both data management and visualisation tools are increasingly commonplace; creating secure, scalable and user-friendly working environments to deep dive into your data.</p><p>Whichever solution you choose, follow the best data governance practice of ensuring you have ongoing ownership of your data with direct access to export it on your terms, even better selecting products which support secure sharing by default enabling collaboration from day one.</p><p>Benchmarking is an inherently political act, which datasets to include or exclude, their relative weighting and choice of time series are all innately policy questions over technological. Share your policies and examples early and often with early adopter partners and other regulatory bodies with a vested interest, and work in the open wherever practical.</p><h4>C. Publishing your data schema</h4><p>You have your data in hand, a logical structure has been produced and the key metrics have been decided and benchmarked, so what’s next?</p><p>To build broad trust in data-driven decision making it&#39;s critical to publish the basis of those decisions: the data schema.</p><p>There is a risk here. For every stakeholder who gains from a decision, there will be those who lose and a published schema will provide ammunition to challenge. Yet without publishing the schema your decision-making process will remain a black box, open to challenge and misinterpretation. Transparency of decision-making requires transparency of the decision-making mechanism.</p><p><em>About Continuum Industries</em></p><p><em>Continuum Industries is a provider of an AI-powered infrastructure development platform, Optioneer, that enables power, utility and renewables companies to instantly visualise, analyse and comprehensively assess routing options for power lines, cables and pipelines.</em></p><p><em>By incorporating all environmental constraints into the development process from the very beginning and considering them together with social, engineering and cost criteria, Optioneer bridges the gap between existing routing procedures and the pace at which project development needs to happen to meet Net Zero targets.</em></p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=ed613f657d08" width="1" height="1" alt=""><hr><p><a href="https://medium.com/continuum-industries/recommendations-for-regulators-ed613f657d08">Recommendations for regulators</a> was originally published in <a href="https://medium.com/continuum-industries">Continuum Industries</a> on Medium, where people are continuing the conversation by highlighting and responding to this story.</p>]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Lessons from the Pandemic: Iterative Data, Iterative Learning]]></title>
            <link>https://medium.com/continuum-industries/lessons-from-the-pandemic-iterative-data-iterative-learning-793630cf2482?source=rss-8b5f64b2463c------2</link>
            <guid isPermaLink="false">https://medium.com/p/793630cf2482</guid>
            <category><![CDATA[data]]></category>
            <category><![CDATA[decision-making]]></category>
            <category><![CDATA[infrastructure]]></category>
            <category><![CDATA[climate-change]]></category>
            <category><![CDATA[energy-transition]]></category>
            <dc:creator><![CDATA[Harry Hunter (He/Him)]]></dc:creator>
            <pubDate>Fri, 07 Oct 2022 12:49:17 GMT</pubDate>
            <atom:updated>2022-10-11T09:56:32.861Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*AnG6D7KZms8bEBmSq4rI0w.jpeg" /></figure><p>Traditional drug development is excruciatingly slow. From 2010–2020 the average time from the first submission to regulator sign-off was over 9 years, and that’s after potentially decades of R&amp;D to deliver the drug candidate. Yet in response to COVID-19 the pharmaceutical industry, their regulators and governments around the world overcame decades of status quo processes to deliver highly effective vaccines within a single year.</p><p>In a society crying out for new infrastructure solutions responding to energy security, climate change and shifting demographics we must learn from this harrowing experience to accelerate the design and delivery of critical infrastructure projects.</p><h4>Status Quo</h4><p>Data-fuelled documentation is at the core of pharmaceutical regulation, the design, delivery and results of clinical trials deriving terabytes of insights on the effectiveness or ineffectiveness of prospective drugs and vaccines.</p><p>In recent decades the quantity of data captured from each trial has increased exponentially, yet how that data is used, shared and considered had barely changed from the days of hand-typed reports and set square-drawn diagrams.</p><p>Typically regulators only received a tiny proportion of the data collected at set milestones, the value hidden behind vacuous report writing. The model increased both costs of clinical trial operations and slowed the decision-making as trials were forced into a stop/start pattern based on the formulation and consideration of documentation.</p><p>This may have made sense in a pre-digital world of physical delivery and face-to-face debate but in a Digital-first approach, it was not.</p><h4>Iterative Data</h4><p>The pandemic showed the inadequacies of the process, both in terms of the physical limitations of participants being restricted to their own homes and the recognition that such bound processes restricted the pace at which decisions could be made. Vaccine innovators needed to respond far faster than ever before and the regulators recognised new ways of working were needed.</p><p><em>“To do this we implemented rolling data submission to the regulators — we would submit data over time, and be able to amend it over time. This required sophisticated planning in setting up the trial, and designing an operational plan”</em></p><p><em>Nuala Murphy, Pfizer, Leading Clinical Trials in the UK</em></p><p>Rather than prose-loaded qualitative reports delivered as PDFs, the pharmaceutical teams collaborated with regulators to provide a constant stream of data insights from the trials and accepted back feedback in almost real-time enabling clinical studies to pivot or re-focus where necessary to deliver the outcomes required.</p><p>Regulators&#39; culture changed from being passive managers of a process to true collaborators with the teams delivering clinical trials, incentives absolutely aligned to deliver a safe, high-quality vaccine as soon as possible.