<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0" xmlns:cc="http://cyber.law.harvard.edu/rss/creativeCommonsRssModule.html">
    <channel>
        <title><![CDATA[Stories by Shih-Lin on Medium]]></title>
        <description><![CDATA[Stories by Shih-Lin on Medium]]></description>
        <link>https://medium.com/@shihlin-chang?source=rss-29cccc6309c7------2</link>
        <image>
            <url>https://cdn-images-1.medium.com/fit/c/150/150/1*eRMYgVPRzEGAbQYe6v8hEQ.jpeg</url>
            <title>Stories by Shih-Lin on Medium</title>
            <link>https://medium.com/@shihlin-chang?source=rss-29cccc6309c7------2</link>
        </image>
        <generator>Medium</generator>
        <lastBuildDate>Tue, 24 Nov 2026 10:28:15 GMT</lastBuildDate>
        <atom:link href="https://medium.com/@shihlin-chang/feed" rel="self" type="application/rss+xml"/>
        <webMaster><![CDATA[yourfriends@medium.com]]></webMaster>
        <atom:link href="http://medium.superfeedr.com/" rel="hub"/>
        <item>
            <title><![CDATA[Study Note — Contractual Structure of an Offshore Wind Project (2)]]></title>
            <link>https://medium.com/@shihlin-chang/study-note-contractual-structure-of-an-offshore-wind-project-2-e5259e2a3947?source=rss-29cccc6309c7------2</link>
            <guid isPermaLink="false">https://medium.com/p/e5259e2a3947</guid>
            <category><![CDATA[offshore-wind-energy]]></category>
            <category><![CDATA[offshore-wind]]></category>
            <category><![CDATA[wind-farm]]></category>
            <category><![CDATA[energy-transition]]></category>
            <category><![CDATA[renewable-energy]]></category>
            <dc:creator><![CDATA[Shih-Lin]]></dc:creator>
            <pubDate>Wed, 05 Jun 2024 17:32:28 GMT</pubDate>
            <atom:updated>2024-06-09T05:40:26.169Z</atom:updated>
            <content:encoded><![CDATA[<h3>Study Note — Contractual Structure of an Offshore Wind Project (2)</h3><h4>Construction</h4><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*SLrqP4psrePbfO_2" /></figure><h3>Table of Contents</h3><h4><a href="#b543">Construction</a></h4><ol><li><a href="#f161">Construction Management Agreement (CMA)</a></li><li><a href="#ac87">Turbine Supply Agreement (TSA or TSIA)</a></li><li><a href="#9ba0">Other Construction Contracts</a></li><li><a href="#da6a">Grid Arrangement &amp; Grid Connection Agreement</a></li><li><a href="#f256">Insurance — Construction Phase</a></li></ol><h3>Construction</h3><p>Due to the complexity of the technologies involved in offshore wind projects, various contracts are necessary for the design, supply, installation, transportation, and vessel services for each key component. These components include:</p><ul><li>Wind Turbine Generators (WTGs)</li><li>WTG foundations</li><li>Export cables</li><li>Inter-array cables (IAC)</li><li>Onshore cables</li><li>HVDC equipment &amp; platform</li><li>Onshore civils</li><li>Offshore substations</li><li>Onshore substation</li></ul><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*DlltO9y8g929q0LC.png" /><figcaption>Source: Cisco — Renewable Generation Wind Farms: Enabling Green Technologies (<a href="https://www.cisco.com/c/en/us/solutions/collateral/design-zone/renewable-gen-og.html">link</a>)</figcaption></figure><p>Each component is typically contracted out to different specialized companies. To reduce interface risks associated with multiple contractors, specific provisions addressing these interfaces are included in the construction contracts. Contractors are chosen based on their proven relevant experience for each respective package. This selection process is reviewed by technical advisors for validation, ensuring confidence and comfort for all involved parties, such as lenders.</p><h4>Construction Management Agreement (CMA)</h4><p>In offshore wind projects, a multi-contracting strategy is typically employed because no single general contractor can naturally handle all scopes, such as WTGs, foundations, electrical systems, cabling, and marine construction work. Consequently, a Construction Manager can be appointed under the CMA to supervise the various construction packages throughout the entire construction phase. Also, the Construction Manager may be the Sponsor or a subsidiary of the Sponsor, with incentives to ensure the project is completed on schedule.</p><p>In this case, the Sponsor’s track record in developing comparable projects and access to a wide pool of experienced resources provide significant assurance for the project’s completion. Sometimes, the Construction Manager may sign a Secondment Agreement with specialized companies to provide additional resources to cover specific parts of the construction where the Construction Manager may lack expertise.</p><h4>Turbine Supply Agreement (TSA or TSIA)</h4><p>The TSA is one of the most critical contracts for offshore wind farms. It typically specifies the design, procurement, construction, erection, installation, completion, testing, and commissioning of the wind turbine generators (WTGs). Additionally, it can cover related components such as switchgear, navigation lights, wind farm control systems, and power and control cabling. Also, in some projects, the TSA Contractor is responsible for providing the installation vessels.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*_vXYDwl2SuqHeL7r" /></figure><p>The Sponsors must undertake significant due diligence regarding the TSA contractor’s experience with offshore WTGs and the technology design of the WTGs. Common terms included in the TSA are:</p><ul><li>Turbine Technologies</li><li>Base Case Contract Price</li><li>Commissioning Conditions</li><li>Certification / Delay Liquidated Damages (LDs)</li><li>Defect Warranty / Serial Defects Warranty (Reccurent Defects)</li><li>Serial Defects Protections</li><li>New Technology Protection</li><li>Power Curve Warranty</li><li>Ground / Weather Risks</li><li>Defect Notification Period</li><li>Contractor Performance Securities</li><li>Parent Company Guarantee (PCG)</li><li>Direct Agreement (e.g. with the Lenders)</li></ul><h4>Other Construction Contracts</h4><p>The following contracts will be signed with each contractor, typically before financial close, and reviewed by the Legal and Technical Advisors. These contracts include those for the Turbine Installation Vessel, Foundation Design, Foundation Supply, Foundation Installation Vessel, Inter-Array Cable Supply &amp; Installation, Onshore Civils, Onshore Substation, and more. A robust allocation of risks between the employer and the contractors is essential to ensure the Project is bankable.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*Ai8bRXGwS2UPzSyU" /></figure><p>Common key terms included in these contracts are:</p><ul><li>Contract Prices</li><li>Contractor Securities (e.g. PCG)</li><li>Ground / Weather Risks</li><li>Defects Liabilities</li><li>Delay LDs</li><li>Defects Notification Period (DNP)</li><li>Serial Defects</li><li>Limits on Liabilities</li><li>Interface Management</li><li>Walk-away Mechanism</li><li>Direct Agreement</li></ul><h4>Grid Arrangement</h4><p>The following describes the typical process of connecting offshore wind turbines to the grid:</p><ol><li>The power generated by the WTGs is transported via inter-array cables to an Offshore Substation Platform (OSP). At the OSP, the alternating current (AC) power generated by the WTGs is stepped up to a higher voltage for efficient transmission.</li><li>If the distance to shore is significant, the AC power is then converted to direct current (DC) for long-distance transmission. The high voltage direct current (HVDC) is transmitted via an HVDC export cable to the Onshore Converter Station (OCS).</li><li>At the OCS, the power is converted back to alternating current (AC) and subsequently transported via high voltage alternating current (HVAC) cables to the grid substation, where it is adjusted to match the grid requirements before distribution.</li></ol><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*ghGlRq1_fW23CcGh" /></figure><h4>Grid Connection Agreement (GCA)</h4><p>In many projects, a Grid Connection Agreement is signed with the transmission system operator (TSO) to arrange grid connection. This agreement typically transfers the responsibilities for financing, design, procurement, construction, and installation of the grid assets to the TSO. The GCA generally covers the following aspects:</p><ul><li>Location of the Point of Connection (POC)</li><li>Interconnection Voltage</li><li>Maximum Export Capacity</li><li>Equipment Procurement and Installation</li><li>Requirements for Grid Interconnection (e.g. short circuit protection and communication)</li><li>Time Schedule</li><li>Grid Connection Fees</li><li>Grid Constraints, Outages, and Curtailment</li><li>Bank Guarantees</li><li>Unscheduled Outages</li></ul><p>Grid arrangements can differ across countries. For instance, in the UK, grid connection can be structured by splitting into a Bilateral Connection Agreement and a Construction Agreement:</p><ul><li><strong>Bilateral Connection Agreement (BCA):</strong> The BCA is required for all types of direct connections to the transmission system and is signed with National Grid to outline the requirements under relevant codes. The BCA defines Transmission Network Use of System (TNUoS) tariffs, including wider tariffs and local tariffs, which are charged to recover the costs of building, owning, and maintaining the transmission system.