<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0" xmlns:cc="http://cyber.law.harvard.edu/rss/creativeCommonsRssModule.html">
    <channel>
        <title><![CDATA[Stories by Jayantha Wijesingha on Medium]]></title>
        <description><![CDATA[Stories by Jayantha Wijesingha on Medium]]></description>
        <link>https://medium.com/@jayanthawijesingha?source=rss-76ce50896fee------2</link>
        <image>
            <url>https://cdn-images-1.medium.com/fit/c/150/150/0*_wMwIe4mQXW5WHf3</url>
            <title>Stories by Jayantha Wijesingha on Medium</title>
            <link>https://medium.com/@jayanthawijesingha?source=rss-76ce50896fee------2</link>
        </image>
        <generator>Medium</generator>
        <lastBuildDate>Sun, 22 Nov 2026 04:41:43 GMT</lastBuildDate>
        <atom:link href="https://medium.com/@jayanthawijesingha/feed" rel="self" type="application/rss+xml"/>
        <webMaster><![CDATA[yourfriends@medium.com]]></webMaster>
        <atom:link href="http://medium.superfeedr.com/" rel="hub"/>
        <item>
            <title><![CDATA[Renewable energy potential underestimated]]></title>
            <link>https://medium.com/@jayanthawijesingha/renewable-energy-potential-underestimated-d7da00e7dbba?source=rss-76ce50896fee------2</link>
            <guid isPermaLink="false">https://medium.com/p/d7da00e7dbba</guid>
            <category><![CDATA[hydropower]]></category>
            <category><![CDATA[renewable-energy]]></category>
            <category><![CDATA[solar-energy]]></category>
            <category><![CDATA[mini-hydro]]></category>
            <category><![CDATA[major-hydro]]></category>
            <dc:creator><![CDATA[Jayantha Wijesingha]]></dc:creator>
            <pubDate>Fri, 09 Jun 2023 06:57:32 GMT</pubDate>
            <atom:updated>2023-06-09T07:07:54.560Z</atom:updated>
            <content:encoded><![CDATA[<p>Visionary goals have been expressed in recent reports on harnessing renewable energy (RE) in Sri Lanka. The ADB and UNDP issued a report titled ‘100% Electricity Generation through Renewable Energy by 2050,’ while the Ministry of Power and Energy report was titled ‘Sri Lanka Energy Sector Development Plan for a Knowledge-based Economy 2015–2025’. The latter featured a lofty pronouncement by the Minister Champika Ranawaka that stated: “We have set an ambitious goal of 100% energy self-sufficiency by 2030.”</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1000/1*3j2HpaJ9dPhdkukaAUF2hA.jpeg" /></figure><p>The island is blessed with hydro, wind and solar resources with existence of synergy between intermittent renewables (wind, solar) and hydropower. While costs of wind and solar plant continue to drop, advances in battery storage technology, smart meters and the trend towards distributed generation holds great promise over the decades to come. Thus, RE dominance in the national electricity generation mix can be attained economically as long as policies favour this outcome.</p><p>Meanwhile the debate is taking place on the proposed power system mix of the CEB Long-Term Generation Expansion Plan (LTGEP).</p><p>The CEB Engineers’ Union claims that the LTGEP is well-balanced with a generation mix of LNG, coal, hydro, wind, solar, etc., while the PUCSL has proposed that all future thermal power plants be based on Liquid Natural Gas (LNG) fuel.</p><p>The CEBEU believe that if the PUCL plan is implemented, the nation will depend largely on a single fuel for thermal power generation resulting in a detrimental impact on the energy security of the country.</p><p>The debate is complicated with arguments about costs of the various plant, fuel types used and the environmental impact of using coal.</p><p>The CEB plan reflects a change from past preference for a conventional power system configuration (base load coal with hydro power for grid regulation and storage) to the currently proposed system of a balanced portfolio of power plant options that feature thermal plant (firm) and renewable energy (RE) based plants such as wind and solar (intermittent). The plan is a step in the right direction.</p><p>Large-scale integration of RE-based plant is starting to happen. If the trend is to continue towards RE dominance over the coming decades, the type and operational characteristics of fossil fuel plants commissioned during the transition phase must be judged on how they influence the rate at which RE plants are integrated to the electricity supply network. Excess ‘must operate’ thermal capacity could delay the increased harnessing of wind and solar even though their cost of energy was low.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/650/1*bOv99Fw4KFCgJr56kz2Ntw.jpeg" /></figure><p>Transition towards</p><p>RE dominance</p><p>With the existing power system featuring a mix of coal, oil, hydro and diesel power plant, the large-scale integration of wind and solar presents new challenges to the power system planner.</p><p>In order to project forward from the present state towards a RE-dominant power system, it may be best to consider the hypothetical case of a 100% RE-based power system decades ahead.</p><p>On the basis of current technological trends and project activities taking place in the developed world, one could assume that a Sri Lanka specific 100% RE power system would feature the following elements:</p><ul><li><strong>Electricity considered a commodity with buying and selling through the network;</strong></li><li><strong>Time of day metering (semi-hourly with smart meters and batteries in use);</strong></li><li><strong>Wind, solar and hydro dominant;</strong></li><li><strong>Advanced forecasting of wind and solar energy yield;</strong></li><li><strong>Hydro power plant catchment enhancement (reforestation to increase “soak and trickle” effect — form of storage via delayed release);</strong></li><li><strong>Utility scale battery storage;</strong></li><li><strong>Roof top solar PV with battery storage (residential, commercial, industrial) with smart meters driving demand side management programs;</strong></li><li><strong>Smart offices, factories and homes with efficient electrical machinery and appliances;</strong></li><li><strong>National utility unbundled with distributed generation;</strong></li><li><strong>Mini/micro grids;</strong></li><li><strong>Rural electric cooperatives (bio mass, solar PV);</strong></li><li><strong>Wheeling of “green” power to businesses that seek favorable credentials for export products and/or marketing credentials;</strong></li><li><strong>National authority with generation planning and HV electric transmission system operational responsibility; and,</strong></li><li><strong>National authority for regulatory oversight.</strong></li></ul><p>The preparation of a LTGEP generation expansion plan over the transition phase to arrive at the above state seamlessly and economically will be a complex task with rate of capacity additions, type of plant and managing the intermittency the challenges that need to be addressed.</p><p>Type of fossil</p><p>fuelled plant</p><p>If analysis shows that additional fossil fuel plants are required, what type of plant should be utilised?</p><p>Coal is firm, but inflexible and does not make a good marriage with intermittent wind and solar power. Local environmental issues are prevalent (ground waste, emissions and acid rain affect).</p><p>LNG is firm, flexible and has added advantage of a clean source of supply for industrial heating and piped supply to commercial, industrial and residential facilities. Additional benefit over the long term (10–20 years) if gas is extracted from the Gulf of Mannar.</p><p>Diesel is firm and flexible with fast-track development, small scale infrastructure, low EPC cost, but high operating cost (fuel). Diesel plants can be placed at strategic port locations such as Galle, Hambantota, Trincomalee and Kankesanthurai.</p><p>Leaving economics aside, Sri Lanka is perfect for operating a hybrid power system. With the existing power plants in place (thermal + hydro), a program to increase power generation capacity by aggressively pursuing development of wind, solar, diesel plants and battery systems is technically feasible today (diesels and batteries will address intermittency).</p><p>With cost of wind and solar power plants and battery systems on a downward trend and their energy performance improving, the economics for implementing this option will look promising a few years ahead with the maximised RE harnessing option yielding the added benefit of creating skilled employment opportunities throughout the country.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/800/1*1TwR9QZHNkDntf0sXIcXiA.jpeg" /></figure><p>Those having doubts about the tremendous promise of RE should follow activities taking place in the world today.</p><p>For example, in coal-rich Australia, a recent news item reported that a 1,300 MW combined wind, solar and batteries project will beat coal power on price and reliability. The reader may Google “CWP 1,300 MW wind solar and batteries project” for details.</p><p>The fossil fuel dependent State of Hawaii is pursuing a Clean Energy Initiative to cut out the dependence on oil and coal by setting a goal to achieve 100% clean energy by 2045. Wind, solar, batteries and smart devices will play a major part in helping to attain this goal. The reader may Google; “Hawaii Clean Energy Initiative” for details.</p><p>In light of the above, why is the power system expansion debate so much focused on the coal and/or LNG option? Since LNG and coal plant developments require major infrastructure investment, does it make sense to pursue both options for the sake of energy security? Both expose the nation to fuel price and currency risk.</p><p>Leaving aside the issue of “power politics”, is the desire for additional “base load” plant due to the conservative mindset of the national power system planners? Are they concerned about the risk of integrating a large quantum of unregulated capacity? Is it also because the very same technocrats, university academics and concerned citizens (stake holders) lack familiarity with large-scale integration of RE plant for power generation?</p><p>Power sector technocrats are proceeding on the basis of knowledge and capabilities of a conventional approach while technological disruption — resulting from rapid advances on multiple fronts — is having a major influence on the integration of RE to the electric grid.</p><p>Seek foreign assistance</p><p>It will be best if the Government approached the international development and climate change mitigation institutions to request high level expertise on technical and commercial matters to address the challenge of integrating a large quantum of RE for electric supply over the coming decades.</p><p>The priority areas where assistance should be solicited are; a) resource assessments and setting up a geographic information system (GIS) for zoning land suitable for wind, solar and biomass, b) educating technocrats on state of the art RE technology and its evolution in the coming decades, c) advanced programs for system simulation to study effects of large scale RE integration, d) economic and commercial aspects that cover project development, electricity pricing, unbundling the electric supply network, skills development, etc. and, e) policies for accelerating RE project development via private sector investments.</p><p>Written by and extracted from Mayura Boteju.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=d7da00e7dbba" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Did Singapore Based Xpress-Pearl bribe Sri Lankan authorities for 250Mn USD in order to avoid 6.9Bn]]></title>
            <link>https://medium.com/@jayanthawijesingha/did-singapore-based-xpress-pearl-bribe-sri-lankan-authorities-for-250mn-usd-in-order-to-avoid-6-9bn-1856231014f8?source=rss-76ce50896fee------2</link>
            <guid isPermaLink="false">https://medium.com/p/1856231014f8</guid>
            <category><![CDATA[plastic-pollution]]></category>
            <category><![CDATA[chemicals-and-materials]]></category>