</p><h4>Iterative Opportunity</h4><p>The infrastructure sector could equally learn from this experience, rather than Environmental Impact Assessments (EIAs) delivered on paper by the crate load, an alternative would be to agree on the minimum viable dataset required to provide the assurance needed to proceed. Scheme proposers, industry and regulators would work collaboratively to accept, validate and feedback on data collected in almost real-time, dramatically accelerating decision-making and delivery of critical schemes.</p><p>Shifting from qualitative assessment of PDF submissions to quantitative assessment of iteratively improving data would make technical decisions both easier to make and defend from a challenge, driving constructive feedback from proposal stakeholders over adversarial opinion making. When presented effectively, this data-driven approach would enable improved communication between stakeholders, shifting arguments from emotive personal attacks to far more productive challenges on the quality and validity of data collected, hence supporting the delivery team in planning the next iteration of data collection and analysis.</p><p>Similarly in the design phase, the industry has often been unwilling to present ‘unfinished’ data and design deliverables, leaving reviews and feedback for pre-scheduled prestige events and milestones often months past the creation of the data or design in question. Taking a more agile and iterative approach, industry and regulators could become far more collaborative, far earlier in the delivery process with feedback provided to delivery teams in days or even hours. BIM, the core technology that enables this has been available off the shelf for more than 20 years, yet many infrastructure projects&#39; approach to regulatory engagement remain not far from the days of drafting tables and set squares.</p><p>Across the western world, governments have a new urgency in their requirements to respond to climate change, energy security and shifting demographics. Time has become a luxury that for the most urgent projects is now in short supply. By following a more collaborative, iterative and data-driven approach between scheme proposers, industry and regulators, we would dramatically speed up delivery, improve quality and better manage costs. What are we waiting for?</p><p><em>About Continuum Industries</em></p><p><em>Continuum Industries is a provider of an AI-powered infrastructure development platform, Optioneer, that enables power, utility and renewables companies to instantly visualise, analyse and comprehensively assess routing options for power lines, cables and pipelines.</em></p><p><em>By incorporating all environmental constraints into the development process from the very beginning and considering them together with social, engineering and cost criteria, Optioneer bridges the gap between existing routing procedures and the pace at which project development needs to happen to meet Net Zero targets.</em></p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=793630cf2482" width="1" height="1" alt=""><hr><p><a href="https://medium.com/continuum-industries/lessons-from-the-pandemic-iterative-data-iterative-learning-793630cf2482">Lessons from the Pandemic: Iterative Data, Iterative Learning</a> was originally published in <a href="https://medium.com/continuum-industries">Continuum Industries</a> on Medium, where people are continuing the conversation by highlighting and responding to this story.</p>]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Lessons from the Pandemic: Remote first trials]]></title>
            <link>https://medium.com/continuum-industries/lessons-from-the-pandemic-remote-first-trials-8cd690e9dbf0?source=rss-8b5f64b2463c------2</link>
            <guid isPermaLink="false">https://medium.com/p/8cd690e9dbf0</guid>
            <category><![CDATA[disruption]]></category>
            <category><![CDATA[planning]]></category>
            <category><![CDATA[ai]]></category>
            <category><![CDATA[transformation]]></category>
            <category><![CDATA[infrastructure]]></category>
            <dc:creator><![CDATA[Harry Hunter (He/Him)]]></dc:creator>
            <pubDate>Tue, 20 Sep 2022 13:00:14 GMT</pubDate>
            <atom:updated>2022-09-21T09:34:04.819Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*_F-PObIrIS8BVdzTcOIIeg.png" /></figure><p>Traditional drug development is excruciatingly slow. From 2010–2020 the average time from the first submission to regulator sign-off was over 9 years, and that’s after potentially decades of R&amp;D to deliver the drug candidate. Yet in response to COVID-19 the pharmaceutical industry, their regulators and governments around the world overcame decades of status quo process to deliver highly effective vaccines within a single year.</p><p>In a society crying out for new infrastructure solutions responding to energy security, climate change and shifting demographics we must learn from this harrowing experience to accelerate the design and delivery of critical infrastructure projects.</p><h4>The Status Quo</h4><p>The past 50 years of pharmaceutical development have been defined by the tug and pull of innovation vs safety. The greater the opportunity, the greater the risk, and risk in healthcare is not merely about profit and loss.</p><p>Clinical trials are the primary risk management tool in drug development, carefully testing drug candidates with a broad range of participants to understand effectiveness and side effects. Traditionally oversight and governance had to be local to trial participants, with trial locations minimised to manage costs whilst achieving the level of data collection regulators required.</p><p>As a consequence of this, it was often difficult to collect such data of sufficient sample size and participant diversity (e.g different ethnicities or pre-existing conditions) to satisfy regulatory requirements causing delays and increased costs as trials were re-run. These challenges have often delayed the approval of life-saving drugs such as HIV vaccines for decades.</p><h4>Remote first trials</h4><p>With the onslaught of COVID-19 governments didn’t have decades to wait, and a global pandemic required a global response.</p><p>Rather than working in isolation with limited clinical trial sites the pharmaceutical industry and its regulators developed a model of collaboration with local hospitals in regions across the globe whilst ensuring consistency and safety through remote services for the first time. A centralised management and governance team working primarily from Japan, coordinating 43,000 trial participants across over 100 sites spread from Birmingham to Bangalore.