</li><li><strong>Construction Agreement (CA): </strong>The CA accompanies the BCA throughout the construction period and outlines the required enabling and reinforcement work, key milestones, and costs associated with the connection.</li></ul><h4>Insurance — Construction Phase</h4><p>Insurance policies are essential during the construction phase of the project to safeguard against material damages caused by insurable risks. Generally, the Project works with its insurance advisor to create a package that meets the standards of recent precedent transactions in the market.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*Bo1QTpGn8wUiqyRg" /></figure><p>Below are some common insurance policies during the construction phase:</p><ol><li><strong>Construction All Risk (CAR): </strong>Covers the full reinstatement value with a loss limit based on the Estimated Maximum Loss (EML) study.</li><li><strong>Delay in Start-Up (DSU):</strong> Provides protection against revenue loss and additional costs during delays, which can be caused by factors such as shared port facilities among multiple projects.</li><li><strong>Construction Third Party Liability (CTPL):</strong> Covers any event of accidental bodily injury to any person or accidental loss of or damage to third-party property.</li><li><strong>Marine Cargo: </strong>Protects against loss or damage during shipment.</li><li><strong>Environmental Liability:</strong> Covers the Project’s exposure concerning site contamination, gradual pollution, or biodiversity damage.</li></ol><h3>Note</h3><blockquote><em>Thank you for being here, and I hope the article helps you in some way. If you have any thought or feedback, I warmly welcome you to connect with me for further exchange via </em><a href="https://www.linkedin.com/in/shihlin-chang/"><em>my LinkedIn</em></a><em>.</em></blockquote><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=e5259e2a3947" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Study Note  —  Contractual Structure of an Offshore Wind Project (1)]]></title>
            <link>https://medium.com/@shihlin-chang/study-note-contractual-structure-of-offshore-wind-projects-1-1ef6f687cbea?source=rss-29cccc6309c7------2</link>
            <guid isPermaLink="false">https://medium.com/p/1ef6f687cbea</guid>
            <category><![CDATA[renewable-energy]]></category>
            <category><![CDATA[project-finance]]></category>
            <category><![CDATA[offshore-wind]]></category>
            <category><![CDATA[wind-farm]]></category>
            <category><![CDATA[energy-transition]]></category>
            <dc:creator><![CDATA[Shih-Lin]]></dc:creator>
            <pubDate>Mon, 29 Jan 2024 22:28:44 GMT</pubDate>
            <atom:updated>2024-06-16T12:25:53.184Z</atom:updated>
            <content:encoded><![CDATA[<h3>Study Note — Contractual Structure of an Offshore Wind Project (1)</h3><h4>Debt &amp; Equity Financing</h4><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*fETQlkxvbxOejUHk" /></figure><p>An offshore wind farm’s success hinges on the effective orchestration of collaboration among diverse stakeholders. The key to achieving this synergy lies in a well-designed contractual structure that navigates interactions seamlessly across the project’s planning, construction, and operational phases. This entails recognizing all significant risks, assigning them to the party most capable of handling them, and ensuring that all reasonable downside scenarios are considered.</p><p>In this article, I will delve into the contractual framework that underpins offshore wind projects, offering an overview of the roles and purposes of each contract involved. While the specifics may vary from project to project, a classic and common scenario for offshore wind farm projects is presented here. It’s crucial to note that real-world projects can adopt more intricate and diverse structures tailored to meet specific needs and circumstances. Below we will go through each of the contracts commonly seen in a project.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*_mRke1_lz3yCyMEEggrauQ.png" /><figcaption><strong>Hypothetical agreement framework of an offshore wind project</strong></figcaption></figure><h3>Table of Contents</h3><h4><a href="#0bc6">Equity Investors</a></h4><ol><li><a href="#3622">Shareholders’ Agreement (SHA)</a></li><li><a href="#6d99">Share Purchase Agreement (SPA)</a></li></ol><h4><a href="#34c0">Debt Investors</a></h4><ol><li><a href="#d7bf">Facility Agreement (FA</a>)</li><li><a href="#bd14">Common Terms Agreement (CTA)</a></li><li><a href="#3d8e">Intercreditor Agreement (ICA)</a></li><li><a href="#512f">Security Agreement</a></li><li><a href="#409d">Guarantee Agreement</a></li><li><a href="#293c">Hedging</a></li><li><a href="#724d">Direct Agreement (DA)</a></li></ol><h4><a href="#6e17"><strong>Equity Funding Structure</strong></a></h4><ul><li><a href="#0a73">Base Equity</a></li><li><a href="#8b2e">Standby Equity</a></li><li><a href="#2329">Pre-Completion Revenues (PCRs)</a></li></ul><h4><a href="#7820"><strong>Debt Funding Structure</strong></a></h4><ul><li><a href="#d397">Generation Facilities</a></li><li><a href="#c58c">Transmission Facilities</a></li><li><a href="#65d0">Ancillary Facilities</a></li></ul><h3>Equity Investors: Sponsors &amp; Shareholders</h3><h4>Shareholders’ Agreement (SHA)</h4><p>In scenarios where a project company boasts joint ownership by two or more shareholders, the SHA plays a crucial role in defining the Sponsors’ (Shareholders’) commitments to infusing equity funding into the project at various stages. This includes delineating when and how these financial infusions happen — ranging from construction and operation phases to emergencies and cost overruns. Sometimes these terms are defined in the Equity Commitment Agreement or Shareholder Support Agreement.</p><p>The SHA includes the <a href="#6e17">structure of equity financing</a>, which is typically extended in the form of cash and shareholder loans or indirectly through guarantees. Such injections may take diverse forms, including upfront contributions, pro-rata installments aligned with debt schedules, or even back-end arrangements.</p><p>Below are some key terms that can be found in the Shareholder’s Agreement (or sometimes, Equity Commitment Agreement / Shareholder Support Agreement):</p><ul><li>Shareholders’ (and HoldCo’s) Obligations</li><li>Dividend Policies</li><li>Deadlock Matters</li><li>Decision-making</li><li>Share Transfer Restrictions</li><li>SPV Management</li><li>Credit Support for Shareholders’ Obligations</li></ul><h4>Share Purchase Agreement (SPA)</h4><p>Offshore wind farm developers strategically choose to divest their wind assets, often post-completion or following the final investment decision, as part of robust capital recycling and risk management strategies. The execution of an SPA not only infuses developers with fresh capital but also opens doors for diverse stakeholders keen on participating in the energy transition journey.</p><p>On the other hand, the sale of transmission assets also entails the formalization of a SPA. This is subject to regulatory oversight in some jurisdictions, to unbundle energy supply and generation from the operation of transmission networks for fair market competition.</p><figure><img alt="Illustration of transmission assets (Source: Transmission Investment)" src="https://cdn-images-1.medium.com/max/1024/1*DHPy4G_Mi3aCYVDa8WviSw.png" /><figcaption><strong>Illustration of transmission assets (Sources: </strong><a href="https://tinv.com/portfolio/"><strong>Transmission Investment</strong></a><strong>)</strong></figcaption></figure><p>Below are the examples of the key terms specified in the SPA:</p><ul><li>Definition of the Sale (Agreement of Sale)</li><li>Consideration</li><li>Condition Precedent</li><li>Pre-completion Undertakings</li><li>Purchaser Covenants</li><li>Purchaser Warranties</li></ul><p><strong>Offshore wind farm sale cases:</strong></p><ol><li><a href="https://orsted.com/en/media/news/2022/03/20220328503311">Ørsted divested a 50 % ownership stake in Hornsea 2 in the UK to a consortium comprising AXA IM Alts and Crédit Agricole Assurances</a>.