            <category><![CDATA[marine-pollution]]></category>
            <category><![CDATA[singaporean-companies]]></category>
            <category><![CDATA[marine-disaster]]></category>
            <dc:creator><![CDATA[Jayantha Wijesingha]]></dc:creator>
            <pubDate>Sun, 07 May 2023 15:19:44 GMT</pubDate>
            <atom:updated>2023-05-07T15:19:44.730Z</atom:updated>
            <content:encoded><![CDATA[<h3>Did Singapore Based Xpress-Pearl bribe Sri Lankan authorities for 250Mn USD in order to avoid 6.9Bn USD compensation?</h3><h3>The inordinate delay in initiating legal action against X-Press Feeders, the owners of container carrier X-Press Pearl, which sank off Colombo in early June, 2021 causing a maritime disaster, has taken a new turn with Justice Minister Dr. Wijeyadasa Rajapakse, PC, asking IGP C. D. Wickramaratne to probe an allegation that a certain party involved in the ongoing deliberations received USD 250 mn and the money was sent to an account at a British bank.</h3><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*L72IYqoue0OR68w5DzqF_w.jpeg" /></figure><p>The ill-fated vessel carrying 1,486 containers caught fire on May 20, 2021 off Colombo. Its cargo included 25 metric tonnes of nitric acid and as much as 50 bn plastic pellets.</p><p>The Justice Minister said so yesterday (12) when The Island asked the latest developments in the wake of the Sectoral Oversight Committee on Environment, Natural Resources, and Sustainable Development taking up the issue on 04 April. SJB MP Ajith Mannapperuma chaired the meeting, which was also attended by the Opposition Leader Sajith Premadasa.</p><p>Minister Rajapakse disclosed that he had received a certain foreign bank account number amidst accusations and counter accusations over the support extended to those who represented the interests of X-Press Feeders. He however declined to vouch for the veracity of the claim.</p><p>Asked where the government intended to file action in this regard, the Minister said that the Attorney General’s Department was of the view that it should be Singapore. The Minister said that he wouldn’t take a contrary view.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/728/1*RtSR5IjaiCfIqMtIRscbyw.jpeg" /></figure><h3>Sanjay Rajaratnam, PC, received appointment as the AG on May 26, 2021 as local and foreign firefighters were struggling to stabilize the vessel.</h3><p>At the time of the worst maritime disaster in Sri Lankan waters, Ali Sabry, PC, served as the Justice Minister.</p><p>The Marine Environment Protection Authority (MEPA) during Attorney-at-Law Dharshanee Lahandapura’s tenure as its Chairperson asserted that the case should be filed here as the incident took place within the country’s territorial waters.</p><p>Lahandapura’s term ended in early February this year and another lawyer Asela B. Rakewa succeeded her.</p><p>Minister Rajapakse said that during his predecessor’s tenure two teams had been tasked with probing the accident. Minister Sabry appointed one comprising three lawyers whereas the then MEPA Chairperson appointed a bigger expert group for the same purpose.</p><p>Dr. Rajapakse said that in spite of an assurance from the committee appointed by the MEPA that its report would be submitted by Sept. 23, 2022, it was delivered in January this year.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*b5jVRpvbUQyJvdRqO-i_vA.jpeg" /></figure><p>Those who felt that legal action should be filed here should realise that enforcement of whatever ruling would also be a challenge, the Justice Minister said.</p><p>Asked whether there had been an issue with regard to the presence of a group of persons believed to be lawyers representing the interests of X-Press Feeders at the Sectoral Oversight Committee meeting, Dr. Rajapakse said that he had asked the Chair to move them out as he couldn’t under circumstances discuss government plans with the opposing side.</p><p>The Oversight Committee shouldn’t have invited them for that particular meeting, the Justice Minister said, adding that the high-profile case remained a heavy burden. During the proceedings, it transpired that nearly two years after the incident, the expert committee tasked with assessing damages to the environment and other damages hadn’t been able to visit the location of the ship disaster. MP Mannapperuma has directed MEEPA and NARA (National Aquatic Resources Research and Development Agency) to take tangible measures to facilitate the expert panel to visit the site with the assistance of the Navy and Airforce. The MP has pointed out that the failure to do so could be detrimental to Sri Lanka’s case.</p><p>The Sectoral Oversight Committee Chairman said so after members of the expert committee appointed by MEPA disclosed that they had been deprived of Navy and Air Force assistance to achieve the set objectives.</p><p>Environmentalists have pointed out that it is not advisable to move Singaporean court though the Cabinet-of-Ministers approved the Attorney General’s recommendation in this regard. They want the case to be heard in Colombo.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*WPOYr4zfUhOc-mzXRR33pQ.jpeg" /></figure><p>They pointed out that the second report of the expert committee had recommended that Sri Lanka ask for compensation to the tune of USD 6.2 bn. During Lahandapura’s tenure Sri Lanka received USD 10 mn for clean-up operations and fisheries sector compensation.</p><p>A statement issued by Parliament Director Legislative Services / Director Communication (Acting) Janakantha Silva quoted MEPA Chairman Rakewa as having said that the expert committee report had been handed over to the Attorney General. Rakewa said that the AG should go ahead with filing the case.</p><p>The AG’s Department representatives assured that action was being taken in this regard. According to the statement dated April 06 issued by parliament on the meeting held on 04 April legal action had to be initiated within 45 days.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/720/1*xf5BzVNYmQlkKG1GMB4INQ.jpeg" /></figure><p>Written based on the news articles that appeared on national news dailies on the matter, such as <a href="https://island.lk/usd-250-mn-bribery-allegation-jolts-justice-minister/?fbclid=IwAR0cc9Zt95E2x-rsY81DHL74m7TVJAmPVAjulViPlVGURUVhdRfykbkXUfY">https://island.lk/usd-250-mn-bribery-allegation-jolts-justice-minister/?fbclid=IwAR0cc9Zt95E2x-rsY81DHL74m7TVJAmPVAjulViPlVGURUVhdRfykbkXUfY</a></p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=1856231014f8" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Not too late for alternatives ?]]></title>
            <link>https://medium.com/@jayanthawijesingha/not-too-late-for-alternatives-b04709c409bf?source=rss-76ce50896fee------2</link>
            <guid isPermaLink="false">https://medium.com/p/b04709c409bf</guid>
            <dc:creator><![CDATA[Jayantha Wijesingha]]></dc:creator>
            <pubDate>Sun, 30 Apr 2023 07:51:17 GMT</pubDate>
            <atom:updated>2023-04-30T07:51:54.648Z</atom:updated>
            <content:encoded><![CDATA[<h3>Not too late for alternatives?</h3><p>Recent protests bring Kelani River Dam Project to forefront once more…</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/945/1*WJx_oPrkG7ZR_mJfKK4AkA.jpeg" /></figure><p>The Kelani River Dam Project and its environmental impact was brought to light once more, with the recent protest that was held in Deraniyagala. The protest was staged on 13 February, against the multi-purpose water project of the Seethawaka River and the construction of an electricity power plant in the Rucastle area. The people in the area are opposed to the construction of an electricity power plant and the motive of the protest was to communicate that to the Government.</p><p>The Kelani River, starting from Samanala Kanda, meets the ocean in Colombo and is said to be 145 km in length. Eighty percent of the water used in Colombo is obtained from this river. It is also the source of multiple reservoirs in the country such us Castlereagh, Norton, Kehelgamu Oya, Maskeliya, Canyon, and Laxapana. It is also used for transportation, fisheries, sewage disposal, sand mining, recreational activities, and to produce hydroelectricity. The Government claims that building this dam will add 20 MW of electrical energy to the national grid. It is also said to provide electricity, heating, and light to thousands of homes along the river, it was promised that blackouts will reduce drastically, and that the entire nation will benefit from this project.</p><p>It is also supposedly one of the last areas left for a large hydroelectric power station, a lesser known fact. We spoke to Jayantha Wijesinghe, the Convener at Rainforest Protectors of Sri Lanka and an ardent environmentalist, to discover the environmental impact this project will have on its surroundings and the nation as a whole. Good or bad? The environmentalists speak “Let me answer it differently,” said Wijesinghe. “Any conservationist’s ideology anywhere in the world is that any dam built across a river is a disaster. It has been an accepted fact for close to two decades after multiple studies concluded that it would be a failure. So, any conservationist will oppose the idea 100%.” He continued: “Unless, of course, there is a greater need for the country. We are not extremists, if the needs of the people cannot be met; if the basic need for water is greater, we won’t stand in the way. However, this is not the case in Sri Lanka. Therefore, we do not recommend it. Its purpose is neither to control the floods nor deliver the people’s greater need.</p><p>“This project is focused mainly on making sure that Colombo does not flood, and there are plenty of ways to make sure that it doesn’t. There is an attempt to build four reservoirs upstream of the Kelani River to control the flood waters in Colombo.” Of cushions and cups: Proposals “We propose the following mechanisms, and if we focus on them you will see that this kind of massive project is unnecessary,” furthered Wijesinghe. “The most important thing that needs to be done immediately is to rejuvenate the flood regulating environments. This includes wetlands, paddy fields, streams, rivers, canals, and other irrigation mechanisms. But just like all things in this country, there is politics, with many underhand dealings.</p><p>“The previous Government started a flood prevention programme under its regime. The plan was to connect all the wetlands in Colombo by building interconnecting canals to direct the water into the ocean. The water was to flow from Diyawanna to Kotte, then to Attidiya, and was to finally be released into the sea. The advisors and engineers certainly misguided them as the project was a failure. Creating wetlands will not solve the flood problems. Building these tanks only increased it. “If there is a cushion and a cup with the capacity of 150 ml containing water, it is proven and rather obvious that the cushion will be able to hold more water than the cup’s capacity. The wetlands only have a limited capacity like the cup, therefore it was not successful. “Building these wetlands also intervened with existing habitats in the area. The naturally existing Kadolana plants were removed, land was filled and reclaimed, and the ecosystem of the existing animals was lost. The solution is to preserve the flood regulating environments and maybe even build a mesh along the river banks.” Reclamation of land — the biggest contributor “As a country, for last 60–70 years, we have been tampering with the existing environment. Land reclamation has been happening more in the last decade than ever before.</p><p>This will only increase the problems. Because of these projects, our ecosystems have changed, and even our rain patterns have changed. When we know we have made mistakes, we must learn from them. Yet, we continue down the same path,” noted Wijesinghe. Wijesinghe referred to the Mahaweli scheme as an example. A tunnel was dug to divert the water, but then a leakage occurred and all the surface water got trapped in this canal and left the people without any water. Forty years later, the same happened with the Uma Oya project. The people in the area were left without any water. This resulted in many indirect costs; water bowsers were required to provide sufficient water for the people, families had to be relocated and helped into rebuilding their lives, etc. The final cost was far greater than the investment itself.