<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0" xmlns:cc="http://cyber.law.harvard.edu/rss/creativeCommonsRssModule.html">
    <channel>
        <title><![CDATA[Stories by Jeff Wolfe on Medium]]></title>
        <description><![CDATA[Stories by Jeff Wolfe on Medium]]></description>
        <link>https://medium.com/@jeffwolfeenergy?source=rss-5fee5a5a2704------2</link>
        <image>
            <url>https://cdn-images-1.medium.com/fit/c/150/150/1*5AtgO3zXBFLeEzMQXgr4CA.jpeg</url>
            <title>Stories by Jeff Wolfe on Medium</title>
            <link>https://medium.com/@jeffwolfeenergy?source=rss-5fee5a5a2704------2</link>
        </image>
        <generator>Medium</generator>
        <lastBuildDate>Fri, 27 Nov 2026 21:04:03 GMT</lastBuildDate>
        <atom:link href="https://medium.com/@jeffwolfeenergy/feed" rel="self" type="application/rss+xml"/>
        <webMaster><![CDATA[yourfriends@medium.com]]></webMaster>
        <atom:link href="http://medium.superfeedr.com/" rel="hub"/>
        <item>
            <title><![CDATA[Roadblocks on the way to fleet electrification]]></title>
            <link>https://jeffwolfeenergy.medium.com/roadblocks-on-the-way-to-fleet-electrification-b8c563101da7?source=rss-5fee5a5a2704------2</link>
            <guid isPermaLink="false">https://medium.com/p/b8c563101da7</guid>
            <category><![CDATA[electrification]]></category>
            <category><![CDATA[infrastructure]]></category>
            <category><![CDATA[electric-vehicles]]></category>
            <category><![CDATA[charging]]></category>
            <category><![CDATA[fleet]]></category>
            <dc:creator><![CDATA[Jeff Wolfe]]></dc:creator>
            <pubDate>Tue, 30 Mar 2021 15:59:48 GMT</pubDate>
            <atom:updated>2021-03-30T15:59:48.219Z</atom:updated>
            <content:encoded><![CDATA[<p>Conventional thinking regarding the electrification of transportation is that fleets will electrify first considering they primarily operate on an economic basis. Since analysts perceive electric vehicles as generally having a lower total cost of ownership (after vehicle incentives reduce the vehicle cost), the theory goes they will displace last-mile delivery and longer-haul diesel trucks faster than public adoption of light duty (passenger) vehicles.</p><p>However, even with an increasing supply of electric trucks, there are multiple economic and non-financial roadblocks to achieving this vision. These must not be overlooked.</p><figure><img alt="Fleet charging ranges from light duty (passenger cars) to medium and heavy duty trucks. All fleet charging sites face barriers." src="https://cdn-images-1.medium.com/max/1000/1*AdhcXWY8SZtUKPcW5goqVg.jpeg" /></figure><p><strong>A Typical Depot-Based Fleet Today</strong></p><p>To understand the roadblocks, it helps to understand the circumstances and characteristics of the typical depot-based fleet in America today.</p><p>· Depots sites are often not owned but leased for twenty years.</p><p>· These sites are designed to operate a gasoline or diesel-fueled fleet.</p><p>· Fleets are in the business of making money from their vehicles; they work to control and minimize risk from ancillary operations such as fueling. For larger fleets, where fueling is available onsite, the fueling system is usually owned and operated by a third party.</p><p>· Fleet depots are typically space constrained.</p><p>· Space is optimized against the maximum number of trucks; unused space does not generate revenue.</p><p>· Standard transshipment depots do not use a lot of electricity for their operations.</p><p>· Standard lights, air conditioning for a small office area, and perhaps conveyor belts only require a modest electrical service.</p><p>Now let’s start to compare this to the requirements for an electrified fleet.</p><p>Due to the time required for charging, even with fast charging, fleets of any size should have their electric refueling accomplished onsite. But, there’s a big problem with typical depot sites today: The electric service to these facilities is often insufficient to charge a couple of vehicles while maintaining other operations.</p><p>What will it take to provide onsite charging to existing depots?</p><p><strong>Electrification of Fleet Facilities</strong></p><p>Following the traditional route to fleet electrification, a fleet would first pilot two to ten vehicles for some time. Even if the fleet has national experience with electric vehicles, the local operations will need time to adjust their operations and train their drivers. While mostly beneficial, there are differences between driving and operating a fossil-fueled vehicle versus an electric one. But there’s a big hurdle before even getting to this point: Typical depots have insufficient electric service to charge vehicles onsite even at this initial pilot stage.</p><p>A grid upgrade is required. Depending on the size of the upgrade, state, utility company, and exact location, <strong><em>this upgrade can take nine to eighteen months or longer</em></strong>. The cost of the upgrade is either borne by the customer or deferred based on guaranteeing the utility the number of vehicles charged over the next ten years.