<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0" xmlns:cc="http://cyber.law.harvard.edu/rss/creativeCommonsRssModule.html">
    <channel>
        <title><![CDATA[Stories by Hassan Chaudhary on Medium]]></title>
        <description><![CDATA[Stories by Hassan Chaudhary on Medium]]></description>
        <link>https://medium.com/@hassan04?source=rss-31044e5602b7------2</link>
        <image>
            <url>https://cdn-images-1.medium.com/fit/c/150/150/0*tEm8UBYHW97a6Hgo</url>
            <title>Stories by Hassan Chaudhary on Medium</title>
            <link>https://medium.com/@hassan04?source=rss-31044e5602b7------2</link>
        </image>
        <generator>Medium</generator>
        <lastBuildDate>Mon, 23 Nov 2026 21:06:37 GMT</lastBuildDate>
        <atom:link href="https://medium.com/@hassan04/feed" rel="self" type="application/rss+xml"/>
        <webMaster><![CDATA[yourfriends@medium.com]]></webMaster>
        <atom:link href="http://medium.superfeedr.com/" rel="hub"/>
        <item>
            <title><![CDATA[Odoo 20 for Manufacturers: The Engineer-to-Order Gap Might Finally Close]]></title>
            <link>https://medium.com/@hassan04/odoo-20-for-manufacturers-the-engineer-to-order-gap-might-finally-close-8077d0bb5833?source=rss-31044e5602b7------2</link>
            <guid isPermaLink="false">https://medium.com/p/8077d0bb5833</guid>
            <category><![CDATA[odoo]]></category>
            <category><![CDATA[odoo-erp]]></category>
            <category><![CDATA[odoo-development]]></category>
            <dc:creator><![CDATA[Hassan Chaudhary]]></dc:creator>
            <pubDate>Mon, 20 Jul 2026 00:35:27 GMT</pubDate>
            <atom:updated>2026-07-20T00:35:27.067Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="Odoo dashboard open on a laptop beside a CNC machine on a shop floor, with a machined part and calipers on the bench" src="https://cdn-images-1.medium.com/max/1024/1*XxCqfRxf1HgSbnhnoSZCGQ.png" /></figure><p>If you build to order, you’ve had the same conversation with every ERP vendor for years. They ask to see your bill of materials. You explain there isn’t one yet, because the customer hasn’t finished deciding what they want. They nod. Then they sell you a system that assumes you have one.</p><p>So you run the project side in spreadsheets, and the production side in the ERP, and somebody burns the last three days of every month making the two agree.</p><p>Odoo shipped something for this in the spring. Most people haven’t seen it, and there’s a reason for that.</p><p><strong>Two different kinds of “new”</strong></p><p>There’s a lot of Odoo 20 content out right now. Almost none of it separates two things that deserve to be separated.</p><p>Odoo pushes releases to Odoo Online every couple of months. Those features are live. Real companies are running them today. But they’re not released for Odoo.sh or on-premise, so if you’re self-hosted, you’re still sitting on 19.0, and you’ve seen none of it. It reaches you with Odoo 20 in the fall.</p><p>Then there’s the roadmap Odoo presented at Partner Days in April. Odoo’s own description of that document: a list of things we will maybe do.</p><p>Both get written up as Odoo 20 features. Only one of them exists.</p><p><strong>What’s already running</strong></p><p>The engineer-to-order piece is a package called Custom Industrial Equipment. It’s aimed at EPC and turnkey work, and it runs design and prototyping through procurement, manufacturing, on-site installation, and the maintenance contract afterward.</p><p>Worth evaluating even if you wrote Odoo off for this kind of work years ago. Standard ERP doesn’t fail ETO shops because the software is bad. It fails because the data model assumes a repeatable product, and yours isn’t one. This package doesn’t make that assumption.</p><p>Then there’s continuous production, which is the one most likely to show up in your numbers. You can record produced quantities against a work order now. Turn continuous production on in the BoM, and the next operation starts as soon as some quantity is ready instead of waiting for the whole order to close.</p><p>Run 500 units through four operations, and that’s three sequential idle gaps you’d been eating for no reason. On a shop with a real throughput constraint, it’s the difference between quoting six weeks and quoting four. Worth adding that this needs setting up carefully, because getting the operation sequencing wrong just moves the bottleneck rather than removing it. <a href="https://www.aviliodigital.com/">Partners who’ve done flow-based manufacturing setups</a> will spot that faster than you will from inside it.</p><p>Third one is small and saves a stupid amount of time. BoM overviews now show free-to-use and on-hand quantities in your warehouses <em>and</em> at your subcontractor. You already know how many phone calls that replaces.