</p><p>“This takes place even within Colombo’s suburbs; the main flood regulating paddy fields in Homagama were reclaimed in order to build the bus station. A few years later, it was being done in Kottawa for the same reasons. If these areas also begin to flood a couple of years down the line, we know what the main contributor is. “We are a country full of smart and educated people, I am sure we can come up with solutions without having to reclaim land. Why not build columns and have elevated car parks and stations instead?”</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/945/1*m7-kshbIADGWdLf8T_UOfQ.jpeg" /></figure><p>The immediate repercussions According to Wijesinghe, building reservoirs upstream is extremely dangerous. “This area has a high probability of the occurrence of landslides and floods. The people will have to be extra cautious and vigilant. This area is geologically very sensitive and unstable, and building a canal will only add to its instability.” Kosala Sugathapala, a resident of Deraniyagala and a member of the Janahanda Sanvidanaya (a group formed and commissioned by the Chief Priest of the village to create awareness and stand up against the project) spoke to us about the matter. “To begin with, we were not informed of such a project. We got to know of it only when a popular radio channel mentioned it first. We are still confused about whether it is going to be a dam or a power plant.</p><p>The project is commissioned by the Dehiowita Pradeshiya Sabha and when we question them, they too don’t give us a proper answer. “After the construction, the water level in our river is supposed to rise by one metre. Currently, it is at 69 m and they predict it to rise up to 70 m. Recently, they came and marked it, and warned more than 15 houses close to the river of flooding. We live in a flood prone area, and if this project is implemented, our village will be flooded faster than usual.”</p><p>Roshan Chathuranga, an environmentalist at the Shilpa Sayura Foundation and a resident of Deraniyagala, also confirmed the views presented by Sugathapala. He was also a part of the recent protest against the construction of the dam. He mentioned that the people were most upset about not being informed of such a construction that is to take place in their village and the continued avoidance of the questions and concerns they raised. According to Wijesinghe, it is also one of the greenest areas in the country with the most amount of rainfall accounted for. With the changes made to its existing ecosystem, this too will change rapidly. The existing environmental flow will discontinue. Wijesinghe elaborated that the Seethawaka basin has the most diverse aquatic biodiversity. “When we tamper with its environment, these biodiverse endemic fish and beings will be affected, and their species will soon vanish. No one is accounting for these small creatures, unlike a rhino or a tiger or even a bear.”</p><p>Direct impact According to Wijesinghe, for the construction to begin, the people in the area will have to be vacated immediately — there are close to 5,000 families living in the area. “They will have to be relocated not too far from the area they are used to. This means that they will have to deforest in order to provide land. “There will be massive costs in building new infrastructure which will have to include everything from houses to schools and lands.” Not to mention, it will be unimaginably expensive, both directly and indirectly, he added.</p><p>Learning from others “Bangladesh is a country that suffers from many floods. As a nation, they have accepted and adapted to it,” stated Wijesinghe. “They have learnt to manage it by strengthening their disaster control programmes. “Other parts of the world including major cities like Florida and London have similar problems. They resorted to adopting climate resilient, smart planning, and climate impact mitigation measures. Colombo won’t flood that easily, and there are different methods to solve this problem. “If we remove the illegal settlers along the Kelani River and build elevated river banks, the immediate problem will be solved. It will solve the matter to a great extent, as they are the people most affected.</p><p>“A World Bank study was done on nine river basins in Sri Lanka, off which the Kalu Ganga records the biggest flood-related disaster in 2007, which certainly requires more attention. So, it is clear that Colombo is given more prominence for political reasons.” It’s not too late “With the Open Government Partnership (OGP) Summit in 2019 that enables citizens, civil society, and businesses to participate in government decision-making, and with Sri Lanka signing the treaty as well, we are now able to play a vital role.</p><p>It still hasn’t come to the implementation stage, but it is the responsibility of the Government to educate the people before such a study is undertaken. Just as the government sectors are informed, the people must also be educated. If not, they panic,” shared Wijesinghe. “With agreeing to the OGP, the Government is now responsible to get the people involved and consult them first. They must follow measures to find out what the people affected expect and want done. In fact, they now require the approval of the people before seeing a project through. But none of these protocols were followed, and ultimately resulted in a protest. “We are currently in discussion with the Climate Resilience Improvement Project (CRIP) and are working towards writing to the Government and President himself with our opinions. We will also request that the open governance treaty to be followed to end secrecy. It is not too late as it still in the planning stage.” He suggested that the Government should: · Look at the already existing alternatives · Have an open conversation with all the stakeholders involved and affected · Consider all the indirect costs and other externalities ·</p><p>Look at what can be done in a smaller scale as solutions without looking at massive projects such as these first · Take smaller actions that will create more impact rather than big “solutions” that will have bigger negative impacts “We are urging the Government to relook at this entire study before implementing it. We must look at more nature friendly solutions as building a dam across is proven to be detrimental,” he concluded.</p><p>*With the testimony of Sugathapala, we approached the Dehiowita Pradeshiya Sabha. They dismissed us by saying that it does not belong to their territory and directed us to the Deraniyagala Pradeshiya Sabha, who confirmed that the Seethawaka basin or the area proposed is within their borders, but up to date, they have not received any information about it or even a commencing date. They also informed us that their central committee (Sabhava) was also unaware of this project.</p><p>By Jithendri Gomes<br>The Morning</p><p>#deraniyagala<br>#worldbankinsrilanka<br>#WorldBankGroup<br>#worldbankinspectionpanal<br>#worldbanksponsored<br>#floodretention<br>#cripproject<br>#Crip<br>#Crimp <br>#musltidestructivereservious<br>#damnthedamn<br>#nodamming<br>#dammingrivers<br>#riverineecosystems<br>#kelaniriverbasin<br>#megaprojectsinsrilanka<br>#megaprojects<br>#megaprojectsmegascams<br>#megaprojectsmegacorruption</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=b04709c409bf" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[ENVIRONMENTAL PROFILE OF RATHNAPURA — RAINFOREST PROTECTORS]]></title>
            <link>https://medium.com/@jayanthawijesingha/environmental-profile-of-rathnapura-rainforest-protectors-bc1e8510294?source=rss-76ce50896fee------2</link>
            <guid isPermaLink="false">https://medium.com/p/bc1e8510294</guid>
            <category><![CDATA[sinharaja]]></category>
            <category><![CDATA[volunteering-opportunity]]></category>
            <category><![CDATA[volunteering-in-sri-lanka]]></category>
            <category><![CDATA[sri-lanka-tourism]]></category>
            <category><![CDATA[world-heritage-site]]></category>
            <dc:creator><![CDATA[Jayantha Wijesingha]]></dc:creator>
            <pubDate>Tue, 11 Apr 2023 08:15:47 GMT</pubDate>
            <atom:updated>2023-04-11T08:15:47.719Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/768/1*arYVFzP7V09A0O-1wbuRDQ.jpeg" /></figure><h3><a href="http://cea.nsf.ac.lk/bitstream/handle/1/15872/04286.pdf?sequence=1&amp;isAllowed=y">ENVIRONMENTAL PROFILE OF RATHNAPURA</a> — RAINFOREST PROTECTORS</h3><h3><strong>DEFORESTATION</strong></h3><p>Deforestation is one of the most serious environmental problems in the Ratnapura district. The natural forest cover in the district is estimated at 62,500 consists of 48,430 ha of dense forest and 14,070 ha of open forest. Thus the forests cover an area of approximately 19 percent of the total district land area, which however, is less than the national average of 22.5 percent. Most dense forest is found in Kalawana AGA division (18,500 ha) followed by Ratnapura (10,900 ha) and Imbulpe (5,310 ha).</p><p>The rapid depletion of the forest cover has been particularly marked in<br>the last three decades or so. At one level deforestation has much to do with rural poverty. For the rural poor selling firewood (for example, to households, bakeries, tea factories and brick kilns) provide a means of earning a livelihood. At the same time because of the low income generated by the majority of rural households firewood forms the principal<br>cooking fuel (Table 2.10). Exploitation of forest for firewood is especially in<br>evidence in the AGA divisions of Balangoda, Embilipitiya, Kahawatta and Kolonna.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/960/1*X-E7p7Oq0IKK-AjReHFSOw.jpeg" /></figure><p>This form of deforestation is most marked in open forest and scrublands.At another level, deforestation is the outcome of organized forest felling for<br>commercial purposes, which unfortunately, often receives hidden or at times even open patronage of power groups within and without the district. It is claimed, that in the circumstance, the offenders have the capacity to act with impunity. Illicit felling is a problem in particularly all AGA divisions of the district but the worst affected are Kalawana, Ratnapura, Imbulpe, Godakawela, Balangoda, Kolonna and Embilipitiya.</p><p>As could be expected, most illicit felling takes place in dense and open forests. It may be noted that the illicit felling operations hardly spare the environmentally ciritical areas. A related aspect is the deforestation of patches of forest in patanas by the prevailing tendency to set the grasslands of fire. The patanas which consist of coarse grass interspersed which patches of forest, cover about 3,150 ha (1 percent of the district of the district land area). They are mostly found in the AGA divisions of Imbulpe, Balangoda, Weligepola, Ratnapura and Kolonna. In some instance patanas are burnt for economic reasons (for chena cultivation, to collect bees honey or enable the grass to throw up tender shoots for cattle to browse on) but at other times it is simply done as a form of diversion.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*Bttky0iUOlZl8JtGFInM7A.jpeg" /></figure><p>It is, of course, evident that deforestation in whatever form, exerts a negative impact on the macro and micro environments. Heavy run-off of rainfall, floods, landslides and soil erosion are inextricably linked to the dwindling of forest reserves. It is also well known that depletion of the forest cover contributes to a decrease in rainfall, in the long-term. It is reported from the AGA division of Kolonna, Balangoda, Imbulpe, Embilipitiya, Eheliyagoda. and Ayagama that because of the depletion of<br>forest cover temporary drying-up of springs, wells &amp; water courses is evident even in dry periods of short duration.