</p><p>A common technology platform across all trials enabled consistent data collection and risk management wherever participants lived with best practices shared across the network of trial sites as quickly as the most viral internet memes.</p><p>Whilst in the past this would have been considered an unnecessary luxury the sector has learnt that once the centralised services to coordinate and ensure the safety of such trials are set up, it is only marginally more expensive to operate trials in 100 locations as it were for 10, achieving scale never before seen across the industry. The model has demonstrated the industry can deliver radical innovation and improve safety simultaneously it&#39;s not an either-or choice.</p><h4>Remote first delivery</h4><blockquote>“The world is Flat” — Milton Friedman</blockquote><p>Many sectors including infrastructure could learn from the pharmaceutical industry&#39;s experience to radically improve the speed and quality of their service delivery.</p><p>Across the infrastructure sector, the closing of offices during COVID-19 has led to a radical reshaping of the workplace. Within a leading UK engineering consultancy pre-COVID, 55% of projects were staffed only by professionals working within 100 miles of each other, and Post-COVID, 70% of projects are staffed by professionals working within 3,000 miles of each other.</p><p>Excluding projects relating to National Security, professional services in the Infrastructure sector are re-orienting to a model where clients can access talent globally rather than just those available in the local office. Whilst many international professional services firms have claimed for decades that their global reach is a differentiator, in the 2020s for the first time this is actually true.</p><p>Regulatory processes and the gauntlet of planning permission have an even larger opportunity to re-imagine how they operate. Pre-COVID, local engagement and planning consultations were almost always face-to-face. This often led to limited engagement with the public as only those able (physically or due to time constraints) to arrive at a town hall meeting room on a certain date/time would have the opportunity to state their views.</p><p>If you limit the opportunity for engagement with the planning processes it is not unexpected that only those with the most forthright views expend the effort to air them. Taking a remote-first approach to planning permission will enable a far greater diversity of voices to be heard and viewpoints to be considered. It will introduce a new range of challenges however such as requiring new technologies and skillsets to present schemes digitally and facilitate public engagement with sufficient confidence to capture the diversity of opinion.</p><p>In the UK such proactive and professional ways of working will only become more important if and when ‘Street Votes’ as proposed by the current government is introduced. In practical terms, by encouraging or even requiring input from all residents of the area in question, current ways of working will not be suitable for effective communication, facilitation and consideration of such a diversity of views. Only a remote-first approach would have the scalability and flexibility required to respond to the increasing volume of consultations as the UK government responds to the challenges of climate change, energy security and shifting demographics.</p><p><em>About Continuum Industries</em></p><p><em>Continuum Industries is a provider of an AI-powered infrastructure development platform, Optioneer, that enables power, utility and renewables companies to instantly visualise, analyse and comprehensively assess routing options for power lines, cables and pipelines.</em></p><p><em>By incorporating all environmental constraints into the development process from the very beginning and considering them together with social, engineering and cost criteria, Optioneer bridges the gap between existing routing procedures and the pace at which project development needs to happen to meet Net Zero targets.</em></p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=8cd690e9dbf0" width="1" height="1" alt=""><hr><p><a href="https://medium.com/continuum-industries/lessons-from-the-pandemic-remote-first-trials-8cd690e9dbf0">Lessons from the Pandemic: Remote first trials</a> was originally published in <a href="https://medium.com/continuum-industries">Continuum Industries</a> on Medium, where people are continuing the conversation by highlighting and responding to this story.</p>]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Lessons from the Pandemic: Multiple paths, multiple opportunities]]></title>
            <link>https://medium.com/continuum-industries/lessons-from-the-pandemic-multiple-paths-multiple-opportunities-c58e165c0347?source=rss-8b5f64b2463c------2</link>
            <guid isPermaLink="false">https://medium.com/p/c58e165c0347</guid>
            <category><![CDATA[machine-learning]]></category>
            <category><![CDATA[energy]]></category>
            <category><![CDATA[infrastructure]]></category>
            <dc:creator><![CDATA[Harry Hunter (He/Him)]]></dc:creator>
            <pubDate>Tue, 13 Sep 2022 06:29:52 GMT</pubDate>
            <atom:updated>2022-09-16T17:46:15.724Z</atom:updated>
            <content:encoded><![CDATA[<p><em>Increasing competition during the design phase will help deliver infrastructure on time and on budget</em></p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*iPTNzSGGi4BedTvLqNFNjg.jpeg" /></figure><p><em>“In the midst of every crisis, lies great opportunity” </em>Albert Einstein once said and our response to COVID-19 proved just that.</p><p>Traditional drug development is excruciatingly slow. From 2010–2020 the average time from the first submission to regulator sign-off was over 9 years, and that’s after potentially decades of R&amp;D to deliver the drug candidate. Yet in response to COVID-19 the pharmaceutical industry, their regulators and governments around the world overcame decades of status quo process to deliver highly effective vaccines within a single year.</p><p>In a society crying out for new infrastructure solutions to energy security, climate change and shifting demographics, we must learn from this harrowing experience to accelerate the design and delivery of critical infrastructure projects.