</li><li><a href="https://equitix.com/news/ocean-winds-and-equitix-join-forces-into-moray-east-scotlands-biggest-operational-offshore-wind-farm/#">Equitix joins forces into Moray East, Scotland’s biggest operational offshore wind farm</a></li><li><a href="https://www.rwe.com/en/press/rwe-offshore-wind-gmbh/2023-12-05-triton-knoll-offshore-wind-farm-sale-of-transmission-assets/">Triton Knoll Offshore Wind Farm: Sale of transmission assets</a></li></ol><h3>Debt Investors: Lenders &amp; Hedging Providers</h3><h4>Facility Agreement (FA)</h4><p>The FA serves as a crucial document outlining the terms and conditions of a lending arrangement between Borrowers and Lenders. Within the framework of facility agreements, the following essential components are specified:</p><ul><li>Facilities, Purposes, Amounts, and Tenors (Maturity)</li><li>Availability</li><li>Repayment and First Repayment Date</li><li>Events of defaults</li><li>Conditions of Utilisation</li><li>Prepayment and Cancellation</li><li>Equity True Up</li><li>Equity Cure</li><li>Interest Payments and Period</li><li>Reserve Accounts</li><li>Cash Sweep</li><li>Distribution Conditions</li><li>Information Undertakings</li><li>Covenants (Financial &amp; Informaition, Affirmative &amp; Negative)</li><li>Cash Waterfall</li><li>Security</li><li>Fees (e.g. commitment fee, upfront fee, agency fee, security agent fee)</li></ul><h4>Common Terms Agreement (CTA)</h4><p>In offshore wind farm financing, where multiple facilities are often provided by different groups of lenders, the establishment of a CTA among borrowers, lenders, and other financing parties is standard practice. In projects with senior and junior debts, distinct Senior and Junior CTAs can be arranged for the respective Senior Lenders and Junior Lenders. The CTA sets out the terms and conditions that are common and apply to all tranches of debt to ensure that all lenders are on the same page and that there are no discrepancies or disputes that could arise between them.</p><p>For instance, the conditions and terms about Sharing among the Finance Parties (including Payments to Finance Parties), Changes to the Finance Parties, and Changes to the Borrowers are defined in the CTA to foster clarity and consistency among all parties.</p><h4>Intercreditor Agreement (ICA)</h4><p>An ICA delineates the connection between two or more lenders who are extending financial support to the same borrower. The primary goal of an ICA is to establish the rights and obligations of each lender, such as rights and ranking with respect to receiving payments, declaring defaults, granting waivers, enforcing security, and amending any of the financing agreements. The ICA also specifies how the Lenders collaborate if the borrower fails to meet their loan obligations.</p><h4>Security Agreement</h4><p>The Security Agreement functions as a contractual arrangement in which the Borrower(s) grant a security interest and pledge specified collateral (e.g. the Borrower’s assets) to secure the loan outlined in a Facility Agreement. When the Borrower defaults under the facility agreement, the proceeds from the sale of the pledged collateral can be used to satisfy the borrower’s obligations under the FA. Security Agreements thus offer the Lenders additional assurance of the repayment of the loans.</p><p>A typical security package includes the shares of the Borrower, subordinated shareholder loans, Borrower and Holdco accounts, and fixed &amp; floating charges. A suite of <a href="#724d">Direct Agreements</a> is also entered into with each counterparty in the Project (Contractors, PPA off-takers, CfD, SMA, etc.) specifying the consent to security.</p><p>Below are the common contracts for the security package:</p><ul><li>Bank Accounts Pledge Agreement</li><li>Receivables Pledge Agreement</li><li>Securities Account Pledge Agreement</li><li>VAT Account Pledge Agreement</li><li>Reserve Account Pledge Agreement</li><li>Shareholder Loan Pledge Agreement</li></ul><h4>Guarantee Agreement</h4><p>It’s common for lenders to seek an additional credit backup for the facility in the form of a guarantee. Guarantees allow lenders to directly turn to the guarantor if the borrower doesn’t meet its payment or other obligations outlined in the facility.</p><p>Also, in projects involving <a href="#e778">ECA financing</a>, ECAs provide guarantees to support commercial lenders in the event that the Borrower is unable to meet payment obligations under the Facility Agreement.</p><h4>Hedging Strategy</h4><p>In navigating the indexing of long-term revenues and interest payments, projects commonly employ derivative instruments to mitigate the volatility of fixed, extended-term figures. This strategic approach is instrumental in managing exposure to fluctuations in various areas:</p><ul><li><strong>Interest rates:</strong> Exposure under notional facilities amounts can be hedged through Interest Rate Swaps, helping to stabilize interest payments</li><li><strong>Foreign exchange:</strong> Future foreign exchange payment obligations can be managed through FX Rate Swaps</li><li><strong>Inflation: </strong>Revenues can be safeguarded against inflationary impacts via instruments like CPI Swaps</li></ul><p>Of note, the integration of hedging strategies directly links revenue and interest cash flows, potentially influencing the final debt amount.</p><h4>Direct Agreement (DA)</h4><p>Lenders can leverage a robust security framework through the execution of DAs between the designated Agent or Trustees and various stakeholders within the Project, such as TSA Contractors, EPC Contractors, PPA off-takers, and Shareholders, on specific consents and rights. The primary objective is to shield lenders from potential losses in the event of a default within a key contract entered into by ProjectCo, leading to the imminent threat of contract termination.</p><p>Key topics covered in the Direct Agreement include:</p><ul><li>Notice of Default</li><li>Suspension Period (Standstill Period)</li><li>Step-in Rights</li><li>Step-out</li><li>Novation of the Project Agreements</li><li>Consent to Security</li></ul><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*Qrl90tU_vFVQ-Hxm" /></figure><h3>Funding Structure — Equity</h3><p>Equity financing for an offshore wind farm is often segmented, with each category serving distinct purposes. The following outlines one of the funding structures for an offshore wind farm project.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*QAMIrcpS0CgvAaNo_iGxIg.png" /><figcaption><strong>Illustrative Financing Structure of an Offshore Wind Project</strong></figcaption></figure><h4>Base Equity</h4><p>The Base Equity commitment within an offshore wind farm project can manifest in various forms, including cash equity, equity bridge loans, or shareholder loans. Paired with the Base Debt, it serves as a fundamental financial pillar, covering essential cost elements such as Base Capex, Base Contingency, operating costs during construction, and financing expenses.</p><p>The Base Equity commitment can primarily be structured in the following ways with injections occurring either before or proportionally with debt infusion, as lenders typically avoid a scenario where debt is injected first:</p><ul><li><strong>Upfront equity: </strong>Equity contributions are a prerequisite before the initial utilization of debt facilities. A condition precedent is set, requiring each shareholder to make equity contributions equal to or exceeding their Base Equity Commitment before the debt facilities can be accessed.</li><li><strong>Pro-rata: </strong>Equity is injected proportionally alongside the debt facilities. This means that the equity contributions align with the utilization of debt, providing a balanced and synchronized approach to project financing.</li></ul><h4>Standby Equity</h4><p>In conjunction with the Base Contingency, which can be prudently addressed within the Base Case funding, the Project may incorporate an extra standby contingency budget. This additional fund, endorsed by the technical advisor, is designated to handle unforeseen capital expenditures. The standby contingency budget is further supported by Standby Equity and Debt Facilities.</p><p>The determination of the Standby Equity commitment amount involves applying a specified Debt/Equity ratio (such as that established at Financial Close) to the Standby Contingency Budget. Standby Equity can be contributed to cover any funding shortfall, such as a Pre-Completion Revenues shortfall. This contribution may follow an equity-first approach or a pro-rata basis with Standby Debt, and it is often backed by a Parent Company Guarantee or Acceptable Credit Support.</p><h4>Pre-Completion Revenues (PCRs)</h4><p>In certain project structures, PCRs can be considered as equity contributions to address the project’s costs. The sizing of this amount is often determined based on specific power and price projections, such as the Low Case Projections set by the market advisor.</p><p>When discrepancies arise between the PCRs outlined in the Debt Sizing Case and the Base Case, or between actual PCRs generated and Base Case PCRs, the Sponsor may need to provide additional commitment or credit support. This additional commitment can be covered by Supported PCR (Additional Base Equity) or sometimes Standby Equity &amp; Debt. Serving as a financial cushion, it bridges gaps between projected and actual PCR amounts, ensuring ample resources are available to meet the project’s financial requirements.