</p><h3><strong>Encroachment of Reservations</strong></h3><figure><img alt="" src="https://cdn-images-1.medium.com/max/532/1*Pilm02FwAkBKzwAH1OLKXQ.jpeg" /></figure><p>In common with other districts, in Ratnapura district too, different types of reservations have been set-up with the objective of protecting environmentally critical areas such as forests, streams, irrigation canals etc. Encroachment on reserves brings in its wake harmful environmental consequences such as heavy soil erosion, rapid silting of irrigation channels, permanent drying up of springs and slope instability conducive to different kinds of mass movement. Hence, the violation of reserves through encroachment has to be viewed with serious concern. In some instances encroachment is simply a response to poverty and landlessness. People encroach on reserves to find a place to work and live in.</p><p>In this process stream and canal reservations in particular, are highly vulnerable as they provide choice land with access to water. The poor are also drawn to reservations to collect medicinal plants and herbs and bees honey (e. g. Embilipitiya division). Considerable damage is also caused to reservations by setting grass and patches of forest adjoining reservations on fire.</p><p>As earlier mentioned setting gras on fires is to provide better grazing opportunities for cattle as evident in Imbulpe and Balangoda divisions. Forests are burnt down for chena cultivation. The authors also came across instances of setting fire to forest reservations planted with pines, for no reason other than the people’s antipathy towards them.</p><p>Encroachment on forest reserves is reported in particular from the AGA divisions of Kolonna, Ratnapura, Weligepola, Imbulpe and Embilipitiya. It is evident that felling of trees on forest reserves takes place at two levels. The first is where the poor resort to unorganized felling and sawing of timber, primarily to eke out a livelihood. But the second is where the operations are highly organized and carried out on a large scale by powerful elements.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/720/1*KgG0U-FJq1lJiF3QEpuSrw.jpeg" /></figure><p>Illicit gem mining is another activity that leads to the violation of reservations. As in timber felling, this too is undertaken both on an organized and unorganized scale. Encroachment due to this source has been reported from at least 12 out of the 15 AGA divisions. As referred to earlier, the violation of reservations through encroachment results in damage to environmentally critical areas.</p><p>Because water reservations have been encroached upon, drying up of springs has resulted in Hatarabage and Kinchigune Grama Niladhari divisions in Imbulpe AGA division. Galpaya in Godakawela division and Narangoda in Pelmadulla division are other examples. Opening up of forest reservations has not only caused damage to flora but also resulted in the loss of fauna as reported from Embilipitiya, Kolonna, Balangoda, Imbulpe, Weligepola, Godakawela and Elapata AGA divisions.</p><h3><strong>Gemming</strong></h3><p>Gemming occurs in all AGA divisions in the Ratnapura district, but most activity is found in the divisions of Embilipitiya, Kuruwita, Ratnapura, Pelmadulla and Kalawana9 . The more important streams where gem bearing gravels have been exploited on a large scale are Getahetta oya near Eheliyagoda, the Denawaka ganga between Ratnapura and Pelmadulla and the We ganga between Ratnapura and Kahawatta. Other important areas are located on the Hangomuwa and Niriella streams.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*ag53XB_sIec-01EHi6QsyA.jpeg" /></figure><p>The gem bearing gravel (Mama) occurs in beds or pockets and are found to extend from a few metres beneath the surface, to a depth of 20 metres or more. When the gravel beds or pockets are at some depth, they are usually reached by sinking pits. Where the illatna shows horizontal extensions, horizontal tunnelling is resorted to. A less frequent form of gemming is to dredge the stream bed at a point upstream of a temporarily built low brushwood dam, until the pay gravel is exposed- This is followed by raking up the Mama and piling it up in a low ridge. The stream flow removes the lighter material from the heap, leaving the gem and the denser material behind. Either form of gemming, if unregulated, leads to serious environmental problems, the effects of some of which may be short-term (e.g. water pollution) or long-term (e.g. soil erosion, landslides etc.).</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/720/1*7De1jgeq2ekUoO53tcYhkA.jpeg" /></figure><p>There are many physical environmental problems that could be attributed to gem mining. Land subsidence of a localized nature, through excessive concentration of ‘pits’ and horizontal tunnels in particular localities, is a serious hazard. It may also be caused by the caving-in of abandoned gem pits. Examples of local subsidence due to this source is seen at Alawala junction (on Paraluwa road in the Ratnapura AGA division) and Gurugoda (on Ratnapura-Pelmadulla road), it has also been observed that landslides may be triggered off in areas where gem mining has contributed to slope instability.;. Regular dewatering of gem pits leads to the lowering of the water table’with its attendant consequences.</p><p>Sedimentation of clay minerals (finely crystalline hydrous aluminium silicates and hydrous magnesium silicates, Occurring in a fibrous or platy form in a layered structure and possessing an ability to take up and discard water) and other soluble minerals (calcium, magnesium, potassium and sodium are the most important) in paddy fields, resulting form the sinking of gem pits, obdurate the surface soil limiting the extent of cultivable land and also reducing yield as is abundantly evident in the AGA divisions of Eheliyagoda, Elapata, Ratnapura and Pelmadulla. Similarly, the clay minerals which may be dissolved in the pumped water from ‘pits’ may adversely impact the micro plant and animal life where gemming takes place. It is worth noting that gemming operations also cause both direct and indirect damage to the forest cover. When mining is carried out in stream beds not only is the overburden of sand and silt rapidly transported downstream by the agitated stream, but the banks are also subject to heavy erosion. Furthermore, where the brushwood dams are too high, the rivers may overflow the banks causing the adjoining lands to be water logged.</p><p>In addition to physical environmental problems, there are also the human environmental problems caused by gemming. The unfilled or partially filled abandoned gem pits provide a breeding ground for malarial and other types of mosquito. This has led to the increasing incidence of malaria in the AGA divisions of Ratnapura, Kahawatta and Embilipitiya. Overcrowding under unhygienic conditions (lack of toilets and safe drinking water) where large scale mining takes place, has raised the incidence of water borne disease such as typhoid, para-typhoid, dysentery, infective hepatitis and enteritis.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*nnXA55C2HawW3veWxo_DPg.jpeg" /></figure><p>While the licenced operators are required to adhere to certain standard procedures in gemming operations to minimize environmental damage, these procedures are often observed in the breach. A clear example is the failure of many operators to close the ‘pits’ once mining activity ceases. But the greater damage is caused by those who carry out illicit gemming. Indeed, they do operate even in environmentally critical areas.</p><h3><strong>Soil Erosion</strong></h3><p>Soil erosion is another widely prevalent environmental problem. Yet even among the farmers of the district there is little awareness of the problem. For example, in a study carried out in the Muttetupola GN division (of the Weligepola AGA division) the farmers when requested to comment on problems associated with soils had commented on lack of water, poor drainage and difficulties with tiling, but not on soil erosion per se. It is reported: “The soil erosion, which in this area will express itself mainly through decreasing soil fertility (since the soil is. deep enough it will not immediately cause shallow soils), is not always brought forward by the farmers. However, after some discussion the farmers in general acknowledge that the productivity of their land has decreased in a number of years”</p><p>Soil erosion in the Ratnapura district may be attributed to a multiplicity of factors such as deforestation through various means, landslides, floods as well as poor management practices under certain types of cropping (e.g. upland annual cropping). It is also found that bad management practices in some tea and rubber estates, as well as uprooting for replanting also contribute to soil erosion. More recently housing development on slopes has also been a causative factor. However, the intensity of soil erosion varies according to certain conditions. For example, in the study cited above, the following land units were present:</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*wtVnqTRUdKpamz6ztfEQVw.jpeg" /></figure><p><strong><em>(a) erosional remnants with shallow soils;</em></strong></p><p><strong><em>(b) moderately steep to steep slopes with “ratu pasa” and some rock out crops;</em></strong></p><p><strong><em>© sloping to moderately steep slopes with “well pasa”;</em></strong></p><p><strong><em>(d) undulating to rolling area with “rattu pasa “;</em></strong></p><p><strong><em>(e) bottom-land with “kalu pasa/karametta-pasa”:</em></strong></p><p><strong><em>(f) alluvial plain with “karametta-pasa”, imperfectly drained;</em></strong></p><p><strong><em>(g) alluvial plain with “karametta-pasa”, poorly drained;</em></strong></p><p><strong><em>(h) rock outcrops.</em></strong></p><p>When these land categories are taken note of its is evident that soil erosion is heaviest in category (b) which is marked by moderately steep to steep slopes. In category © and (d) though conditions are fairly stable under existing land use (home gardens and upland cultivation of coconut, banana, papaya etc.), they lend to erosion when upland cultivation is combined with a low level of management. In (a) deforestation could lead to rapid loss of fertility as the soils are very shallow. In any case the potential for agriculture in category (a) is severely restricted.</p><p>In view of the above, well planned land use systems to suit soil and terrain conditions, coupled with sound management of the same, arefa sine qua non for sustaining soil fertility. The present approach to soil conservation which depends on construction of bunds is too restricted is scope. More emphasis needs to be paid to soil conservation through improved farming practices (planting perennial in between annual crops on the contours, mulching, use of organic manure etc.)</p><h3><strong>Chena Cultivation</strong></h3><p>Chena cultivation is a salient feature in the AGA division of Kahawatta, Weligepola, Godakawela, Kolonna, Balangoda and Embilipitiya. Traditionally chena cultivation had been a system of utilizing the unirrigable ‘high-land’. It, therefore, complemented the irrigated agriculture of the ‘lowlands’. At present chena is being sustained by cultural inertia, especially among the poor. It is worth noting that the poor find the system advantages, in that, returns to labour are high in a system where labour is the only input. Multiple cropping in chenas also has the distinctive advantage of minimizing and distributing cultivation risks.