</p><p>It is hard to overstate how much of an enormous risk it is to guarantee the number of vehicles that will use a site over ten years. In addition to all the normal economic issues, add in an inability to predict future incentives, electric vehicle availability, and costs. Few fleets are willing to roll the dice and commit to a major upgrade, knowing that they will be required to pay for an underused electrical improvement if they do not meet their vehicle commitments.</p><p><strong>The Lease Duration Dilemma</strong></p><p>A huge variable to consider in this equation is that fleet owners are unwilling to pay for infrastructure upgrades on leased property after their initial occupancy. Once the twenty-year lease has less than twenty years left, they no longer have sufficient time to amortize their investment, and will not make permanent upgrades. Since the utility work can take well over a year, this further decreases the amount of time for amortization. And once the pilot is successfully completed, the fleet faces another electric service delay and commitment risk for moving to a higher degree of electrification.</p><p>Just imagine a fleet that starts the process of electrifying their fleet with twelve years left in their lease. They receive the electrical service upgrade in a year, pilot for a year, and apply for a larger upgrade which takes a year and a half. By the time they receive that upgrade, they will have 8.5 years left on their lease, far too short a time to consider implementing the program at that site. Since real estate leases are rarely longer than twenty years, it makes sense that the average duration left on leases is less than ten years. That means for the average fleet, the economics of electrification do not make sense due to the time and commitments required for utility upgrades.</p><p>Those fleets that can overcome the barrier of electric service size and upgrades still face the burden of greatly increased utility electric demand charges. These charges, based on peak use, can increase the electric bill by 50%, and thus the cost to fuel vehicles. This increase can make or break the economic value proposition.</p><p><strong>Onsite Construction</strong></p><p>Finally, for fleets that overcome the utility service cost and timing and the burden of demand charges, a significant barrier is the physical construction of charging infrastructure. Any infrastructure that takes up more space than the existing fueling infrastructure will negatively impact operational scale. And any construction that requires shifting of fleet operations for any period of time will also negatively impact revenue.</p><p>Typical infrastructure includes a medium voltage substation to handle the increased power requirements, distribution of the power to individual charging connectors across the site, and the placement of those connectors adjacent to (but not obstructing) vehicle parking lanes. An operational barrier also arises if the charging connectors are installed in a manner that is difficult to repair, as anything near a travel lane in a depot will suffer “vehicle strikes.”</p><p>To enable and accelerate fleet electrification, we must recognize and eliminate or minimize these barriers starting today. We need:</p><p>· Electrical service configuration to allow faster implementation of pilots.</p><p>· Methods to mitigate demand charges.</p><p>· Construction methods and system designs to minimize cost and disruption.</p><p>· Systems that are either very inexpensive or can be removed at the end of a lease term to avoid wasted, short-term, infrastructure investment.</p><p>I will discuss options for achieving this goal in a future article. The EV charging infrastructure industry must get this right. The stakes are high. The future of electrification of transportation relies on solving these challenges.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=b8c563101da7" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Four minutes from a One Trillion Dollar catastrophe]]></title>
            <link>https://jeffwolfeenergy.medium.com/four-minutes-from-a-one-trillion-dollar-catastrophe-d70b86d55a46?source=rss-5fee5a5a2704------2</link>
            <guid isPermaLink="false">https://medium.com/p/d70b86d55a46</guid>
            <category><![CDATA[electricity]]></category>
            <category><![CDATA[renewable-energy]]></category>
            <category><![CDATA[texas]]></category>
            <category><![CDATA[reliability]]></category>
            <category><![CDATA[ercot]]></category>
            <dc:creator><![CDATA[Jeff Wolfe]]></dc:creator>
            <pubDate>Mon, 15 Mar 2021 14:25:10 GMT</pubDate>
            <atom:updated>2021-03-15T14:25:10.356Z</atom:updated>