</p><h4>Status quo</h4><p>The pharmaceutical industry has been under increasing demand for new solutions and ever more stringent scrutiny from its regulators. Between 2000 and 2005 the US Federal Drugs Agency (FDA) approved on average 20 new drugs/year, a decade later the average was 50 drugs/year, whilst the average time for approval rose to over 9 years.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*Z0O9v-kJ3PPJV2VM4iwOtQ.png" /><figcaption>Source: ‘Clinical trial cycle times continue to increase despite industry efforts’, Nature, February 2017</figcaption></figure><p>Over time the regulatory process had become increasingly strenuous; requiring more complex studies ever to receive sign-off. This drove pharmaceutical firms to delay clinical trials to manage costs, only starting submission once they were absolutely sure of the technical feasibility of each candidate. Such due diligence took lots of time. Time which no one could afford during the outbreak of the COVID-19 pandemic.</p><h4>Snakes and ladders</h4><p>Within the onset of COVID-19, the pharmaceutical industry and its regulators threw out the proverbial book to adopt a far more iterative and collaborative approach. Gone were the long delays between R&amp;D and regulatory submission, gone were concerns of duplication between drug candidates and gone were the delays in collaboration sharing data.</p><p>Rather than a single candidate carefully managed through the regulatory gauntlet, multiple options were submitted for consideration in parallel. This enabled rapid iteration of the drug candidates and the operations of the clinical trials. The success or failure of one candidate supported the delivery of the others, and best practices of working in the midst of a pandemic rapidly percolated throughout the entire programme.</p><p>In the world of the status quo, this approach would have been argued to be ‘too expensive’, and to be fair during the pandemic budgets were abundant. Regardless, a key learning was that much of the clinical infrastructure for the trials was a fixed cost, and that multiple candidates could be reviewed side-by-side for only a marginally higher expense than reviewing one.</p><p>Once the benefits from learning and iteration between the candidates were taken into consideration it is likely this approach was actually cheaper than the traditional ways of working. Staff and infrastructure deployed in this way are needed for far less time overall compared to the traditional approach.</p><p>We stand today in 2022 in a new world relatively free of COVID-19 because we were willing to invest up-front in understanding all possibilities and let them battle it out to find the best candidate based on data and outcomes, not guesswork and assumptions.</p><h4>Pipes and pylons</h4><p>The infrastructure sector&#39;s traditional approach to regulatory sign-offs is similarly tied to the early selection of a single proposal at the concept stage. The costs to deliver a concept to the level of detail required by regulators are substantial, so until now it has made economic sense to only invest such effort in a single option.</p><p>Yet given the generational challenge of responding to climate change, energy security and demographic shifts, we no longer have the luxury of time to allow critical projects to be delayed in court for interminable years. If no other options are considered in detail is it a surprise that legal challenges to infrastructure projects have become business-as-usual and that proposals often become ‘all or nothing’ attempts to force a design through the system before the funding runs out.</p><p>Unfortunately, this has often spilled into adversarial relationships between the proposer and the regulatory process. Better to hold the line that the proposal represents the only viable option than to be forced into re-working the completed technical analysis.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*ClOWb2EVWvhgflrlEPr6Zg.png" /></figure><p>Without being offered viable alternatives; the regulatory and public decision is purely binary. There is little room for collaboration and compromise because no other options are on the table. Without demonstrating other options have been considered, how can a regulator be sure that the pros and cons of the proposal outweigh those of alternatives?</p><h4>Rapid Optioneering</h4><p>What if infrastructure developers and regulators had the processes, technology and culture to understand and critique multiple proposals in parallel?</p><p>Technology such as Continuum Industries’ Optioneer exists today to achieve just that. Infrastructure clients and their regulators can investigate multiple options at the level of detail required for regulatory consideration within similar budgets to what they’d have spent on a singular option study in the past.</p><p>Developers can showcase to their stakeholders not just a spreadsheet of assumptions but full models of different options, their costs and compromises to communicate and reassure that projects won’t be held up in court or on the tarmac.</p><h4>From COVID to Climate change</h4><p>The past three years have taught the pharmaceutical industry that the technology to disrupt the status quo and deliver critical drugs at a pace once thought impossible was already in front of them.</p><p>Now it’s the infrastructure sector&#39;s turn to challenge their status quo and start looking at the options in front of them to deliver real solutions to climate change, energy security and demographic shift to the timescales and budgets required.</p><p>This crisis really is the infrastructure&#39;s opportunity to change its ways of working, let&#39;s not waste it.</p><p><em>About Continuum Industries</em></p><p><em>Continuum Industries is a provider of an AI-powered infrastructure development platform, Optioneer, that enables power, utility and renewables companies to instantly visualise, analyse and comprehensively assess routing options for power lines, cables and pipelines.</em></p><p><em>By incorporating all environmental constraints into the development process from the very beginning and considering them together with social, engineering and cost criteria, Optioneer bridges the gap between existing routing procedures and the pace at which project development needs to happen to meet Net Zero targets.</em></p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=c58e165c0347" width="1" height="1" alt=""><hr><p><a href="https://medium.com/continuum-industries/lessons-from-the-pandemic-multiple-paths-multiple-opportunities-c58e165c0347">Lessons from the Pandemic: Multiple paths, multiple opportunities</a> was originally published in <a href="https://medium.com/continuum-industries">Continuum Industries</a> on Medium, where people are continuing the conversation by highlighting and responding to this story.</p>]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Lessons from the Pandemic: How to deliver Infrastructures Carbon Net-Zero future]]></title>