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/804/1*eKLr9hTv7J5WWVXaycFZIA.jpeg" /></figure><p>In the present context, given the imbalance in man/land ratio, owing to pressure of population on land, the finely articulated cultural practices are no longer sustained and this has contributed to environmental degradation. Thus the fallow periods are getting shorter, with the inevitable effect of preventing the forest from re-establishing itself The process if unchecked causes the succession to a grassland climax. Steeper slopes which had hitherto been avoided have also been utilized for chena cultivation. It has contributed to a series of environmental problems in the form of soil erosion, drying-up of springs, siltation of water courses and irrigation channels and destabilisation of slopes (leading to landslides).</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/843/1*SyHEnkpjFNlNbQ-6HPFZbg.jpeg" /></figure><p>Although chena was practiced under a permit system in the recent part (e.g. at Rajawaka, Tanjantenna, Medabedda and Bowatta in Balangoda AGA division) the present official attitude, for reasons enumerated above, is to prohibited the activity altogether. Yet, given the poverty to the rural population in areas where chena cultivation prevails, such prohibition, by and large, has been ineffective.</p><p>It is, therefore, obvious that in dealing with the problem of chena cultivation one has to be sensitive to the need for rural livelihoods. Hence, any viable action to contain, if not eliminate chena, has to be carefully planned. A first step would to be classify chena areas on the basis of likely environmental damage. Such an approach would enable to identify from potentially less through moderate to highly environmentally critical areas in which chena is undertaken. In the highly critical areas an all out effort would be required to prevent chena cultivation altogether. However, a cardinal requirement would be to provide alternative livelihood to the poor, which may even require their resettlement elsewhere. In areas where risks range from low to moderate a sound scheme of stabilizing chena cultivation through proper extension and support services need to be introduced. In the systematic planning of such a scheme, it would be useful to take note of limitations and constrains that have.been observed elsewhere.</p><h3><strong>Community Participation</strong></h3><p>Community participation in environmental activities has been fostered in several ways. One approach has been to promote awareness build-up among school children. It is also planned to form environmental pioneer brigades in schools to generate action among school children in the area of environmental conservation. Already two pioneer brigades have been formed in two leading schools in the Ratnapura AGA division and it is expected that these will have a demonstration effect on other schools in the district. A school garden development project has received the support of the Provincial Ministry of Education, and has been promoted on a pilot basis, in several leading schools in the district. As a further measure of raising environmental consciousness among school children — tree planting, poster exhibitions and essay and art competitions on environmental themes have been held on a regular basis in collaboration with both the public and private sector.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*juRKobwce0zoq9CtWmN4ug.jpeg" /></figure><p>The setting up of Environmental Protection Societies, usually with representation in Gramodaya Mandalayas is another example of facilitating community involvement in ‘ environmental activities. The existence of environmental protection societies was reported from the AGA division of Balangoda, Ratnapura, Kalawana and Ayagama. There have also been societies formed to overlook more specific environmental tasks such as forest conservation (as reported for example, from Ayagama, Imbulpe and Kalawana AGA divisions). Extension work on health and sanitation has been undertaken by the health authorities with active support from Rural Development Societies and Gramodaya Mandalayas. Similarly, extension efforts have been made by the Forest Department to promote tree planting among village communities in ecologically threatened areas.</p><p>It is also evident that community participation has been actively sought in the implementation of some of the conservation projects presently being implemented in the district. Thus the SihH’araja Conservation Project has provided for extension work in the surrounding villages’ to enlist public support for its activities16 . Similarly active beneficiary participation has been sought in the Joint Forestry Programme of the R-IRDP</p><p>Yet, there are significant drawbacks. Much of the efforts at community participation have neither been initiated nor sustained through community efforts. The very concept of community participation has been too narrowly conceived so that little effort has gone into making use of the experiential knowledge of the people for environmental conservation. The failure to take note of the community perspective at times — as in the introduction of exotic tree species — compels communities to adopt an anti — establishment stance. The general apathy shown by the people to environmental conservation is another constraining factor. This has much to do with the poverty of the district population. The axiom is that conservation strategies and poverty alleviation have to go hand in hand, Unless efforts are so directed, the poor may even consider that conservation strategies are inimical to their immediate interests.</p><p>However, community participation in environmental conservation is a highly desirable objective which needs strengthening in the Ratnapura district. -In promoting community participation it may be useful to be mindful of the following guidelines. First, community mobilization should be more of an informal than formal nature. Furthermore, such mobilization should focus on interest groups. Secondly, participatory processes should ensure widest possible community representation. Thirdly, community participation should be interpreted in comprehensive terms. That is to say, community participation should be such as to initiate, plan, carry-out and monitor village level environmental programmes. In other words, community participation in ‘conservation’ should be active and not passive.</p><h3><strong>Landslides Management</strong></h3><p>As indicated in chapter three, landslides form a major environmental hazard. in the Ratnapura district. In order to counter the threat posed by landslides a District Steering Committee has been formed to coordinate — action on landslides. Furthermore, divisional committees too have been formed in landslide prone areas under the chairmanship of the AGAA. Other members of this committee include the Land Development Officer, Gramasewa Niladari and representatives of NGO’s.</p><p>Information on the more important landslide areas in the Ratnapura district is contained in a study undertaken by the National Building Research Organization of some high risk landslide areas in Sri Lanka viz. •&gt; Handurukanda, Mihitiya, Patulpana, Akurankanda and Wetummala21 . The study provides information on the nature of landslides in each location, the degree of damage caused and potential risks. Site specific recommendations have been made to counter the hazard. However, the findings are based on reconnaissance work and need to be substantiated by in-depth studies of these locations.</p><p>On the other hand, landslide management necessities the adoption of measures to conserve hazard prone areas, and on the other, to evacuate people from high risk areas. The recommended conservation measures include the following either singly or in combination:</p><ul><li><strong><em>reforestation and reafforestation</em></strong></li><li><strong><em>preventing haphazard forest clearance</em></strong></li><li><strong><em>monitoring of ‘suspect’ areas</em></strong></li><li><strong><em>grading of steep slopes</em></strong></li><li><strong><em>providing contour drains</em></strong></li><li><strong><em>terracing</em></strong></li><li><strong><em>non-utilization of landslide-affected slopes either for human settlement or agriculture.</em></strong></li></ul><h3><strong>Forest Protection</strong></h3><figure><img alt="" src="https://cdn-images-1.medium.com/max/960/1*KBBq-6ZakW4bt5ZNxio2Dg.jpeg" /></figure><p>It was shown in Chapter three that deforestation through illicit fellings is a major environmental problem in the Ratnapura district.</p><p>As a method of preventing illicit fellings restrictions are placed on timber transport. Thus, timber cannot be transported within a particular district without a permit issued by the AGA for the purpose. Transportation across divisional/district boundaries has to be sanctioned by the DFO and the GA.</p><p>But there are other imperatives as well. Steps should be taken to provide the timber requirements of the district population through a well planned scheme. A massive public awareness programme on the environmental importance of forests too has to be mounted. Equally important is a committed political leadership at all levels.</p><p>It is also a requirement that timber is hauled during the day. The manning of check points at strategic locations by the Forest Department is also a method of regulating timber hauling. Additionally spot checks are undertaken by the Forest Department and the State Timber Corporation as well as by the AGAA and the Police. These law enforcement officers many also act on timojfs. On the initiative of the Forest Department and with support form the AGAA, Forest Protection Societies have been established within divisions as a means of mobilizing popular support for regulatory activities.</p><p>However, there are considerable practical problems which affect forest .protection. At times the difficulties relating to timber identification is a serious drawback. It has also been observed, that the permit holders utilize the same permit many times over, to transport timber. Permission to fell trees on private lands has been utilized as a means of encroaching on adjoining state land.</p><p>Regulation is also made difficult by the fact that large scale illicit felling of forest is highly organized. Often information networks set-up by interested parties enable them to anticipate official action. Instances were also reported where officials were threatened with bodily harm. It is also well known that action by powerful individuals and power groups neutralize the capacity of officials to carry out the law without fear or favour.</p><p>Problems of forest protection also arise from organizational weaknesses. The forest beats are large and the availability of manpower unsatisfactory. Too long a service in a particular station resulted in the development of personal links and loyalties by officials with the constituents, it is also claimed that there is connivance between some categories of officials and the offenders. However, given the low salaries and lack of appropriate reward schemes such tendencies cannot be ruled out altogether22 . The lack of exposure of prosecuting officials to the technicalities of the law makes prosecution of offenders difficult. Insufficient logistics support has also weakened the capacity to regulate. As pointed out in Section 4.2 the deficiencies in the law and the legal procedure has exerted a dampening impact on forest protection.</p><p>Hence, in order to strengthen forest protection some degree of rationalization of the existing management system is necessary. For example, the forest beats, should be of manageable size. Manpower requirements have to be urgently met. There is a case to organize a separate cadre of Forest Department officials on the lines of a quasi-police or quasi-military organization23 . The officials should be motivated by setting-up appropriate reward schemes. It is also imperative to train Forest Department officials in the basic provisions of the law. Summary dispensation of justice through spot fines for certain types of offences, and instituting an Environmental Tribunal to quicken the legal process bearing on forest and other environmental offences are called for.