</p><p>A few more that shipped quietly. You can compare two BoMs by the quantities they consume, useful when costing alternate routes. Expiration dates made it into the traceability report. HS codes moved down to the variant level, which matters if you export and your variants classify differently. And Produce and Produce All became a single button, which sounds like nothing until you count the wrong-quantity confirmations it was causing.</p><p><strong>What’s promised</strong></p><p>Different confidence level. Read it that way.</p><p>Native frame agreements. If you sell on blanket orders and you’ve been faking it with a quotation template plus a spreadsheet tracking remaining quantities, this is the roadmap item to watch.</p><p>Project margin views, actual against projected, pulling billable time, purchases, and overhead together. If you carry an install crew, that’s the gap between finding out at closeout and finding out in month two.</p><p>Field Service and Planning merging into one resource engine. Technicians, vehicles, and equipment are scheduled in one place instead of two.</p><p>A rebuilt mobile interface with visible field labels and bigger touch targets. I know that reads like nothing. Go watch someone close a work order on a tablet wearing gloves and you’ll stop thinking it reads like nothing.</p><p>There’s also an AI agent that audits your books and reports in plain language. It’ll work fine on clean data. I’ve seen very few manufacturing databases I’d describe as clean, and I don’t think that’s an unusual sample.</p><p><strong>What will actually set your timeline?</strong></p><p>Not features. Plumbing.</p><p>Odoo 20 moves to a new front-end framework and a new API. XML-RPC still works, but it’s deprecated, with removal scheduled for a later version. If you’ve got a MES, a shipping system, an EDI feed, or anything else talking to Odoo from outside, this upgrade is when you find out what’s fragile.</p><p>Separately, Odoo removed record rules in the 19.x releases. Permissions work differently now. Per-warehouse visibility is the classic breakage point in manufacturing setups, and it’s usually something configured once by somebody who left two years ago.</p><p>Neither of those is a feature. Both will take more of your calendar than anything above.</p><p><strong>Between now and September</strong></p><p>Don’t wait for 20. Waiting for a version is how a year disappears.</p><p>Build one list instead: every custom module you’re carrying, plus everything connecting to your Odoo from outside. That’s the whole exercise. About a week of work, and it’s the only honest input into what an upgrade costs. Any partner quoting you without it is guessing, and you pay for the guess either way. If nobody in-house can produce it, <a href="https://www.aviliodigital.com/">it’s a small enough job to scope on its own</a>.</p><p>Then when 20 lands, keep it out of production on day one. Wait for the first stable patch. The people who skip that are the ones with a story about November.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=8077d0bb5833" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Odoo 20 for Contractors: What’s Actually Confirmed, and What’s Just a Roadmap]]></title>
            <link>https://medium.com/@hassan04/odoo-20-for-contractors-whats-actually-confirmed-and-what-s-just-a-roadmap-2fb86c8ef05a?source=rss-31044e5602b7------2</link>
            <guid isPermaLink="false">https://medium.com/p/2fb86c8ef05a</guid>
            <category><![CDATA[odoo-20]]></category>
            <category><![CDATA[odoo]]></category>
            <category><![CDATA[odoo-implementation]]></category>
            <category><![CDATA[odoo-erp]]></category>
            <dc:creator><![CDATA[Hassan Chaudhary]]></dc:creator>
            <pubDate>Sun, 19 Jul 2026 23:23:46 GMT</pubDate>
            <atom:updated>2026-07-19T23:23:46.011Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="Laptop showing the Odoo dashboard on a contractor’s desk with blueprints
 and a hard hat, construction site visible through the window" src="https://cdn-images-1.medium.com/max/1024/1*p86Js-qMOUifrkBdILqLaQ.png" /><figcaption>Odoo 20 arrives in fall 2026. Not everything in the previews is real.</figcaption></figure><p>Every Odoo partner on the internet has published an Odoo 20 preview in the last two months. I’ve read most of them. Almost all of it is guesswork dressed up as reporting.</p><p>Here’s the thing nobody’s separating out. Odoo ships two different kinds of things, and they carry completely different levels of certainty.</p><p>The first kind already exists. Odoo pushes releases to Odoo Online every couple of months, and those features have been running in real databases since spring. They’re not released for Odoo.sh or on-premise, which is why you haven’t seen them. They arrive at your door with Odoo 20 in the fall.</p><p>The second kind is the roadmap Odoo presented at Partner Days back in April. Odoo’s own words for it: a list of things we will maybe do.