            <link>https://medium.com/continuum-industries/lessons-from-the-pandemic-how-to-deliver-infrastructures-carbon-net-zero-future-b70dc832b642?source=rss-8b5f64b2463c------2</link>
            <guid isPermaLink="false">https://medium.com/p/b70dc832b642</guid>
            <category><![CDATA[infrastructure]]></category>
            <category><![CDATA[covid19]]></category>
            <category><![CDATA[innovation]]></category>
            <category><![CDATA[construction]]></category>
            <category><![CDATA[planning]]></category>
            <dc:creator><![CDATA[Harry Hunter (He/Him)]]></dc:creator>
            <pubDate>Fri, 10 Jun 2022 09:56:12 GMT</pubDate>
            <atom:updated>2022-09-06T09:24:23.434Z</atom:updated>
            <content:encoded><![CDATA[<h3>Lessons from the Pandemic: How to deliver Infrastructure&#39;s Carbon Net-Zero future</h3><p><em>COVID-19 Vaccines were delivered 10x faster than the historical average, what lessons can infrastructure take from their success?</em></p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*8gsH3vgoZBoSw51gbl8WDQ.png" /></figure><p>March 2020; Borders held open in peace for generations close, social life of a week past now a criminal offence, human suffering unknown at such scale since the second world war the norm of the nightly news. Yet barely nine months later the sword of Damocles is turned by a shield so effective that we sit in spring 2022 in a world changed by its experience yet largely returned to a pre-pandemic norm.</p><p>The story of the COVID-19 vaccine development will be retold in untold history books, but all the scientists in the world would have been for nought without the change in approach by their regulatory institutions. In the face of an unprecedented pandemic, the old rule books, cultures and relationships were thrown aside, to be replaced by a new approach fueled by data, collaboration and continuous assessment.</p><p>Whilst the pandemic is hopefully behind us, both Russia’s war in Ukraine and the curling wave of climate change require equally fundamental changes in our regulatory institutions to deliver the infrastructure society needs to respond and adapt. Quintupling the worlds wind power capacity by 2030, or migrating Europe’s energy supply to geo-political alternatives by 2024 will only be delivered by tearing up old ways of working</p><h3>Business as usual no more</h3><p>To understand how remarkable the regulatory journey of the COVID-19 vaccines was, you must understand the pharmaceutical industries business as usual.</p><p>In the period 2013–2015, the median time for regulatory sign-off of a new drug was over 9 years! Proving that a prospective new drug achieves its intended outcome and is sufficiently safe for society&#39;s use is incredibly hard, understandably so.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*Z0O9v-kJ3PPJV2VM4iwOtQ.png" /><figcaption><em>Source: ‘Clinical trial cycle times continue to increase despite industry efforts’, Nature, February 2017</em></figcaption></figure><p>So it is remarkable that when faced with the single largest medical crisis the world has seen since the Spanish flu of 1917, the pharmaceutical industry and its regulators were able to tear up the old rule book to deliver an effective and safe new drug in just 9 months, 90% faster than the industries median time for regulatory sign-off.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*iCMcH0ZNBKOsEzIzK2tcdA.png" /></figure><p>The scale and pace of the regulatory process didn’t just break records, it was unprecedented. Lessons learnt will influence the development of drugs for decades to come and set new expectations of the industry’s ability to respond to medical crises.</p><p>Whilst new technology played its part, notably MRNA; the most significant changes to achieve this record regulatory result were in the processes and culture of the pharmaceutical industry and its regulators.</p><p>These lessons have implications far beyond the confines of the medical world, lessons that the infrastructure sector and its regulators must learn from if they hope to deliver on the promise of solving society&#39;s greatest challenges of the 21st century on time and budget.</p><h3>Lessons from the Pandemic</h3><p>So what can the infrastructure sector learn from this journey?</p><p>The interaction between proposers and regulators is at the heart of every infrastructure project. The balancing of the various stakeholders&#39; requirements, the environmental impact and the cost to deliver, almost always exceeds the length of the project’s build phase. The first official consideration of what became the recently opened London Crossrail was in 1944, New York’s 2007 Second Avenue subway extension was first discussed in 1919!</p><p>The dual crises of climate change and the new geopolitical reality require a step change in how the infrastructure sector and its regulators collaborate to deliver the strategic infrastructure society needs in the 21st century. We need a different culture, ways of working and technology that aligns incentives to deliver on time and budget.</p><p>Over the coming weeks we will explore three core learnings from the pharmaceutical industry&#39;s approach to the Covid-19 pandemic; how these shifts in culture, ways of working and technology-enabled a dramatic improvement in the delivery of cutting-edge vaccines which have saved millions of lives.</p><ul><li>Multiple Paths, Multiple opportunities: How industry and its regulators kept their options open by developing multiple vaccine candidates simultaneously and cross-pollinated learning between candidates to quickly deliver the optimum solution.</li><li>Remote first trials: How industry and its regulators ran the largest clinical trial of a new vaccine in history in the middle of a pandemic by leveraging remote teams and technology.</li><li>Iterative Data, Iterative Learning: How industry and its regulators collaborated in reviewing new data as it became available providing rapid feedback to clinical teams and government stakeholders.</li></ul><p>Lastly we will attempt to synthesize these learnings into preliminary policy recommendations for infrastructure regulators grappling with responding to the dual crises of climate change and geopolitical uncertainty.