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*JBwu1AJi1zAd82XzOupQ6Q.png" /><figcaption><strong>Scenario: Actual PCR &gt; Debt Sizing PCR</strong></figcaption></figure><h3>Funding Structure — Debt</h3><h4><strong>Generation Facilities</strong></h4><p><strong>Generation Term Loans: </strong>These facilities are expected to be repaid by the power generation of the Project and thus can be sized, for instance, based on the CfD contracts and PPAs.</p><p><strong>ECA Facilities:</strong> These facilities are covered/guaranteed by the ECA, typically at 90% ~ 100% of exposure for offshore wind projects.</p><p>For instance, <a href="https://www.txfnews.com/articles/7595/eca-collaboration-in-hai-long-offshore-wind-pays-off">ECA financing comes as a risk mitigant for Taiwan’s Hai Long Offshore Wind Project with the support of seven ECAs</a>, including Nippon Export and Investment Insurance (NEXI), and Japan Bank for International Cooperation (JBIC).</p><ul><li><strong>ECA-backed Financing: </strong>ECA plays an important role in financing offshore wind projects across the globe, covering political/local counterparty risk and/or providing a substantial portion of the contingent funding to the project, thus justifying its mission of supporting exports as the sector usually involves international technologies, equipment, and suppliers. The ECA financing increases the diversity of funding and allows commercial banks to be more comfortable taking risks.</li></ul><h4><strong>Transmission Facilities</strong></h4><p><strong>OFTO Term Loan / OFTO RCF: </strong>These facilities are expected to be repaid upon the OFTO sale with a buffer for any unexpected delays to the OFTO sale process. As described above, this is required by the regulatory bodies, mandating the separation of energy supply and generation activities from the operation of transmission networks to promote equitable competition in the market.</p><h4><strong>Ancillary Facilities</strong></h4><p>Several ancillary facilities serve diverse purposes in supporting an offshore wind project:</p><ul><li><strong>Standby Debt Facility: </strong>Designed to address contingency construction costs</li><li><strong>Debt Service Reserve Facility:</strong> Acting as a buffer for future debt services, for instance, peak 6-month expected debt service amounts</li><li><strong>VAT Facility:</strong> Devoted to funding reimbursable amounts associated with Value Added Tax arising during construction</li><li><strong>Letter of Credit Facility (LC Facility):</strong> Supporting the Project’s liabilities under construction and operation phases</li><li><strong>Revolving Working Capital Facility:</strong> Covering the working capital and credit support needs of the Borrowers</li></ul><p>These ancillary facilities collectively contribute to the robust financial framework of the offshore wind project, offering strategic coverage for various contingencies and financial requirements throughout its lifecycle.</p><p>In the upcoming article, we will delve further into the contracts associated with the construction and operation of an offshore wind project. Stay tuned for a deeper exploration of these crucial stages of wind energy development!</p><h3>Note</h3><blockquote><em>Thank you for being here, and I hope the article helps you in some way. If you have any thought or feedback, I warmly welcome you to connect with me for further exchange via </em><a href="https://www.linkedin.com/in/shihlin-chang/"><em>my LinkedIn</em></a><em>.</em></blockquote><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=1ef6f687cbea" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Study Note  —  Value-add Strategy]]></title>
            <link>https://medium.com/@shihlin-chang/study-note-value-add-infrastructure-76ee89b63dfd?source=rss-29cccc6309c7------2</link>
            <guid isPermaLink="false">https://medium.com/p/76ee89b63dfd</guid>
            <category><![CDATA[value-add-strategy]]></category>
            <category><![CDATA[infrastructure]]></category>
            <category><![CDATA[infrastructure-investment]]></category>
            <category><![CDATA[private-equity]]></category>
            <dc:creator><![CDATA[Shih-Lin]]></dc:creator>
            <pubDate>Sun, 02 Jul 2023 17:40:35 GMT</pubDate>
            <atom:updated>2023-07-04T01:15:21.325Z</atom:updated>
            <content:encoded><![CDATA[<h3>Study Note — Value-add Strategy</h3><h4>A growing space pursuing PE-like returns in infrastructure investment</h4><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*4jeqqTAC0BhFE-mX" /></figure><p>Beyond the core and core+ strategies, which normally cover more traditional infrastructure assets with long-term contracted cash flows, such as public-private partnership (PPP), power generation &amp; distribution, and contracted renewable energy, one area that I found particularly intriguing during my last internship was the value-add strategy.</p><p>Recently, an increasing amount of infrastructure strategies have been veering towards higher-risk areas seeking risk-adjusted returns, specifically in a rising interest rate environment which poses a challenge to the relative attractiveness of super-core and core strategies. Value-add fund managers differentiate themselves from the core and core+ strategies by <strong>typically investing in companies rather than projects (SPVs)</strong>. They normally adopt an <strong>active value creation approach</strong>, which resembles classic private equity investments and introduces higher risks. However, these investments still maintain the fundamental characteristics of the infrastructure asset class. Prominent participants in this space in Europe include Partners Group, InfraVia Capital Partners, Antin Infrastructure Partners, EQT, and others.</p><p>During my last internship, I had the opportunity to participate in several transactions within the realm of value-added strategy. In this article, I want to delve into these projects and use examples to illustrate the infrastructure characteristics of these value-add projects, which differentiate them from classic private equity investments. The examples in the article are all drawn from the projects that I worked on or from the publicly available information found on the websites of private equity firms.</p><h3>Essential infrastructure</h3><p>The delivery of essential goods and services to society is a fundamental characteristic of the infrastructure asset class. For numerous infrastructure private equity firms focusing on value-add strategies, this aspect remains a critical factor. The target companies may also recognize the potential to make a substantial impact on current and future needs, such as driving the energy transition and promoting the development of a circular economy. Investing in essential infrastructure assets offers an extra layer of downside protection, as the demand for these services tends to be relatively insulated from macroeconomic fluctuations.</p><p>Examples of sectors/assets meeting this criterion include:</p><ul><li><strong>Social infrastructure</strong> (e.g. nursing homes, children day care facilities, education, veterinary care providers)</li><li><strong>Digital infrastructure</strong> (e.g. fiber telecom, data centers)</li><li><strong>Energy </strong>(e.g. renewable energy platforms &amp; developers, concentrated solar power (CSP) plants, district heating &amp; cooling)</li><li><strong>Transport </strong>(e.g. EV charging platforms, transportation equipment &amp; supply chain solutions, metro system operators)</li><li><strong>Environment </strong>(e.g. waste recycling services, wastewater treatment)</li></ul><p><em>Note: It is important to recognize that the risk profile can differ even among assets of the same type. For example, a developing-stage renewable asset carries higher risks compared to a brownfield renewable asset. Similarly, the risk profile of a renewable energy platform operating across multiple countries/technologies can vary from that of a project limited to a single country/technology.</em></p><figure><img alt="" src="https://cdn-images-1.medium.com/max/705/0*P5739zfG2Dhfus3N" /><figcaption>EdgeConneX, one of EQT’s portfolio companies (Source: <a href="https://eqtgroup.com/current-portfolio/edgeconnex/">EQT Website</a>)</figcaption></figure><h3>Resilient business model</h3><p>Anti-cyclical behavior, robust fundamentals, and resilience in adverse market conditions are key characteristics that a project in the value-add segment should exhibit.<strong> This quality aligns with the typical features of infrastructure assets</strong>, providing a layer of downside protection to weather market fluctuations and maintain stable performance.</p><h4>Example</h4><ul><li>During the COVID-19 crisis, <strong>a pharmacy chain was allowed to continue operating</strong>, as it was deemed to be an essential service, resulting in the pharmacy sector being one of the less impacted sectors.