</p><p>Guess which kind fills those preview articles.</p><p><strong>What’s real</strong></p><p>Start with progress billing, because that’s where the money is.</p><p>The Construction Developer package now generates a progress report you sign off on before the invoice goes out. It’s been live since spring.</p><p>If you’ve ever had a client sit on an invoice while they argue about whether you’re at <strong>60% or 45%,</strong> you know what this is worth. The argument itself isn’t expensive. What’s expensive is that your net 30 quietly turned into net 75 and you covered payroll out of the line of credit. Say you’ve got a million and a half sitting in progress billings across four jobs. Six weeks of drag on that is real money, and you’re paying interest on it.</p><p>Moving the percentage conversation to <em>before</em> the invoice doesn’t eliminate the argument. It just moves it somewhere it doesn’t cost you anything.</p><p>One caveat. How you define your progress stages decides whether the sign-off actually holds up when a client challenges it. Configure that loosely and you’ve built a report nobody trusts. It’s worth setting up with <a href="https://www.aviliodigital.com/">an Odoo partner who has done progress billing before</a> rather than discovering the gaps during your first dispute.</p><p>Second one: Property Management and Property Owner Association can finally live in the same database. Used to be you picked one. If you manage buildings and administer associations, you know the workaround, because you’re probably running it right now. Two databases, or one database plus a spreadsheet doing the job a database should be doing.</p><p>The third one is unglamorous and might save you the most hours. Odoo now guesses at bill lines. Product, account, tax, and analytic distribution are all predicted from your own history and whatever the line says. Duplicate detection got smarter too, with a red flag for near-certain duplicates and a yellow one for the ones worth a second look before you post. Anyone processing subcontractor bills in volume will notice this in week one.</p><p><strong>What’s promised</strong></p><p><em>Different bucket. Read it that way.</em></p><p>The roadmap lists a construction vertical covering project quoting, work breakdown structure, shopping lists, subcontracting, and progress billing. If it lands the way it’s described, that’s the first time Odoo covers quote to progress billing without custom work. Big if.</p><p>Project margin views are on there too. Actual against projected, pulling in billable time, purchases, and overhead. Most contractors find out a job went underwater at closeout. This would tell you in month three, which is the only point where you can still steer.</p><p>Also listed: Field Service and Planning merging into one resource engine; direct vendor payments so you can batch bills and sign once instead of downloading XML and uploading it to your bank; and an AI agent that audits your books and reports in plain English.</p><p>That last one I’m skeptical about, and not because the technology won’t work. It’ll work fine on clean data. I’ve seen very few construction databases I’d describe as clean.</p><p><strong>The part nobody puts in the headline</strong></p><p>Your upgrade timeline won’t be set by any feature on this page. It’ll be set by two boring technical changes.</p><p>Odoo 20 moves to a new front-end framework and a new API. The old XML-RPC interface still works, but it’s on the way out. If anything talks to your Odoo from outside, and in construction there’s usually something, this is when you find out what breaks.</p><p>And Odoo already removed record rules in the 19.x releases. Permissions now work differently. Per-project and per-site visibility is exactly the kind of thing that gets configured once, never documented, and then silently breaks. It’s an audit, not a code fix, and it takes longer than people expect.</p><p><strong>So what do you do between now and September</strong></p><p>Don’t wait. Waiting for a version is how companies lose a year.</p><p>Go get a list of every custom module you’re carrying and everything that connects to your Odoo from outside. That’s it. That’s the whole task. It takes about a week, and it’s the single input that determines what an upgrade costs you. Most partners will quote you without it, which tells you something about the quote.</p><p>If nobody in-house can produce that list, <a href="https://www.aviliodigital.com/">experienced Odoo partners</a> will run it as a scoped piece of work before you commit to anything bigger.</p><p>Then when 20 does land, don’t touch production on launch day. Wait for the first stable patch. Everyone who’s been through this says the same thing, and the people who ignore it are the ones you hear about in November.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=2fb86c8ef05a" width="1" height="1" alt="">]]></content:encoded>
        </item>
    </channel>
</rss>