</p><p><em>About Continuum Industries</em></p><p><em>Continuum Industries is a provider of an AI-powered infrastructure development platform, Optioneer, that enables power, utility and renewables companies to instantly visualise, analyse and comprehensively assess routing options for power lines, cables and pipelines.</em></p><p><em>By incorporating all environmental constraints into the development process from the very beginning and considering them together with social, engineering and cost criteria, Optioneer bridges the gap between existing routing procedures and the pace at which project development needs to happen to meet Net Zero targets.</em></p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=b70dc832b642" width="1" height="1" alt=""><hr><p><a href="https://medium.com/continuum-industries/lessons-from-the-pandemic-how-to-deliver-infrastructures-carbon-net-zero-future-b70dc832b642">Lessons from the Pandemic: How to deliver Infrastructures Carbon Net-Zero future</a> was originally published in <a href="https://medium.com/continuum-industries">Continuum Industries</a> on Medium, where people are continuing the conversation by highlighting and responding to this story.</p>]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Lessons learnt from my first Remote Workshop]]></title>
            <link>https://medium.com/@harryjan/lessons-learnt-from-my-first-remote-workshop-f7d71e658e0d?source=rss-8b5f64b2463c------2</link>
            <guid isPermaLink="false">https://medium.com/p/f7d71e658e0d</guid>
            <category><![CDATA[product-management]]></category>
            <category><![CDATA[remote-working]]></category>
            <category><![CDATA[facilitation]]></category>
            <dc:creator><![CDATA[Harry Hunter (He/Him)]]></dc:creator>
            <pubDate>Mon, 15 Jun 2020 10:14:23 GMT</pubDate>
            <atom:updated>2025-09-08T07:57:17.754Z</atom:updated>
            <content:encoded><![CDATA[<h3>Week Notes S3E0 Lessons learnt from my first Remote Workshop</h3><p>I ran my first remote workshop in March, pulling together teams from the UK, Kenya, Middle East and India to articulate their requirements for taking a local solution global.</p><p>Overall, I’m happy with the outcomes. We got what we needed out of the session. But it could have gone smoother, so I wanted to capture some of my thoughts for next time.</p><h3><strong>The Technology</strong></h3><p>I had a specific goal for this workshop: To jointly develop <em>“A roadmap of functionality that will enable [Local Solution] to be used on client projects in Kenya and the Middle East” </em>which I wanted to achieve by taking the group through a specific journey.</p><p>In the run up to the session I demoed a number of online tools for the first time that support remote workshopping including <a href="https://miro.com/">https://miro.com/</a> and <a href="https://mural.co/">https://mural.co/</a>, these are great tools with great ideas! That being said, the templates whilst numerous don’t cover all use cases and it takes time to become comfortable with a tool to use it in anger during a session.</p><p>So I went back to thinking how I’d run this session in real life and translated that into digital form via slides. It may be a tad ‘boring’ compared to the more creative options out there, but ‘if it works, don’t break it’. The latter part of my session was used to translate user focussed narrative into more abstract features; for which I used <a href="https://products.office.com/en-us/microsoft-whiteboard/digital-whiteboard-app">Microsoft Whiteboard </a>side-by-side with the slides using a split screen to steer the conversation (or at least try to).</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*V9TptavnHO7QrEpDyOo2PA.jpeg" /></figure><p>The actual work of presenting the session was on Microsoft Teams, which held up perfectly. I know other products (notably Zoom) have more features to support these sorts of sessions such as ‘breakout rooms’ but Teams didn’t let me down collaborating with a truly global audience.</p><p>I also note that Microsoft Whiteboard does include ‘Templates’ similar to Miro or Mural, however they are still in BETA stage and not comprehensive for all use cases yet.</p><p><strong>Outcome: I felt from a technology perspective this setup worked well and I’d use it again. I hope to use the Microsoft Templates more as they mature as a feature.</strong></p><h3><strong>The Structure</strong></h3><p>I put a lot of thought into structuring the session, both in terms of the outcomes and how I thought we’d get there. On the whole it went ‘OK’ in terms of getting the outcomes I was after, but a few thoughts:</p><ul><li>Although I thought I’d been upfront before the session on the outcomes, participants still turned up with different expectations. I should have reinforced that more, maybe by sharing the below slide in advance</li><li>I hadn’t thought enough about how participants want to communicate in detail. At times I’d structured things so that topics A and B were to be discussed/captured separately during the session whilst in reality participants wanted to talk about A &amp; B together. If we were in-person this wouldn’t be an issue, but when you’re working within the bounds of pre-prepared content/structure it can quickly derail your ‘Game plan’.</li><li>I’ll talk more about facilitation in a moment, but regarding structure it’s really hard to have the headspace to <em>restructure</em> on-the-go whilst keeping everyone together on the journey to achieving your set goal. You either need to re-oriented participants back towards the structure or re-use your templates in perhaps sub-optimal ways.</li></ul><p><strong>Outcome: Mixed, we got to the outcome in the end but it was really hard at times to keep the participants and the structure aligned at times.</strong></p><h3><strong>The Facilitation</strong></h3><p>For this session I was the sole facilitator, owning both the ‘Outcome’ of where I wanted the session to end up and the ‘Tactics’ of how to get there, by guiding the conversation.</p><p>Whilst I think I did a ‘OK’ job, it was bloomin ‘hard work! The ½ day remote session felt more exhausting than a full day in-person event. I described it to a colleague that you’re having to do a job which you’d usually use all five senses for with only one, the cogitative load is immense.