</li><li>An electricity distribution system operator (DSO) is immune to short-term changes in the economy since the majority of its revenues are calculated based on the <strong>Regulated Asset Value (RAV) methodology</strong> with no exposure to electricity delivery volumes or prices under the infinite-term and long-term rolling contracts.</li><li>High-tech private hospitals receive a substantial portion of their revenues from public and private health insurance companies as well as the government. These entities utilize <strong>a</strong> <strong>price adjustment mechanism</strong> to guarantee a minimum level of EBITDA margin, irrespective of any rise in labor costs, which constitutes a significant component of the hospital’s cost base.</li></ul><h3><strong>High entry barrier</strong></h3><p>High entry barriers, such as technological complexity or high capital expenditure requirements, can serve as safeguards against potential competition in a project. These barriers create obstacles and challenges that deter new entrants from easily replicating or competing with existing projects.</p><h4>Example</h4><ol><li><strong>Site procurement</strong>: For new players entering the Incinerated Bottom Ash (IBA) processing sector, securing ideal locations in proximity to their customers can prove to be extremely challenging.</li><li><strong>Significant upfront capex: </strong>The district heating and electric power distribution sectors involve significant upfront capital investments to establish the required infrastructure networks and operational capabilities.</li><li><strong>Technology requirements</strong>: New entrants in the Incinerated Bottom Ash (IBA) processing industry may face considerable challenges in achieving cost-efficiency and ensuring security of supply without access to specialized technology and a proven track record in the field.</li><li><strong>Regulated sector: </strong>The following are some instances of significant barriers of entry that are put in place by the authorities.</li></ol><ul><li><strong>Exclusivity:</strong> In certain countries, the governments grant pharmacies a monopoly as the sole authorized point of access for prescription drugs. This exclusivity prevents alternative channels, such as online markets, from posing a threat to pharmacies in the realm of prescribed drug distribution.</li><li><strong>Limited ability to grant permission</strong>: The pharmacy sector is subject to strict regulations imposed by national laws in some countries. Specific requirements dictate that a certain number of pharmacies must be established based on the population size, limiting the granting of permissions for additional facilities. Additionally, regulatory authorities may mandate that any new pharmacy be situated at a minimum distance from existing ones.</li><li><strong>Technical requirements:</strong> Certain countries enforce stringent requirements on digital security operators, demanding dense networks and robust monitoring capabilities. These strict mandates create significant barriers for new entrants attempting to penetrate the market.</li></ul><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*7zuHvUOpJmcgPLHk" /></figure><h3>Value creation potential</h3><p>Most asset managers employing value-add strategies seek to realize top-line growth and improve profitability within their portfolio companies. This involves closely collaborating with these companies throughout the ownership to, for instance, identify new opportunities and enhance operational management efficiency with accretive additional capital investment. To effectively implement this proactive management approach, private equity investors typically need to hold a control or co-control position in the companies.</p><h4>Example</h4><p><strong>1) Operational improvement</strong></p><ul><li>By implementing a centralized in-house logistics platform and leveraging AI solutions, pharmacies have the potential to enhance their EBITDA margin. These measures enable improved management of pharmacy assortment and stock levels. Additionally, direct procurement from suppliers can lead to enhanced gross margins through favorable purchasing conditions, facilitated by the larger scale and volume of purchasing.</li><li>Cybersecurity service providers can capitalize on the strong expertise of their sponsors in the digital sector to provide more tailored service offerings for various customer segments.</li></ul><p><strong>2) Organic capex roll-outs</strong></p><ul><li>An electricity distribution system operator (DSO) has identified potential capital expenditure investments for the next 10–15 years. These investments are aimed at enhancing its electrical peak capacity, driven by the increasing demands from new projects related to green hydrogen and the expansion of its clients’ networks.</li><li>An open-access wholesale network operator has developed a clear roll-out plan to transition its existing cable network to Fiber-to-the-Building (FttB) and subsequently to Fiber-to-the-Home (FttH). Concurrently, the operator plans to focus on greenfield roll-out initiatives in suburban areas where competitors have limited presence.</li><li>An electricity producer plans to undertake the conversion of its existing bagasse and coal generation facilities into biomass plants, a strategic move that aligns with sustainability goals.</li></ul><p><strong>3) Bolt-on acquisitions for platform expansion</strong></p><ul><li>A pharmacy chain has a well-designed bolt-on M&amp;A plan for acquiring adjacent pharmacies in the fragmented market. The goal is to capitalize on consolidation benefits such as a centralized purchasing platform and economies of scale.</li><li>With the commitment of additional equity injections from its sponsors, a power producer has the potential to expand its operations into new countries that have significant geothermal potential via acquisitions.</li></ul><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*bZseuk4CIgo67VzW" /></figure><h3>Predictable cash flows</h3><p>This is a typical attribute of infrastructure assets, often achieved through the implementation of mid to long-term inflation-indexed contracts with reputable counterparties.</p><h4>Example</h4><ul><li>A toll road project secures revenues through toll collection and a financial contribution from the state. The exposure to traffic risks for toll revenues is mitigated by<strong> </strong>an <strong>inflation-indexed tariff with a pricing adjustment mechanism</strong> to match seasonality (summer tolls are higher than winter tolls). The financial contribution <strong>guarantees the coverage of essential expenses</strong> (e.g. O&amp;M, debt services, tax).</li><li>A prominent educational infrastructure leasor leases over 90% of its asset base to <strong>AA+ municipalities</strong> through<strong> mid to long-term contracts</strong> with a <strong>strong track record of contract extensions</strong>, providing resilient and defensive cashflows.</li><li>In certain countries, pharmacies enjoy the advantage of a <strong>regulated margin</strong> for prescribed drugs, ensuring the sustainability of essential public services. Furthermore, the regulatory authority provides assurance that once a pharmacy license is granted, it cannot be revoked, ensuring <strong>perpetual authorization </strong>to operate a pharmacy.</li><li>Private hospitals in specific countries benefit from revenues backed by contracts with <strong>healthcare insurance companies and the government</strong> with very low counter-party risk.</li></ul><p>While value-add fund managers may have different focuses and criteria for target selection, the aforementioned typical features of infrastructure assets play an important role in the considerations. Understanding these features allows fund managers to identify opportunities and engage in active portfolio management, distinguishing themselves from the core and core+ segments. By utilizing their expertise and resources, fund managers actively contribute to the development and enhancement of vital infrastructure assets with the aim of generating higher returns.</p><h3>Reference</h3><ol><li><a href="https://eqtgroup.com/real-assets/eqt-value-add-infrastructure/#about">EQT Value-Add Infrastructure</a></li><li><a href="https://infraviacapital.com/infrastructure/">InfraVia — Infrastructure Strategy</a></li><li><a href="https://www.partnersgroup.com/en/businesses/private-infrastructure/">Partners Group — Private Infrastructure</a></li><li><a href="https://www.antin-ip.com/strategy/investment-criteria">Antin Infrastructure — Investment Criteria</a></li><li><a href="https://www.kkr.com/businesses/infrastructure/infrastructure-our-approach">KKR — Infrastructure Approach</a></li><li><a href="https://www.gsam.com/content/gsam/uk/en/institutions/strategies/explore-by-asset-class/alternatives/Alternatives-Infrastructure.html">Goldman Sachs Asset Management — Infrastructure</a></li></ol><h3>Note</h3><blockquote><em>Thank you for being here, the note helps me, and I hope it helps you in some way. If you have any thought or feedback, I warmly welcome you to connect with me for further exchange via </em><a href="https://www.linkedin.com/in/shihlin-chang/"><em>my LinkedIn</em></a><em>.</em></blockquote><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=76ee89b63dfd" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Study Note  —  ECA Financing]]></title>