            <content:encoded><![CDATA[<p>As reactions to my recent <a href="https://jeffwolfeemergy.medium.com/the-lone-star-state-doesnt-have-the-leadership-to-fix-its-energy-problems-alone-469abea1a86c">article</a> about the Texas blackout disaster has rolled in, it made me realize just how big a catastrophe we narrowly averted. It also has led to a bold idea of how we can solve a big piece of the problem, transition our electricity market to clean energy while increasing revenue, and firmly place Texas as the global clean energy leader.</p><p>First, let’s review what we avoided. The latest estimates indicate that economic losses from our seven-day cold weather spell already exceed $129 Billion. And the number keeps growing. For context, Hurricane Harvey, the largest previous economic disaster, was on the order of $20 Billion (2021 dollars). One hundred and twenty-nine billion dollars in seven days and the grid did not even collapse across Texas.</p><p>According to the people who were managing the grid during the crisis, Texas was four minutes away from a complete shutdown of the ERCOT grid. If that were to happen, those same people say it takes weeks to restart the grid. Weeks when about 26.8 million people (90% of the state is served by ERCOT) would have had little or no light, heat, refrigeration, water, or communication, leading to starvation, violence, uncontained fires, martial law, and destruction of the $1.9 Trillion Texas economy. And the impact would not stop at the border. Texas is the largest exporter in the US. The hit to the US economy would also have been staggering. The event would probably have made the terror of Covid seem mild.</p><p>We avoided this outcome, this time, by four minutes. Four. Minutes. But since that does not appear to be enough to change how Texas runs its electric market, how do we inspire our political leadership to recraft our energy system to remove the potential for a recurrence? In the words of our single remaining PUC Commissioner, Arthur D’Andrea, when asked why the PUC overrode the automatic market price during the crisis, “The market was killing people in their homes.…” The status quo is untenable.</p><p>One way to prevent a repetition is to dramatically overbuild solar, wind and storage to a level of 4 to 6 times what would normally be required to power the entire Texas grid 24/7, such that even with light winds and overcast skies, sufficient energy is available to power the state. Of course, this over-building is expensive because under normal conditions, much of it will be curtailed, and in the Texas market, curtailment means no revenue. So, there is no economic motivation to overbuild in this manner.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/768/1*2f2hW_qqz5llMEOxTLdAuA.png" /><figcaption>Texas can open much larger electricity markets for export of our abundant in-state renewable energy generation, while securing our own supplies</figcaption></figure><p>However, if we could find a way to sell the excess energy into another market, then we could sell it when we did not need it and reserve it for ourselves when conditions require. But because the ERCOT grid is an “island,” not connected to other markets, we do not have access to other markets to sell the excess power.</p><p>A similar situation existed back in the mid-2000s. Developers wanted to build wind in west Texas, a wind-rich area at that time with little population or electricity use. Because little power was used in the area, there were no major transmission lines to bring electricity generated in west Texas to the population centers. But because wind promised to be plentiful, reduce the cost of energy, and keep energy dollars in Texas, then-Governor Rick Perry supported a multi-billion-dollar plan to construct large high voltage transmission lines across the state to open west Texas wind to development. The lines were built, and Texas now has more wind than any other state (and solar is coming on strong). It has been a staggering success, though Governor Perry no longer supports it due to changes in ideology, despite the economic boom it continues to create.</p><p>Today, the idea of connecting the islanded ERCOT grid to the Eastern or Western Interconnection (the transmission grids that respectively serve the eastern and western halves of the US outside of Texas) is ideologically anathema to Texas leadership. They would rather Texans suffer than connect outside of Texas since that would result in Texas falling under federal FERC jurisdiction. But imagine that Texas did connect. Then wind and solar could be built in west Texas and many other locations to levels four, six or even eight times what Texas normally consumes. And whatever Texas was not using at any given time could be exported. Texas could expand our existing energy export business with a clean electricity export business, creating many great paying jobs, a secure and reliable Texas-powered electric system and a path for the energy transition.</p><p>Texas leadership should implement this to not only protect our historically low energy prices while also protecting a business-friendly environment that requires a firm electricity supply, but also to create a new energy market worth tens of billions of dollars. Not to mention, doing this would ensure we never come close to being four minutes away from total grid failure, and freezing people in their homes, again.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=d70b86d55a46" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[The Lone Star State Doesn’t Have The Leadership To Fix Its Energy Problems Alone]]></title>
            <link>https://jeffwolfeenergy.medium.com/the-lone-star-state-doesnt-have-the-leadership-to-fix-its-energy-problems-alone-469abea1a86c?source=rss-5fee5a5a2704------2</link>
            <guid isPermaLink="false">https://medium.com/p/469abea1a86c</guid>
            <category><![CDATA[electric-generators]]></category>
            <category><![CDATA[reliability]]></category>