</p><p>Breaking the facilitators role down you need to be:</p><h4><strong>Strategic</strong></h4><ul><li>Guiding the group through the structure to achieve the session goals</li><li>Formulating and asking open &amp; closed questions to articulate scope of conversation</li><li>Adapting the structure to handle pivots in conversations (adapting to surprises!)</li></ul><h4><strong>Tactical</strong></h4><ul><li>Formulating and asking open &amp; closed questions to capture details of conversation</li><li>Capturing &amp; translating answers/conversation to written form</li><li>Tracking who has/hasn’t contributed against each topic and prompting as necessary</li><li>Protecting group against <a href="https://www.forbes.com/sites/bernardmarr/2017/10/26/data-driven-decision-making-beware-of-the-hippo-effect/">HiPPOs</a></li><li>Protecting the group from (Unnecessary) Technical Deep Dives</li><li>Keeping the session to time/schedule</li></ul><p>For a single facilitator this is a huge amount of parallel processing to keep in your head over the course of a workshop. It’s not impossible for sure, just very hard to keep all these plates spinning whilst ensuring you deliver the session’s goal(s).</p><p><strong>Outcome: I think/hope I managed to keep all the plates spinning and get what I needed out of it, however I definitely struggled towards the end. In future I definitely want to split the above roles out to at least two people. How these are split will depend on the context of the session and the skills of the facilitators involved.</strong></p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=f7d71e658e0d" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Travel Notes S2 E7: The Inca’s Legacy]]></title>
            <link>https://medium.com/@harryjan/travel-notes-s2-e7-the-incas-legacy-f56161d556a0?source=rss-8b5f64b2463c------2</link>
            <guid isPermaLink="false">https://medium.com/p/f56161d556a0</guid>
            <category><![CDATA[peru]]></category>
            <category><![CDATA[travel]]></category>
            <category><![CDATA[weeknotes]]></category>
            <category><![CDATA[culture]]></category>
            <category><![CDATA[empire]]></category>
            <dc:creator><![CDATA[Harry Hunter (He/Him)]]></dc:creator>
            <pubDate>Thu, 31 Jan 2019 13:38:00 GMT</pubDate>
            <atom:updated>2019-01-31T13:45:59.174Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*8SzPqfNCwlegzzQ59Bi3iQ.jpeg" /></figure><p>Before there can be beauty there must be design, before there an be design there must be form, before there can be form there must be function.</p><ul><li>Function – it does it</li><li>Form – it does it well</li><li>Design – it does it beautifully</li></ul><p>The Incas understood this; you can’t help but appreciate the beauty in their structures, the artistry of their monuments, perfect symmetry between function, form and design that takes our breaths away 400 years after their fall.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*tOlEF2mdrFq02yRDLRu8qQ.jpeg" /></figure><p>Thus observing the alternative; today’s Peruvian society in contrast brings tears to my eyes. Homes built of necessity not desire, roads built in hope but left in dilapidation, People living for the now, at the expense of the tomorrow.</p><p>The country has gone backwards; from a beauty which still leaves visitors in awe to basic function(ality) that may ‘get the job done’ in terms of providing shelter, but provides nothing more; no sense of the builders identity, no addition to the architectural culture of the space, no legacy which will be recalled in 10 years time let alone 100 (To be fair I’d say something similar of many greenfield projects in the UK too…..).</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*3_ETx_M-jp6QcPN8HAYf7A.jpeg" /></figure><p>We, the West destroyed the optionality of a civilisation, we gave the Incas (and the Mayas, the Aztecs and rest) a single choice; conform or die, cake or death, change or fall. The possibilities of a civilisation that would change the course of a river to build a temple, construct a agricultural laboratory without the scientific basis of Darwin and expand an empire to the size of Europe in just 100 years boggles the mind.</p><p>Given a different set of circumstance, I hold confidence that it might have been the Incas (or Mayans, or the Aztecs) who discovered the scientific method, invented the internal combustion engine or sent the first man to the moon. We will never know…..</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*n-JkWlCZviBmuNnJoLahCA.jpeg" /></figure><p>There are hints of an ‘Incan revival’ that make me optimistic however; Quechua, Peru’s traditional language is being taught in schools again and increasingly used in day to day life in certain communities. Incan names and pronunciations, long subjugated to Spanish alternatives are returning to common usage and global agricultural monocultures are starting to respect and adapt Perus’ crop diversity, a legacy of centuries of learning in the hardy high Andes.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*uOmP_Y5zpTYkuK7wNgjaPw.jpeg" /></figure><p>This does little to overcome the structural, economic and political challenges the country was left with at decolonisation however; they were left with a poor hand to play and as with most of South America struggled to reconcile the role of government between domestic desires and international ‘realpolitik’ during the 20th Century. Yet I hope that by recovering pride in their past, Peruvians will (re)gain confidence that they can achieve great things that may be remembered by their descendants 500 years from now.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=f56161d556a0" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Travel Notes S2 E6: Getting high]]></title>
            <link>https://medium.com/@harryjan/travel-notes-s2-e6-getting-high-740a059a4202?source=rss-8b5f64b2463c------2</link>
            <guid isPermaLink="false">https://medium.com/p/740a059a4202</guid>
            <category><![CDATA[experience]]></category>
            <category><![CDATA[travel]]></category>
            <category><![CDATA[weeknotes]]></category>
            <category><![CDATA[south-america]]></category>
            <dc:creator><![CDATA[Harry Hunter (He/Him)]]></dc:creator>
            <pubDate>Thu, 24 Jan 2019 02:18:31 GMT</pubDate>
            <atom:updated>2019-01-24T02:18:31.209Z</atom:updated>