            <link>https://medium.com/@shihlin-chang/study-note-eca-financing-5ce64c436396?source=rss-29cccc6309c7------2</link>
            <guid isPermaLink="false">https://medium.com/p/5ce64c436396</guid>
            <category><![CDATA[exporters]]></category>
            <category><![CDATA[export]]></category>
            <category><![CDATA[export-finance]]></category>
            <category><![CDATA[import]]></category>
            <category><![CDATA[project-finance]]></category>
            <dc:creator><![CDATA[Shih-Lin]]></dc:creator>
            <pubDate>Tue, 13 Jun 2023 09:51:40 GMT</pubDate>
            <atom:updated>2023-10-25T12:27:55.418Z</atom:updated>
            <content:encoded><![CDATA[<h3>Study Note — ECA Financing</h3><h4>Typical products provided by ECAs</h4><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*JSBzXWgf8OMT8bli" /></figure><p>Project Finance deals can take place across borders, requiring Export Finance and Export Credit Agency (ECA) Financing to facilitate their successful execution.</p><p>Aiming to promote national industries, ECAs provide guarantees or insurance to mitigate payment default risks. This facilitates banks in offering loans on favorable terms within complex jurisdictions. The Bank’s Export Finance involvement is significantly dependent on ECA support, making ECAs an essential party of cross-border projects.</p><p>Within this article, I outline several key ECA Financing options I have gathered from various ECAs such as <em>UK Export Finance</em>, <em>Export Development Canada</em>, <em>Euler Hermes, </em>and <em>Bpifrance Assurance Export</em>. These notes also stem from both my discussions with Export Finance experts and individuals employed within ECAs.</p><p><strong><em>Note:</em></strong><em> For the visual representations</em> <em>in this article, the color-coded boxes indicate the respective countries involved. Consequently, boxes sharing the same color represent entities within the same country.</em></p><h3>Buyer Credit</h3><h4><strong>1) Buyer Credit Guarantee (or Buyer Credit Insurance)</strong></h4><p>When a foreign buyer acquires goods or services from a domestic supplier, they may request Buyer’s Credit from a domestic bank to facilitate the payment for their purchase. To mitigate the risks involved, an ECA provides a guarantee to the domestic bank, covering a portion of the Buyer’s Credit value. This guarantee serves to reduce the risks assumed by the domestic bank in such transactions.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/839/1*CccBxEp6FmALoE5LHQK-Vw.png" /></figure><p><strong>Examples:</strong></p><ul><li>Bpifrance covers 95% of value via its <a href="https://www.bpifrance.com/storage/sites/7/2022/03/Buyer-Credit-Insurance_202105-1.pdf">Buyer Credit Insurance</a></li><li>UK Export Finance’s <a href="https://www.gov.uk/guidance/buyer-credit-facility">Buyer Credit Facility</a> covers up to 85% of the contract value</li><li>EXIM covers both commercial and political risks at 95% via its <a href="https://www.exim.gov/solutions/export-credit-insurance/multi-buyer-insurance">Multi-Buyer Standard Insurance</a></li></ul><h4><strong>2) Bill &amp; Note Guarantee</strong></h4><p>In scenarios where a foreign buyer procures capital goods, services, or intangible assets from a local supplier (exporter), the overseas supplier may issue a Bill of Exchange or a Promissory Note as a payment instrument.</p><p>To facilitate the process, a domestic bank can purchase the bill or note from the local supplier at a discounted rate, thereby obtaining future payments from the foreign buyer. In such instances, an ECA can provide a guarantee to the domestic bank, safeguarding the payment associated with the bill or note.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/897/1*oGMwY3ss5Sgv-5sEurIolw.png" /></figure><p><strong>Examples:</strong></p><ul><li>UKEF covers up to 95% of the value through the offering of <a href="https://www.gov.uk/guidance/bills-and-notes-guarantee">Bill &amp; Note Guarantees</a></li><li>EKF covers up to 90% via a <a href="https://www.ekf.dk/media/yobndvek/r15054_finansieringsgaranti_produktark_uk_web.pdf?v=638219153604084191#:~:text=A%20Financing%20Guarantee%20(bill%20of%20exchange)%20allows%20you%20to%20offer,main%20part%20of%20the%20risk.">Financing Guarantee (Bill of Exchange)</a></li><li>Finnvera covers up to 95% through the <a href="https://www.finnvera.fi/eng/financing/export-credit-guarantees/bill-of-exchange-guarantee">Bill of Exchange Guarantee</a></li></ul><h4><strong>3) Direct Lending Facility</strong></h4><p>Certain ECAs offer direct loans to foreign buyers, facilitated through an arranging bank. These loans aim to support the overseas buyer in their acquisition of goods and services from the domestic exporter.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/744/1*vSDCT0sXpxrMh6kjWLJccQ.png" /></figure><p><strong>Examples:</strong></p><ul><li>UKEF’s <a href="https://www.gov.uk/guidance/direct-lending-scheme">Direct Lending Facility</a> provides up to £200 million in 8 currencies</li><li>EKF provides financing for up to 18 years via the <a href="https://www.ekf.dk/en/ekf-s-guarantees/funding/export-loan">Export Loan</a></li></ul><h3>Supplier Guarantee</h3><h4><strong>1) Bond Support Guarantee</strong></h4><p>When a domestic exporter enters into a contract with an overseas buyer, the buyer may require a contract bond (or Performance Bond). In the case of a bidding selection process, this would be referred to as a Bid Bond. While the exporter’s bank is capable of issuing these bonds to the buyer, they typically demand collateral from the exporter in the form of a cash deposit to ensure the bond’s security.</p><p>To assist exporters in this situation, certain ECAs can provide a guarantee that covers a portion of the bond’s value. This guarantee enables the bank to release the cash collateral back to the exporter. The returned cash can then be utilized as working capital, enhancing the exporter’s operational capacity and optimizing efficiency.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/917/1*-dfAA4DHR4u6DjEX35R4Pg.png" /></figure><p><strong>Examples:</strong></p><ul><li>EXIM’s <a href="https://www.exim.gov/solutions/issue-performance-and-bids-bonds">Working Capital Loan Guarantee</a> can support US exporters to overcome the challenge of obtaining a bid or performance bond</li><li>UKEF offers <a href="https://www.gov.uk/guidance/bond-support-scheme-overview-and-how-to-apply">Bond Support Scheme</a> to banks in support of UK exports to help banks meet the demand for contract bonds</li></ul><h4><strong>2) Letter of Credit Guarantee</strong></h4><p>ECAs offer Letter of Credit Guarantees to safeguard the exporter’s bank against commercial and political risks linked to a confirmed Letter of Credit. This protection extends to risks associated with a foreign bank, as illustrated below.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*fuw-jt_FdhCGctuYeevmbQ.png" /></figure><p><strong>Examples:</strong></p><ul><li>The <a href="https://www.finnvera.fi/eng/financing/export-credit-guarantees/letter-of-credit-guarantee">Letter of Credit Guarantee</a> is one of Finnvera’s financing solutions.</li><li><a href="https://www.exportkreditgarantien.de/en/products/banks/singe-transactions/credit-confirmation-risk-cover.html">Credit Confirmation Risk Cover</a> is offered by the German Federal Government to cover the risks related to confirmed letters of credit</li><li>Bpifrance offers the <a href="https://www.bpifrance.com/products/letter-of-credit-confirmation-insurance/">Letter of credit confirmation insurance</a> covering banks against the risk of non-payment by the letter of credit-issuing bank</li></ul><h4><strong>3) Working Capital Guarantee</strong></h4><p>In situations where a domestic exporter faces additional requirements to fulfill large or high-value orders, they may seek a Working Capital Facility from their bank, which is tied to the contracts at hand. In such cases, ECAs can provide a partial guarantee to the exporter’s bank for the provision of the Working Capital Facility, mitigating the associated risks.