</p><h3><strong>Regulating Gem Mining</strong></h3><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*8Vs6E0llDeVb4G1jXekG-w.jpeg" /></figure><p>Unless well regulated, gem mining is an environmentally hazardous activity. The regulation of gem mining is undertaken by the State Gem Corporation with assistance from the district administration and the relevant agencies. Understandably, in future the district administration will be supplanted by the Provincial administration.</p><p>It is a requirement that gem mining be carried out under a licence issued by the SGC, whether in private or in state land. In case of private lands, the ownership rights have to be established and the authorization of the GS/AGA obtained. When tenanted (ande) paddy land is involved the consent of tenant farmers as well as the recommendation of the Assistant Commissioner Agrarian Services is required to formalize applications. In the case of joint owners, the licence is issued in the name of one individual only.</p><p>With regard to state land, the procedure adopted by the SGC is primarily based on the tender system where the highest bidder is given prospecting rights in the land offered for gemming. The land is usually given out on a one year lease and the lessee has to adhere to certain terms and conditions in regard to the sale of gems and proceeds thereof (e.g. commission levied on proceeds by SGC). The lessees also have to pay a licence fee of Rs 2,000/- in respect of each prospecting site.</p><p>More recently the SGC has also introduced a new scheme of issuing licences, on a pilot basis. Under this scheme state land is given over to registered societies for gem mining, on a licence issued by the SGC. The rights to mine and auction the gems are vested in the SGC. However, bidding rights at auctions are limited to the licences.</p><p>Despite these regulatory mechanisms enforced through the licensing system, illicit gemming is fairly widespread, increasing environmental damage as well as loss of revenue to the state. What is worse, such activities do not even spare the environmentally critical areas.</p><p>Among the more important impositions bearing on gem mining there are several worth highlighting. The excavated, earth and other materials have to be retained on-site to enable the subsequent closure of gem pits. The use of explosives in gem mining, is prohibited. There are similar restrictions on the removal of forest cover. Furthermore, gemming is forbidden within 44 feet from a main road, 33 feet from stream and 16 feet from an irrigation channel.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*wBS9vQqSygbIgg4rsK9Wgw.jpeg" /></figure><p>In practice, the capacity to enforce regulations is rather weak and the requirement to close the abandoned gem pits is very often observed in the breach.</p><p>The regulation of gem mining is beset with several difficulties. There is a lack of understanding and-unity of purpose among departments and agencies responsible for law-enforcement. Instances were reported when the SGC was not entirely sympathetic to environmental issues referred to it by the AGAA. The deposit required of the licensees is so low, that it does not bind them to close the pits when mining activity ceases. On the part of the licensees the point made is altogether different. That js the contraction costs involved in getting a refund on the deposit is high enough to make them forfeit the deposit .- by not closing the abandoned pits. Owing to problems of logistics and organization, close^supervision of gem mining activities is particularly difficult. Furthermore, police assistance had to be sought to carry out raids on illicit gem mining. As in illicit forest felling action against those who break the law is made extremely difficult by the patronage extended to them by the rich and the powerful. There are also references to occasional connivance with the wrongdoers.</p><p>Hence, effective regulation of gem mining would require legal and institutional changes in line with those suggested for forest protection. In addition the following steps may also be of relevance.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*juRKobwce0zoq9CtWmN4ug.jpeg" /></figure><ul><li><strong><em>A copy of every license issued for gemming be sent to he Gramasewa Niladari;</em></strong></li><li><strong><em>Raising the deposit charged to a licensee;</em></strong></li><li><strong><em>Employ labor to close abandoned gem pits (when this requirement has not been complied with) and charge labor hire on the defaulting licensee.</em></strong></li><li><strong><em>Regulations will have to be framed accordingly;</em></strong></li><li><strong><em>No fresh licenses are to be issued to defaulting licensees.</em></strong></li></ul><p><a href="http://cea.nsf.ac.lk/bitstream/handle/1/15872/04286.pdf?sequence=1&amp;isAllowed=y">http://cea.nsf.ac.lk/bitstream/handle/1/15872/04286.pdf?sequence=1&amp;isAllowed=y</a></p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=bc1e8510294" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Chines Debt Reality Check !]]></title>
            <link>https://medium.com/@jayanthawijesingha/chines-debt-reality-check-1d25653377f9?source=rss-76ce50896fee------2</link>
            <guid isPermaLink="false">https://medium.com/p/1d25653377f9</guid>
            <dc:creator><![CDATA[Jayantha Wijesingha]]></dc:creator>
            <pubDate>Sun, 08 May 2022 07:19:48 GMT</pubDate>
            <atom:updated>2022-05-08T07:24:19.167Z</atom:updated>
            <content:encoded><![CDATA[<h3>Chines Debt Reality Check !</h3><figure><img alt="" src="https://cdn-images-1.medium.com/max/977/1*h09iO5Ik9pcY595vi885gg.jpeg" /><figcaption>Chinese debt trap is no myth like the dragons are …</figcaption></figure><ol><li>For the last 10 years China spent 170Bn Dollars as debt to middle and lower income countries.</li></ol><p>2) We became low income from middle income with all the Chinese debt</p><p>3) This debt often kept off government balance sheets, directed to state-owned companies and banks, joint ventures or private institutions, rather than directly from government to government.</p><p>4) There are now more than 40 low and middle-income countries, according to AidData, whose debt exposure to Chinese lenders is more than 10% of the size of their annual economic output (GDP) as a result of this “hidden debt”.</p><p>5) Djibouti, Laos, Zambia and Kyrgyzstan have debts to China equivalent to at least 20% of their annual GDP.</p><p>6) Much of the debt owed to China relates to large infrastructure projects like roads, railways and ports, and also to the mining and energy industry</p><p>7) Much of these projects were done by the Chinese themselves with their contractors, workers and equipment, leaving almost nothing to gain for the debtor nations.</p><p>China lends money to other countries, which end up having to cede control of key assets if they can’t meet their debt repayments. Hambantota port etc in our case.</p><p>9) China does not publish records of its foreign loans, and the majority of its contracts contain non-disclosure clauses which prevent borrowers from revealing their contents.</p><p>10) China tends to lend at higher rates of interest than western governments. At around 4%, (In some case 6% in Sri Lanka) these loans are close to commercial market rates and about four times or six times that of a typical loan from the World Bank or an individual country such as France or Germany.</p><p>11) The required repayment period for a Chinese loan is also generally shorter — less than 10 years, compared to around 28 years for other lenders</p><p>12) China’s invested an estimated $1.4 billion in Sri Lanka’s Colombo Port City project alone, for which Sri Lanka gave 269 ha of land to China over a 99year lease.</p><p>13) One-in-five infrastructure projects in Africa are funded by China and one-in-three are built by Chinese companies. In Sri Lanka however, almost all the major projects during the last decade were done by Chinese.</p><p>14) Often these projects are taken up without appropriate studies on their socio-economic and environmental impact and even their commercial viability.</p><p>15) One of the countries which is already reeling under Chinese debt trap is Angola, which is repaying a multibillion-dollar debt to China with crude oil, creating major problems for its economy.</p><p>16) Another glaring example of this unviability is Kenya’s ‘railroad to nowhere’. The Kenyan government, realising the enormity of the debt that was required to be serviced on account of the Standard Gauge Railway (SGR) project from Mombasa to Nairobi and further inland, attempted to renegotiate the terms of loan payments. The result was a ‘freeze’ on fresh instalments by China’s Exim Bank for other infrastructure projects in Kenya. Worse, the threat of takeover of Mombasa’s hugely profitable port is now looming large — a la Hambantota — given Nairobi’s apparent inability to service the debt.</p><p>17) Asian countries are economically dependent on China for both exports and imports of goods, especially medical equipment and pharmaceuticals where Beijing is a world leader; and the debt is growing.</p><p>18) Montenegro is struggling to repay a multi-billion-dollar loan to China for a highway constructed by China Road and Bridge Corporation from ‘nowhere to nowhere’. Only the first 25-mile section of the proposed 270-mile road has been completed and the host country cannot afford to pay for the rest of project.</p><p>19) Beijing has seized several concessions from these nations, notably the ceding of 1,158 square km of territory in the Pamir mountains by Tajikistan</p><p>20) In 2018, the Center for Global Development named Djibouti, Kyrgyzstan, Laos, the Maldives, Mongolia, Montenegro, Pakistan, and Tajikistan as “highly vulnerable to debt distress” due to China’s Belt and Road Initiative. Sri Lanka is probably missed in this list.</p><p>##ChineseDebt ##ChineseDebtTrap #ChinesedebtSriLanka #Chinesetakeovers #Debtcrisis See less</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=1d25653377f9" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Disastrous 2021 and conservation challenge in 2022 for Sri Lanka!]]></title>
            <link>https://medium.com/@jayanthawijesingha/disastrous-2021-and-conservation-challenge-in-2022-for-sri-lanka-ed6f70baf4a?source=rss-76ce50896fee------2</link>
            <guid isPermaLink="false">https://medium.com/p/ed6f70baf4a</guid>
            <category><![CDATA[deforestation]]></category>
            <category><![CDATA[rainforest]]></category>
            <category><![CDATA[knuckles-mountain-range]]></category>
            <category><![CDATA[illegal-mineral-mining]]></category>
            <category><![CDATA[sinharaja]]></category>
            <dc:creator><![CDATA[Jayantha Wijesingha]]></dc:creator>
            <pubDate>Sat, 01 Jan 2022 14:03:23 GMT</pubDate>