            <category><![CDATA[texas]]></category>
            <category><![CDATA[electricity]]></category>
            <category><![CDATA[power-outage]]></category>
            <dc:creator><![CDATA[Jeff Wolfe]]></dc:creator>
            <pubDate>Wed, 10 Mar 2021 18:15:05 GMT</pubDate>
            <atom:updated>2021-03-10T18:15:05.475Z</atom:updated>
            <content:encoded><![CDATA[<p><strong><em>The Lone Star State Doesn’t Have The Leadership To Fix Its Energy Problems Alone</em></strong></p><p>I live with my 90-year-old parents in Houston, in a single-family home. As a family, we’re advantaged when compared to many Houstonians. A few weeks ago, we experienced life-threatening conditions caused by what can most charitably be described as short-sighted physical and financial market design. If I set charity of description aside, Texans suffered and died because of purposeful, short- and long-term gaming of our electrical system and markets.</p><figure><img alt="Satellite images of Houston before and after the storm. The dark areas in the latter image depict areas left without electricity." src="https://cdn-images-1.medium.com/max/416/1*jRFCsXUEkNWAqu7pNBJmfw.jpeg" /></figure><p>Lone Star state residents were pawns in an ideology- and greed-based game played by our politicians that the big utilities have long supported.</p><p>Fortunately for my family, we made it through unscathed. We have a solar and battery storage system on our house. The battery was able to keep our air handler running enough for our gas heat to keep the house at 50 degrees and the refrigerator on. Bundled up and in reasonably good health, my parents survived.</p><p>Too many others did not. Adults and children literally froze to death in their homes in Houston and Austin.</p><p>What was it like to endure four days of power outages? Lonely and terrifying. Until now, I’ve been privileged enough that I have never faced a situation out of which I could not walk, drive, or fly. I learned the hard way the reality faced by most people in our society who do not have that same ability to leave a bad situation. In household after household, people were faced with deciding whether to freeze or risk exposure to COVID in crowded shelters, warming centers or homes of neighbors, some burning their furniture for heat.</p><p>Over the four days of the Texas electricity catastrophe, we lost internet and cell service part of the time. But in many ways, that did not matter. There was no useful information being provided. Nothing approaching effective crisis communication. Normally, I get incessant weather, abduction, and other texted alerts. But between Monday, February 14 and Thursday, February 18, the days of semi-continuous power outages, I received just three text messages. Two warned me about freezing weather, and one notified me to boil my water. Ever tried boiling water with an electric stove in a power outage?</p><p>What they did not tell me was:</p><ul><li>When the power would come back on.</li><li>When the power would go off again.</li><li>How to drain my water pipes so they would not freeze.</li><li>That water pressure was getting dangerously low and how to help keep it at a safe level.</li><li>When water pressure would return.</li><li>When the boil water order might be lifted.</li><li>Where emergency warming shelters were located — a scary idea during the pandemic, but better than freezing to death.</li><li>A number to call to find where warming shelters might be if I could not access the Internet.</li><li>Maps or other information about access to bottled water, food or other necessities within driving or walking distance.</li></ul><p>While Senator Cruz was boarding his plane to Cancun, Attorney Genal Paxton was attending meetings in Utah, and Governor Abbott was not to be found, millions of citizens had to guess at basic survival information.</p><p>Now, some libertarians might say that people should be prepared for this kind of event. But how were people already struggling during this recession supposed to stockpile for emergencies? How is it that we expect individuals to be able to do what our government and corporations have shown they are unable to do? Self-sufficiency is an important ethic, but it can’t be the sole public policy for emergencies.</p><p>As we sort through the information (and disinformation) after the blackouts, we learn that the Texas grid came within a few minutes of a complete collapse. That would have plunged the state into an electrical power and cellular communications blackout for, at a minimum, several weeks. Weeks where no hospital, ATM machine, fire department, cancer center, grocery store (except for H-E-B!), homes, businesses or police departments would have had power. Think about that for a few minutes.</p><p>The death toll from the sick and infirm, from violence — both criminal and vigilante — starvation, and accidents would have been unimaginable. We would have seen Martial Law imposed for far longer than the blackout period. The rest of the US economy would have staggered under the loss of Texas’ energy output.</p><p>Only the foolish will brush off this worst-case scenario. We came within minutes of having to live it, and elected leaders have to account for years of under-preparing in the face of ample warnings. We elect and pay these officials to run public infrastructure. Of course we don’t want them to infringe our rights, but their job is to ensure that the machinery of our modern civilization functions.