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/714/1*bJhGFKIFPMAnUuUCQGzvOg.png" /></figure><p><strong>Examples:</strong></p><ul><li>UKEF offers an <a href="https://www.gov.uk/guidance/export-working-capital-scheme-overview-and-how-to-apply">Export Working Capital Scheme</a> to protecte UK lenders against the failure of the UK exporter to repay the Working Capital Facility</li><li>EXIM’s <a href="https://www.exim.gov/solutions/issue-performance-and-bids-bonds">Working Capital Loan Guarantee</a> can guarantee US exporter’s bank 90% of the Working Capital Loan</li><li>The <a href="https://www.afreximbank.com/products-services/our-key-services/guarantees/working-capital-guarantee-programme-workap/">Afreximbank Working Capital Guarantee</a> is a partial guarantee for the financial institution against the credit risks associated with working capital facilities for exporters, suppliers, Small and Medium-sized Enterprises (SMEs) involved in trade activities among others</li></ul><h4><strong>4) Export Guarantee</strong></h4><p>The Export Guarantee functions similarly to the <em>Export Working Capital Guarantee</em>, providing coverage for the credit risk faced by the export bank. The Export Guarantee is an ECA-issued instrument that protects the export bank against credit risk in situations where domestic exporters require Trade Finance Facilities. These facilities are utilized to support the exporters’ working capital or capital expenditure requirements.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/875/1*1a6vCRxnsZiQ3zyysTmgxw.png" /></figure><p><strong>Examples:</strong></p><ul><li>UKEF provides <a href="https://www.ukexportfinance.gov.uk/products-and-services/export-development-guarentee/#:~:text=We%20provide%20a%20guarantee%20to,to%20support%20your%20exporting%20needs.">Export Development Guarantee</a> to unlock the exporter’s working capital to invest in exporting</li><li>Finnvera’s <a href="https://www.finnvera.fi/eng/financing/export-credit-guarantees/finance-guarantee">Finance Guarantee</a> covers the risks associated with an export credit of an exporter’s bank</li></ul><h4><strong>5) Supply Chain Discount Guarantee (SCDG)</strong></h4><p>When a domestic exporter needs to fulfill payment obligations to its suppliers promptly upon invoice issuance, they may request an SCDG from their bank. In this arrangement, the exporter’s bank pays the suppliers on behalf of the exporter at a discounted rate and subsequently receives full payment from the exporter in the future.</p><p>To mitigate the risks involved in providing the SCDG, ECAs can offer partial coverage to the exporter’s bank. This coverage serves to minimize the risks assumed by the bank in offering the SCDG.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/726/1*5sO4oItjKaxcAGmUpdjdjA.png" /></figure><p><strong>Examples:</strong></p><ul><li>UKEF provides the <a href="https://www.gov.uk/guidance/supply-chain-discount-guarantee">Supply Chain Discount Guarantee</a> to help UK exporters access Supply Chain Finance (SCF) facilities</li><li>EXIM offers US lenders the <a href="https://www.exim.gov/solutions/working-capital/supply-chain-finance">Supply Chain Finance Guarantee</a> (SCFG) to assist the US exporters and their suppliers through accounts receivable financing</li></ul><h3>Insurance</h3><h4><strong>1) Export Insurance Policy</strong></h4><p>Certain ECAs offer Export Insurance designed to protect domestic exporters from various risks. These policies provide insurance coverage against the risk of non-payment for export contracts or the inability to recover costs incurred in fulfilling those contracts. Such risks may arise due to events such as buyer insolvency or political, economic, or administrative factors that impede payment in foreign currencies, among others.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/700/1*Eu9dteH4F0TEf1hJXpXH4w.png" /></figure><p><strong>Examples:</strong></p><ul><li>EDC <a href="https://www.edc.ca/en/solutions/insurance/credit-insurance/portfolio-credit-insurance.html">Portfolio Credit Insurance</a> covers for 90% of insured losses if the overseas importer doesn’t pay</li><li>UKEF provides an <a href="https://www.ukexportfinance.gov.uk/products-and-services/export-insurance-policy/">Export Insurance Policy</a> covering up to 95% of the potential loss</li><li>NEXI offers an<a href="https://www.nexi.go.jp/en/products/types/smes.html">Export Credit Insurance</a> for SMEs and AFF Sector</li></ul><h4><strong>2) Bond Insurance</strong></h4><p>In certain cases, the domestic exporter’s bank may be obligated to issue a bond to an overseas buyer or provide a counter-guarantee to the buyer’s bank on behalf of the exporter. ECAs offer Bond Insurance to protect against specific situations that may require payment demands. These policies provide coverage for various events, including certain political occurrences.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/793/1*JbM1R5CND-f3unmsxZ7BkQ.png" /></figure><p><strong>Examples:</strong></p><ul><li>Bpifrance offers <a href="https://www.bpifrance.com/products/export-bond-working-capital-insurance/">Export Bond Insurance</a> to protect the lender, in the event of a call of the bond by a foreign buyer</li><li>UKEF offers <a href="https://www.ukexportfinance.gov.uk/products-and-services/bond-insurance-policy/">Bond Insurance Policy</a> covering up to 100% of the contract value</li></ul><h4><strong>3) Overseas Investment Insurance (OII)</strong></h4><p>Some ECA offers OII to provide protection to domestic investors against potential losses arising from specific events (e.g. political events) associated with their investments in foreign countries. This insurance is particularly valuable in cases where the private market is hesitant to provide coverage due to challenging market conditions.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/862/1*-uqXQzoE_BM2oQh70ZDtCw.png" /></figure><p><strong>Examples:</strong></p><ul><li>UKEF provides <a href="https://www.ukexportfinance.gov.uk/products-and-services/overseas-investment-insurance/">Overseas Investment Insurance</a> covering up to 90% of the overseas investment</li><li>NEXI offers <a href="https://www.nexi.go.jp/en/products/types/investment.html">Insurance for investment</a> covering losses suffered by a Japanese company with its equity investments in a foreign country</li><li>Bpifrance’s <a href="https://www.bpifrance.com/products/investment-insurance/">Investment Insurance</a>, covering up to 95% of the investor’s loss, protects investors against risks of property damage and/or non-payment of amounts due to investors</li></ul><h3>Note</h3><blockquote><em>Thank you for being here, the note helps me, and I hope it helps you in some way. If you have any thought or feedback, I warmly welcome you to connect with me for further exchange via </em><a href="https://www.linkedin.com/in/shihlin-chang/"><em>my LinkedIn</em></a><em>.</em></blockquote><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=5ce64c436396" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Data Center Transformation with AI]]></title>
            <link>https://medium.com/@shihlin-chang/transforming-data-centers-with-ai-f86a4d03c566?source=rss-29cccc6309c7------2</link>
            <guid isPermaLink="false">https://medium.com/p/f86a4d03c566</guid>
            <category><![CDATA[infrastructure]]></category>
            <category><![CDATA[data-center]]></category>
            <category><![CDATA[artificial-intelligence]]></category>
            <category><![CDATA[digital-infrastructure]]></category>
            <category><![CDATA[ai]]></category>
            <dc:creator><![CDATA[Shih-Lin]]></dc:creator>
            <pubDate>Sat, 10 Jun 2023 10:26:36 GMT</pubDate>
            <atom:updated>2023-07-19T08:06:40.314Z</atom:updated>
            <content:encoded><![CDATA[<h4>The Interplay of AI and Data Centers</h4><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*7086rXgFmLILziGU" /></figure><p>Recently, Nvidia has garnered significant attention due to its remarkable market value surpassing the trillion-dollar mark, a feat shared by only eight other companies worldwide in history.</p><p>It was particularly captivating for me to hear Nvidia’s CEO, Jensen Huang, gave the speech at National Taiwan University (NTU), given that we are both from Tainan and that I graduated from NTU. During his speech, he expounded upon the transformative power of AI, discussing its potential to disrupt established sectors and foster the emergence of novel industries.</p><blockquote><strong>We are at the beginning of a major technology era, like PC, Internet, mobile, and cloud. But AI is far more fundamental, because every computing layer has been reinvented.</strong></blockquote><blockquote>— Nvidia CEO Jensen Huang at NTU Commencement Speech</blockquote><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*6o8vs4tkyZ5xuPCs.jpg" /><figcaption>Source: <a href="https://blogs.nvidia.com/blog/2023/05/26/huang-ntu-commencement/">Nvidia Blog</a></figcaption></figure><p>For instance, AI is at the core of autonomous systems, enabling them to learn, adapt, and operate independently while ensuring safety and productivity. Examples of such systems include self-driving vehicles and simultaneous localization and mapping (SLAM). Over the coming years and decades, it is anticipated that AI will play a pivotal role in implementing autonomous intelligent systems, specifically by replacing legacy IT and business processes that rely on predefined instructions.