            <atom:updated>2022-01-01T14:03:23.532Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*zxSH7vRMTPt9IcDf91CM2Q.jpeg" /></figure><p>Environmental Conservation in Sri Lanka is as challenging as the economy of the country. Environmental degradation was fully supported and carried out with the blessings of corrupt politicians. This has been the case throughout since the British left Sri Lanka, with a forest cover remaining close to 50%. Of course, the British rulers destroyed much of the central hills. Thereafter, Kalu Sudda began the destruction, which goes on at an alarming rate even to date in many forms. Be it deforestation of rainforests to mangrove forests, mining of sand, metal or gems, water pollution, air pollution or soil contamination, or for that matter conversion of wetlands low lands and paddy lands to forests to non-forest uses. All these are happening under the guise of development. From the felling of Sinharaja in the early 70s to the fast-paced Mahaweli Development project to more recent development projects such as highways, Hambantota port &amp; airport, various reservoir projects, and agricultural projects have contributed to the degradation of the environment so alarmingly and rapidly. Yet we are still a developing country that is almost bankrupt while many countries that were far behind us in the 60s have surpassed us in terms of both economy and quality of life. That simply proves none of these so-called development projects have contributed to the country in any way other than indebting the country more to another country or a donor agency. Such projects have destroyed the natural assets of the country in a big way that cannot be measured in Rupees and cents. Probably a million times economically beneficial for us than the output some of these large-scale destructive projects have promised to deliver.</p><p>Environmental destruction In Sri Lanka happens not because of lack of law but because of lack of enforcement. Yes, in some cases the fines are like age-old fines such as 100 rupees which were like a million bucks at Sudda’s time that has not changed to date. But one must also remember that often the fine comes with an option to imprison the wrongdoer, which in most cases does not happen. I believe there are enough laws and provisions in the law to curtail environmental crimes in Sri Lanka.</p><p><strong>Who is responsible?</strong></p><figure><img alt="" src="https://cdn-images-1.medium.com/max/900/1*7qrV6U4XCT62uz5myEm5nQ.jpeg" /></figure><p>In addition, the environmental destruction mainly happens thanks to 4 key groups who are to be blamed for the fall of the country overall. They are in order,</p><p>1) Corrupt public officials,</p><p>2) Corrupt politicians,</p><p>3) Corrupt/Greedy businesses/businessmen,</p><p>4) selfish public.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/850/1*dWTHhr_0U0mzfxFcz92mxA.jpeg" /></figure><p>Most of the environmental crimes are committed with blessings or due to the ignorance of the public officials and not because of politicians. Politicians cannot make policies without the support of public officials, without them, they cannot twist laws and regulations to comply with the laws, acts, and policies. Public officials advise politicians on almost everything. From secretaries of ministries to the chairman and director generals are the ones who are leading the institutions and enforcing the acts, with the minister being the person responsible to ensure the function of a given ministry/institution. Often these officials have the power to change the course of a country, although they are the very group that is either supporting bad policies or promoting them. They are the very group that turns a blind eye to the very piece of legislation they must enforce.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*BndXFWHGLdwvmv5x9e_zFQ.png" /></figure><p>There won’t be any use in speaking the shortsighted actions of politicians because we have seen it enough over several decades. More specifically in the last 2 decades when it comes to environmental destruction. The most recent being President Gotabhaya Rajapakse and Basil Rajapaksha’s plan to convert state forests to farmlands and other development activities that could result in almost 500,000 hectares of forest cover loss. In addition, almost 100,000 acres of Mahaweli lands have been converted for various agricultural and development projects while over 1.5 Mn Land Reform Commission lands are left to loot by various politicians and individuals with either money, power, or connections. All of these are the precious public assets and national assets left to exploit with insane policies that have no rationale or scientific basis except formulated for purely political reasons.</p><p><strong>Did the previous lot do better?</strong></p><figure><img alt="" src="https://cdn-images-1.medium.com/max/625/1*KLtT6uEVm5IGIJPhCKRJMQ.png" /></figure><p>When it comes to environmental conservation the previous government was far better as it was both law-abiding and tight policy-driven for conservation. The former president put a tight grip on mining activities and never interfered when the law was enforced. He never blamed officials who did their job, rather questioned when regulators weren’t doing their job to conserve. During the previous government, Sinharaja was expanded from a mere 11,000 ha to 36,000 ha while plenty of new protected areas was gazetted including the Mavillu conservation forest. President Sirisena also gazetted 60 odd mangrove protected areas in one day trying to protect mangrove ecosystems going by the Zero Mangrove Deforestation Policy of the government. During the previous government, it was easy to push for enforcing the law. The political interferences were relatively low. The only major environmental concern during the previous government was its large reservoir projects from which a few we were able to stop with massive public protests such as the world bank funded 4 large reservoir projects in Kegalla District. These projects have been re-negotiated under the current government and it’s most likely that they will push for it all over again. Moragahakanda-Kaluganga, Malwathuoya, and Yan Oya are some of the other destructive projects that went ahead during the previous government. Often the Ministry of Mahaweli was the destroyer alongside the Ministry of Irrigation during the previous government where the secretary to Mahaweli back then act as the secretary of the ministry of irrigation today. Ironically, during the previous government Ministry of environment was also under the ministry of Mahaweli which we thought was a great conflict of interest. So all the Mahaweli projects under the Ministry of Mahaweli and Environment saw environmental clearances without any moderation or denial.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*U2QZCcYhesng0OXrEyVfgw.jpeg" /></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*8kwUzwQ2WdBrWCipb9OpHQ.jpeg" /></figure><p>During previous government pushing officials and regulators to do their job was easy because they had to face consequences otherwise. Either through a judicial process, through petitions and complaints. The judiciary during the previous government was by far more independent than what it looks like today except for a few notable judges who saw public interest cases/environmental cases as not so important cases. There were many ways we could push for action and policy during the previous government from district development committees to parliamentary committees where we were heard by the very top of the government (except the president, who singed and MOU with environmental organizations before the election and never saw them after getting elected. Thank god we were not a part of the MOU) in roundtables or face to face. In general, anything that comes to light through mainstream and social media was given due attention and someone was there to attend. At least the president in his speeches. Yahapaalanaya as a government was an utter failure. It failed those who had high hopes on a change miserably. But now we are learning under the current government the true meaning of massive failure. Failure to uphold the rule of law in every aspect of life from environmental laws to consumer laws to everything in between that matter to the public from breathing clean air, drinking clean water, eating healthy food to living in a good environment which is a fundamental right of every citizen. Even our national heritage, our land, and our marine space are in danger. There has never been a time where the system, specifically the law and order were this broke as long as I remember.</p><p><strong>What are at stake?</strong></p><p>Since the current government came to power, there have been thousands of incidents related to environmental destruction got reported. The majority are deforestation incidents while the next in order in terms of most incidents were on mining-related issues. Major deforestations or land-use changes can directly be attributed to the changes of land policies influenced by the ministers like Basil Rajapakse and S.M Chandrasena who very cunningly got the president to back them up in every disastrous move they made. President obliged by making various damaging statements both to himself and the environment that could later have significant consequences. The only beneficiaries of these policies and statements were the environmental criminals and land scammers who went on either grabbing/encroaching government lands or exploiting natural resources.</p><p>With the Covid Pandemic, the government showed how vulnerable the entire country is when tourism and foreign workers could not send dollars in. manufacturing alone could not compensate for the loss from the previous two key sectors. In addition, agricultural productivity needed to be enhanced to ensure food security. Instead of improving productivity and efficiency as usual the government went on the path of enhancing the arable land area by releasing more lands belonging to different government entities while the arable land area in Sri Lanka already exceeds 62% and the remaining forest cover is just around 17%.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/700/1*5mPBCQadg_1VkTS0eutR5g.jpeg" /></figure><p>When it comes to environmental resources, almost all types of resources and ecosystems were in great danger during the year 2021. Following are some of the key environmental resources and ecosystems that faced severe threats across the country during the year 2021.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/780/1*dhfUqTQx4YS7dNCvSgB0VQ.jpeg" /></figure><p>1) Land resource belonging to State, Forest Dept, Wildlife Dept, Mahaweli, Irrigation, dept of agrarian development LRC and plantations</p><p>2) Various policy changes and circulars relating to state lands and land development limiting conservation powers department of forest conservation had resulting thousands of acres being de-protected such as Wattegama kabalitta and forests in Kotawehera.</p><p>3) Changes in mineral mining license and permit issuing process that allowed both accelerated legal and illegal mining including mining activities in protected areas and riverine ecosystems</p><p>4) Allowing various foreign companies/parties and local agents of theirs to carry out mining REM or precious minerals illegally or with licenses issued in a corrupt/ad-hoc/without the due procedure being followed.</p><p>5) Deforestation of all types of forests (Private and government) including mangrove forests. Inaction and lack of enforcement of the national environment act.</p><p>6) Violating the soil conservation act by decimating hills and slopes including landslide-prone areas.</p><p>7) Catchment degradation and river degradation including the destruction of river buffer zones for either agricultural activities, construction of hotels/houses, or mining activities.</p><p>8) Violation of Coastal conservation act and ad-hoc developments (destructions) without due monitoring and regulation by both CCD and marine environment protection agency.</p><p>9) Express Peal incident that resulted in the largest marine disaster Sri Lanka ever faced. How the incident mismanaged and the relevant entities left the destruction of marine ecosystems to escalate without ensuring the damage is controlled at the outset when it was quite possible.</p><p>10) Plenty of degazetting and re-gazetting of protected areas that limited the area that was protected under various conservation agencies such as the department of forest conservation, department of wildlife, and central environment authority.</p><p>11) Escalation of Human-Elephant, Human Leopard, and Human-Animal Conflict due to degradation of habitats and encroachment of transit homes.</p><p>12) Escalation of unlawful methods of either killing or chasing away animals considered pests including but not limited to illegal fishing methods including the use of Dyna and snare traps or Hakka Patas when it comes to chena cultivation.</p><p>13) Continues degradation of Mahaweli Reserves including Managed Elephant Reserve and Victoria Randenigala and Rantambe managed by Department of Wildlife.</p><p>14) Degradation and development in the central hills including knuckles where forest lands are being converted to resorts or agricultural lands with political influence.