</p><p>There’s no getting around the fact that Texas’s leadership failed disastrously, and they were within minutes of failing catastrophically.</p><p>What we got instead were pronouncements from politicians who were in full, “cover my butt” mode, blaming the Green New Deal for somehow causing their failures. This is ideology running away from reality. It’s stupid and does nothing to prevent Texas from experiencing such a catastrophe again.</p><p>As someone who has worked in the energy business for decades, including a tenure at Shell, I see a few foundational facts about what really happened. :</p><ul><li>When the power would come back on.</li><li>Central thermal (coal, gas, and nuclear) failed. Plants failed due to frozen valves, frozen coal piles, frozen controls and inadequate gas supply.</li><li>Natural gas fuel supplies failed. Pipelines froze. Compressor motors lost power. Wellheads froze.</li><li>Wind turbines froze. Wind turbine blades iced up, which caused them to cease operation. Wind speeds were (typical for winter) low.</li><li>Solar panels were not operating. It was nighttime.</li><li>About 14% of thermal generation was on planned outage and could not be brought back online in time for the crisis.</li><li>An unspecified amount of transmission line failed due to icing.</li></ul><p>Texas has a total of 107 GW of power generation. Of those, there were unplanned outages of 25 GW of natural gas plants, 6 GW of coal plants, 1 GW of nuclear plants, and about 3 GW of wind plants.</p><p>Anyone who would read those numbers would clearly see that thermal power plants, not renewables, caused the massive crisis and requirement to shed 20 GW (30%) of electrical load. But why did Governor Abbott, Rep Dan Crenshaw, former Governor and DOE Secretary Perry, Secretary of Agriculture Miller, and other “leaders” falsely claim that wind power was the main culprit? While people were freezing to death in their own homes, these elected officials decided to play politics with our lives, our businesses, and the state’s economic future by lying about the cause of the problem and seeking to misdirect action. We came within minutes of dispensing widespread loss of life, savaging Texas’ economy, and mauling the rest of the US economy.</p><p>Even still, the costs are staggering. Hurricane Harvey inflicted over $20 billion of insured damages on Texas. According to the Insurance Council of Texas, our elected officials’ negligence has inflicted a higher insured cost from the blackouts. Total insured and business losses are now estimated at $129 BILLION. Normally, that is about what we pay for four years of electricity in Texas. We incurred that expense, driven by costs of electricity and blackouts, in seven days.</p><p>And it’s not like these officials weren’t warned. For years, scientists have told us that weather patterns are growing increasingly extreme and varied.</p><p>Even as a person living in relatively advantaged conditions, I am shaken. Had we not had our own battery power backup system, my family could have seen a very different personal outcome. Far too many did.</p><p>Texas will now supposedly spend billions to “fix” the problem. Based on their past performance and their recent statements, our “leaders” will spend those billions on rebuilding the 20th Century, centralized power systems with 1950s technologies. They’ll waste the opportunity to address their decades of mismanagement by reverting to propping up the very systems that failed us. It’s a sure-fire recipe for continued failure, misery and economic destruction.</p><p>We shouldn’t let them try to solve this growing new problem with yesterday’s solutions. Get the power out to the distribution system. The solar array on my house was more reliable than the ERCOT grid and central generation. (In fact, we were feeding back into the grid at one point, providing $9/kWh power to the grid at a cost to the power company of $0.13/kWh.)</p><p>If we instead decide to use 21st-century technology to reimagine our electric power and energy system, we can have a cleaner, more reliable, decentralized energy system for the same price tag. No, we will not close all the fossil power plants in this decade. However, we can start the transition, and quickly make the system more resilient against the threats of extreme weather, hacking, terrorism and fuel shortages. And we can do this for a lot less than the $129 Billion in added expense which the current power system has burdened us with.</p><p>It is time for our politicians to stop the dangerous false tropes and work to lead us into a more secure, safe, and vibrant energy future. One where my family and all others can feel safe and secure, where people do not freeze or die of heat stroke in their homes. Where the air is safe to breath. Where good jobs in the energy industry are not simply retained but are multiplied. If Shell and BP now have the courage to take this path into the future, our elected officials surely can. After all, our lives will hang in the balance.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=469abea1a86c" width="1" height="1" alt="">]]></content:encoded>
        </item>
    </channel>
</rss>