            <content:encoded><![CDATA[<h4>December 2018</h4><h4>Location: Chile-Bolivian border</h4><p>Head fuzzy, stomach funny, breath short; welcome to the high Andes five vertical kilometres above my home.</p><p>Oranges and browns dominate the landscape interspersed with only the hardiest of vegetation. Dried river beds lead to scorched canyons, ducking through caves formed in ancient years past.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*n9I6MKpbmWo1_ijBKgAaTA.jpeg" /></figure><p>Civilisation is found only in the oasis of the desert, infrequent shade gifted by irrigated groves and sandstone dwellings. Sunlight scorches colour away: a sephia vision of existence brought to you with a pipes led sound track better fitting a western than the 21st Century.</p><p>Days end with the return of contrast, long shadows and juxtaposed colour setting the landscape alights. Nursing sun-stroked bodies and altitude leaden heads we celebrate the darkness, finding relief in the heavy silence.</p><p>My companions for this journey are four newly qualified doctors. Portuguese in origin, passionate in temperament; insults of past folly and surprisingly tuneful ballads from home marking our time. Translations passing from Spanish to Portuguese to English and back giving a taste of international diplomacy, yet with a desert to explore we have no need to hurry our conversations.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*5XUfjO9jq7qHyAQ1zUrXag.jpeg" /></figure><p>Descending to the salt flats; sepia gives way to monochrome, the horizon disappearing into a mirage, eyes constantly searching for points of reference beyond the infinite wind blasted shapes. We stand on another world, as if civilisation had ended a thousand years ago leaving just footprints in remembrance.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*lVvqySNB59fnfnTXmVwjBA.jpeg" /></figure><p>Ahead lies the ‘real’ South America; not the tamed Eurocentric culture of Argentina and Chile, but the lands the Conquistadors never quite converted to their cause, the lands of the Inca, the lands of the coca leaf, the lands still trying to find their place in this 21st century globalised technocratic world.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=740a059a4202" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Travel Notes S2 E5: Into the Valley]]></title>
            <link>https://medium.com/@harryjan/travel-notes-into-the-valley-35dd2e13ebb3?source=rss-8b5f64b2463c------2</link>
            <guid isPermaLink="false">https://medium.com/p/35dd2e13ebb3</guid>
            <category><![CDATA[travel]]></category>
            <category><![CDATA[climbing]]></category>
            <category><![CDATA[adventure]]></category>
            <category><![CDATA[nature]]></category>
            <category><![CDATA[chile]]></category>
            <dc:creator><![CDATA[Harry Hunter (He/Him)]]></dc:creator>
            <pubDate>Tue, 22 Jan 2019 00:04:04 GMT</pubDate>
            <atom:updated>2019-01-23T15:05:39.355Z</atom:updated>
            <content:encoded><![CDATA[<h4>November 2018</h4><p>Location: Cochamo Valley, Chile</p><p>A “South American Yosemite” I was excitedly told so many months ago on a rainy Devon weekend; “granite walls touching the sky, remote in the extreme, yet a climbers paradise”.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*Y3NxyCCxrv_PBT2KYaQ4rA.jpeg" /></figure><p>With that description in mind Cathrin, my companion on this adventure, and I acquired provisions for a week and the services of Zero, a local ‘gaucho’ who at 68 years old knew every twist, turn, rut and root of the steep trail meandering upwards at the bank of the Rio Cochamo.</p><p>We’d hired Zero’s services, or more accurately the steeds which accompanied him to navigate to the Jura Jura base camp, some 6 hours outside of civilisation. The trail made for incredibly easy work for these scions of Spanish conquistadors, navigating up rock strewn gullys at a pace akin more to a motorbike than our partners gentle nature would suggest.</p><p>I don’t recall the last time I’d smiled so intensely, for such a long time, my partner for the day needing no encouragement to stray from the well trodden path through streams, copses and up seemingly impassable rockfaces, our souls seemingly aligned to mis-behave and enjoy the moment.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*vMZSb9ZFUj21UdCadeBNMQ.jpeg" /></figure><p>Our camp and home for the week nested in the alley beneath the granite peaks my climbing friend had so animatedly described. An idyllic meadow shared with gaucho’s hours and rangers livestock. Water, plentiful but alpine cold running off the peaks provided your choice in washing off the trail dust between a cold shower or colder riverbank.</p><p>Yet in this simplicity, cut off from the normality of modern life you gain a sense of peace. Reminded of how little we need to live; that hot water, WiFi and light pollution are not necessities it luxuries. That three simple meals (Oats for breakfast, cured eat and trail mix for lunch and pasta/cuscus for dinner) taste as fulfilling as a Michelle’s star in the right space and company. That shared goals and shared tribulations fore the firmest of friendships.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*tfdn5r29ZwwLWO-Os6XykA.jpeg" /></figure><p>Days hikes from the valley floor have more in common with a vertical obstacle course than a Sunday stroll; most if not all trails being cut from the dense primordial rainforest by intrepid climbers enroute to their first pitch.</p><p>Arch Iris is the most extreme example of this, requiring confident rope handling and deft footwork to navigate the upper echelons in search of fairytale views and the ego boosting highs knowing you are a member of the elite few to achieve its summit. The rock here is incredible; shoes sticking to granite faces as assuredly as tarmac on a hot day, enabling you to quite literally run up the lower curvature, dancing 100 metres up and 130 degrees away from the tree lines safety.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*AihjOLcm1X0KvSwXe2r_7w.jpeg" /></figure><p>Yet mountains have a tendency to retaliate to hubris, a sunrise and set later, our day restricted to a few dozen metres of tent and hut, huddled around the communal fire as the heavens attempted to carry our belongings away in an arc without a ship, the only trail out of the valley, cut off by a river grown thrice.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*mGoRKpXbnmEk4DJzX_IYFg.jpeg" /></figure><p>Yet for us happy few so lucky to be here, marooned from normality it’s just another day of peaceful contemplation.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=35dd2e13ebb3" width="1" height="1" alt="">]]></content:encoded>
        </item>
    </channel>
</rss>