</p><p>15) Filling up of wetlands paddy lands and low lands including agrigarian protected areas. Both UDA and SLLRDC projects (RDA too), as well as private fillings, are causing severe damage to flood regulation ecosystems in mostly residential/urban areas.</p><p>16) Construction projects/hotels and housing in sensitive ecosystems such as Hantana with and without the approval of UDA and local government bodies. Similar projects are done in Sinharaja Knuckles, Sri Pada Samanala, and in the buffer zone of national parks as well.</p><p>17) Letting people enter protected areas such as Flood Plains., knuckles, and other protected areas for cattle grazing, illegal tourism activities, Chena cultivation, or for harvesting forest products such as Cardamom without any regulation.</p><p>18) Promoting destructive mini-hydro once more with approvals given for formerly halted projects such as Athwelthota, Makeli Ella, and Ranukkanda mini-hydro projects.</p><p>19) Destruction of estuaries and lagoons for fisheries/aquaculture projects without any consideration to environmental services of such ecosystems.</p><p>20) Tank reservations are being violated repeatedly with no action taken by both departments of agrarian development and the department of irrigation.</p><p>21) Garbage dumping by local authorities to sensitive ecosystems including forests and wetlands continue to happen</p><p>22) Exploitation of natural water resources including underground water table</p><p>23) Air pollution remains still a big issue despite various regulations imposed for prevention. Emission tests are exempted for various state-owned vehicles while a large number of vehicle owners are faking emission reports for license renewal. Industrial emissions are not regulated enough making industrial zones and other scattered industries contributing to air pollution that result in a large health cost to the nation.</p><p>24) Soil degradation continues to happen due to the application of agrochemicals despite the ban while other chemicals and toxins such as battery waste, tire waste, hospital waste, plastic, and polythene waste are too dumped openly in many parts of the country.</p><p>25) Forest fires continue to burn down many forests annually. There is no prevention mechanism when it comes to forest fires that removes between 5000 to 10,000 acres of forests annually.</p><p>Above are just a summary of all the key issues when it comes to environmental destruction in Sri Lanka. They result in a massive loss of biodiversity as we hail our country to be a biodiversity hotspot. The economic value of these ecosystems is worth billions of dollars. Just that we have failed to assess the value of ecosystem services scientifically.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*pkR0az36ovYpBLj8Mc4zKA.jpeg" /></figure><p><strong>Did we try enough?</strong></p><p>As an organization, rainforest protectors did their best to bring about a lot of changes to the policies of the government. We had to end up filing cases against the government as we did never before. Altogether 3 appeal court cases had to be filed including the case against Circular 1/2020 which put 500,000 ha state forests in danger. We had a series of discussions with ministers concerned on conservation issues through which some of the destructive activities were curtailed.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*KU_gCe5gqM-cdH-E-YN0Yw.jpeg" /></figure><p>We got every level of regulatory and oversight bodies from the executive, legislature, and institution level to intervene in matters we thought our intervention was needed. In the case of many environmental issues, rainforest protectors played the role of whistleblower and let others take the campaign forward. This approach has resulted in plenty of organizations joining the cause and even leading it while we stay in the background. Only when our intervention is completely necessary throughout we took it till we see and end. We were the first to sit with the Walsapugala Farmers and moved on with plenty of other environmental organizations joining. We were the first to get involved at the top level when it comes to the Piduruthalagala apple farm matter where illegal roads were being carpeted with the blessings of a minister of the current government and got it halted. We were the first to always contact the ministers and heads of institutions when things go wrong for conservation. We were also part of the first-ever Human-Elephant Conflict-related discussion with the minister concerned, which was later handed over to a task force by the president. We are currently discussing the potential to strengthen the explosives act to ensure Hakka Patas are banned and strict punitive measures introduced against criminals.</p><p>The first big blow on this government when it comes to environmental destruction came from Rainforest protectors when we exposed that the 1.2 Km stretch of Sinharaja was to be cut for a road development project to Lankagama. The expose was so strong and impactful, the president had to visit the site himself where he ordered 1.2Km stretch through Sinharaja should not be touched. Despite all the drama and stunts to make it a political event, despite the damage that has been caused by unregulated construction work, we were able to stop expansion into Sinharaja when the road was carpeted. It was simply unnecessary. The government tried so hard to justify the road construction with its full potential, but those who understand that ecosystem know how badly this entire project will impact Sinharaja in the future.</p><p>We were able to stop dozens of sand mining permits, metal mining activities, and soil permits issued to many different parts of the country. Some of which keeps coming back like the 5 mining permits issued to TukinHam Estate in Ruwanwella where we had to keep on protesting and use all resources at our disposal to protect the precious ecosystem.</p><p>When it comes to land grabbing, plenty of LRC land grabs in Eastern Sinharaja were thwarted with the members of our Rainforest Protectors Eastern Sinharaja Branch, who keeps a close eye on land grabbing adjacent to Sinaharaja. We have reported plenty of such cases to the Criminal Investigations Department, Ombudsman, Auditor General, and other regulators. We conducted all stakeholder discussions on completing the acquisition process of the 2500 ha LRC lands previously vested with the forest department by CBK. Some of these lands are now in the process of completing government acquisition. Section 2 notices for some of these lands belonging to Godakawela and Kahawatta are already being issued while Kalawana and Kolonna are pending to be completed in due course.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/960/1*rJaFdmPzkgaWMhTeNTKfkg.jpeg" /></figure><p>We have done a few major exposes of how some previous LRC lands are being looted by LRC officials and politically connected individuals. These made headlines in national papers and national televisions. We wrote to every committee and regulator possible including COPE, which initiated an inquiry on LRC. We have handed over personally the details we possess to some of the trustworthy ministers and members of parliament to question the LRC. In the meantime, we have also complained to CID on the matter. Their investigations too are ongoing. Some of these LRC lands are the most precious ecosystems located close to places like Sinharaja, major catchment areas including central hills.</p><p>We have initiated a separate campaign to address the Human-Elephant Conflict and introduced a hotline number which is 078 666 666 6 as an alternative to the department of wildlife contact number which people who made complaints consider useless. We will use all available communication channels to promote this number and provide solutions to each HEC related issue brought to us by the public. It could be either in terms of research output, proposals, solutions, or at least through litigation to seek an actionable mechanism to address the growing HEC.</p><p>As always we did our bit by both protecting real acres of rainforests through Rainforest Protectors Trust and by reforesting real acres of forest lands. 15-acre reforestation with probably the country’s only drip-irrigated reforestation project was started in November. When completed a 25-acre plot will have 25,000 native tree species in it. This is in addition to the 20-acre reforestation project we are continuing in Rakwana hills.</p><p><strong>Our Strategy for 2022….</strong></p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*0aiStohCdWSXI0CYGL5cBg.jpeg" /></figure><p>We have realized that most of the work we did was not either planned well, selective or strategic in terms of the outcome. We get involved in hundreds of small matters that often could be corrected in a policy change or putting a system/mechanism in place. Instead, when we try to address cases on an individual basis, it does not only consume time and resources but also limits our capacity to thrive for national-level outcomes.</p><p>Therefore, our focus in 2022 will be focused on,</p><p>1) Policy changes by lobbying and working with the government. Use of all tools from parliamentary committees to DDCs.</p><p>2) Litigation to obtain orders preventing common environmental crimes that could be applied and used anywhere for similar issues</p><p>3) Creating local groups/task forces to address their environmental issues</p><p>4) Preventing destructive projects at the outset rather than trying to address when they are setup/operational</p><p>5) Getting many more protected areas gazetted</p><p>6) Use of technology to ensure efficient/effective conservation such as digitalizing paddy lands in the country, digitalizing mining permit details that can be obtained for any citizen of the public.</p><p>7) Proposing committees/task forces within the related ministers and departments to address specific issues.</p><p>8) Encouraging leaders to move into a land-based, species-based, or components-based conservation approach.</p><p>9) Dealing with officials responsible in a more strategic manner to ensure smooth enforcement of law</p><p>10) Promoting sustainability practices across sectors</p><p>We no longer can delay or wait till either the government or the institutions get it right. We need to push them to get it right. Whether it is through discussions, by litigation, or by forcing would depend on how cooperative these leaders and institutions are. This would mean even getting to the street and storming public offices. Conservation is by far the greatest challenge for the entire humanity. It determines the fate of entire humanity. It impacts our food, our water, our energy, and even our health. Natural disasters will ruin economies much worse than Covid19 did. Droughts, heatwaves, locus attacks, and floods can kill much more. For us in Sri Lanka, our environment is our strength. No matter how much we are indebted and how fast the rupee depreciates, we will always have water for free, good fertile soil to plant our food, and a livable environment where we don’t need A/Cs of fans to live, only if we protect our environment.</p><p>Therefore, our struggle in 2022 will be a tough one. A one that we must ensure the public wins. Not the politicians, not the corrupt officials, or the greedy businessmen. As citizens all of us have a common shared responsibility to live responsibly and sustainably conserving the resources we use while protecting our environment for us and future generations.</p><p>That fight will have to be fought very strategically because politicians, corrupt officials, and businessmen know how to manipulate the public. How to brand destruction as development. Also to brand conservationism and terrorism. Let us all unite to protect our pristine ecosystems in 2022.</p><p>Jayantha Wijesinghe</p><p>Rainforest Protectors.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=ed6f70baf4a" width="1" height="1" alt="">]]></content:encoded>
        </item>
    </channel>
</rss>