</p><blockquote><strong>“Automated systems tend to operate in black and white. Autonomous systems execute in more gray areas.”</strong></blockquote><blockquote>— <a href="https://query.prod.cms.rt.microsoft.com/cms/api/am/binary/RE4GmLb">Industry 4.0: Inside autonomous systems on the factory floor</a></blockquote><h3>Rising Demand for Data Centers</h3><p>As ChatGPT quickly approaches the impressive milestone of 1 million active users in just five days, we are propelled into an exhilarating new era of AI. Along with this wave of progress, there come notable challenges in terms of computational requirements and power consumption.</p><p>The increase in computational power is apparent as more businesses integrate AI into their operations. One such example is the utilization of <strong>generative AI</strong>, which includes large language models (LLMs) such as ChatGPT. These models rely on extensive training data to produce relevant and coherent content based on user input. OpenAI, the company behind ChatGPT, leverages the cloud solutions provided by Microsoft Azure to effectively meet the substantial computational requirements involved in these processes.</p><blockquote><strong>A single Google search can power a 100w lightbulb for 11 seconds. A single ChatGPT session consumes upwards of 50–100 times more power than a single Google search.</strong></blockquote><blockquote>— <a href="https://www.datacenterknowledge.com/machine-learning/data-center-ai-and-connectivity-are-next-big-disruption">In the Data Center — AI and Connectivity are the Next Big Disruption</a></blockquote><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*G8SwYo69ulGdXJqu.jpg" /><figcaption>Data centers of the Microsoft Cloud (Source: <a href="https://news.microsoft.com/de-ch/2021/06/10/new-offers-from-the-swiss-data-centers-of-the-microsoft-cloud/">Microsoft News</a>)</figcaption></figure><p>Likewise, <strong>autonomous vehicles</strong> contribute to substantial data generation through their employment of <a href="https://www.neonscience.org/resources/learning-hub/tutorials/lidar-basics">LiDAR sensors</a>, high-resolution cameras, and radar systems. Data collected from these sources serve not only for vehicle operation but also plays a crucial role in data centers where it is utilized to train increasingly advanced inferences.</p><p>As the demands for data processing increase alongside the widespread adoption of AI, data centers are required to manage storage, processing, and real-time analysis. Consequently, data center operators are actively engaged in developing innovative designs and solutions to meet these evolving requirements.</p><h3>Evolving Requirements for Data Centers</h3><h4>Computing Capacity</h4><p>As previously discussed, the growing potency of AI necessitates greater computational capabilities. This is exemplified by the upcoming generation of LLMs such as GPT-4, which are undergoing training on vast datasets with the objective of surpassing the milestone of one trillion parameters. Additionally, AI inference demands high performance and low latency for real-time user interaction. Data center operators are thus developing new computing solutions to meet these evolving needs.</p><p>In addition, the increasing range of use cases adds to the demand for expanded computing capacity. Generative AI, employed in creating texts, images, videos, and sounds, is set to drive more advanced applications like metaverse development. The escalating use cases and traffic, as evidenced by ChatGPT’s monthly visitors nearing 2 billion, necessitate data centers to optimize their capacity to efficiently address these requirements.</p><h4>Scalability</h4><p>Data center operators recognize the growing volume of data and the inherent volatility in demand, where the demand is not evenly distributed over time. Therefore, it becomes necessary to prioritize the scalability of data centers, enabling them to flexibly scale their resources based on customer requirements.</p><p>A scalable design allows for adaptable expansion, ensuring cost-effective capital expenditure in the long run. Typical data centers are designed to operate for 10~15 years, 2~4 times longer than the normal lifespan of IT equipment. Consequently, it becomes vital to develop a future-proof design that can effectively address the evolving power density demands associated with AI applications and workloads.</p><h4>Data Storage</h4><p>AI workloads heavily rely on swift data access and transfer rates from storage systems, making high-speed storage access a crucial factor. The ability to rapidly access data enables AI models to effectively read, write, and process data in real-time or near real-time, resulting in enhanced performance and minimal latency across various tasks such as training, inference, and data analysis.</p><p>Also, data center operators can gain a competitive advantage by catering to the diverse needs of various AI projects. Within these projects, different stages such as data collection, configuration, verification, model development, training, testing, inference, and data retirement often demand distinct requirements. These requirements range from faster access and low-latency storage to affordability and archival storage. Matching these needs with suitable and cost-effective storage infrastructure becomes vital for both data center operators and service users.</p><h4>Data Locality &amp; Proximity</h4><p>Data center operators are actively exploring innovative design approaches that facilitate data models and training directly within the data centers, a concept known as data locality. By embracing data locality, operators can enhance security while ensuring that data is stored and processed in close proximity to its origin or destination.</p><p><strong>This proximity provides several advantages in AI use cases, including reduced latency and improved performance.</strong> By optimizing data flow and enabling faster and more efficient operations, data locality ultimately results in enhanced performance and superior user experiences.</p><h4>Connectivity</h4><p>The demand for low latency and optimal responsiveness is increasing due to AI workloads, latency-sensitive cloud environments, and ML and AR/VR applications. AI workloads involve distributed matrix computations across CPUs, GPUs, and TPUs, requiring a high-capacity, error-free network.</p><p>Additionally, AI clusters and similar use cases drive bandwidth and capacity requirements, prompting data center operators to prioritize advanced networking solutions for efficient data transfer and seamless connectivity.</p><h4>Sustainability &amp; Energy Efficiency</h4><p>The integration of generative AI and machine learning neural network data models in data center operations entails significant <strong>power consumption</strong> compared to other computing types. Training LLMs, for example, demands substantial energy. Therefore, addressing the power-intensive nature of these operations is a crucial factor that requires appropriate solutions.</p><blockquote>According to OpenAI, <strong>GPT-2</strong>, which has 1.5 billion parameters, … <strong>consumed 28,000 kWh of energy to train.</strong> In comparison, <strong>GPT-3</strong>, which has 175 billion parameters, … <strong>consumed 284,000 kWh of energy to train</strong>, which is 10 times more energy than GPT-2.</blockquote><blockquote>— <a href="https://www.nnlabs.org/power-requirements-of-large-language-models/">Power Requirements to Train Modern LLMs</a></blockquote><p>Furthermore, the <strong>carbon footprint</strong> of data centers is a major concern for investors and service users. <a href="https://www.technologyreview.com/2022/11/14/1063192/were-getting-a-better-idea-of-ais-true-carbon-footprint/">MIT Technology Review</a> estimated that during training, OpenAI’s GPT-3 and Meta’s OPT released over 500 and 75 metric tons of carbon dioxide, respectively. Also, the choice of energy sources directly influences carbon emissions, with data centers powered by renewables emitting fewer compared to those reliant on fossil fuels. As the adoption of technologies like OpenAI grows, the environmental impact becomes more significant. Hence, improving the <strong>operational efficiency of data centers to enhance power usage effectiveness (PUE)</strong> is essential.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/796/1*tyUxQUw0wrbhM-5zHhFHxw.png" /><figcaption>Source: <a href="https://www.technologyreview.com/2019/06/06/239031/training-a-single-ai-model-can-emit-as-much-carbon-as-five-cars-in-their-lifetimes/">MIT Technology Review</a></figcaption></figure><p>Conversely, AI and ML can serve as valuable tools for capacity planning and resource allocation, contributing to enhanced efficiency in data centers. Furthermore, energy efficiency improvements not only promote environmental sustainability but also lead to reduced energy costs.</p><h4>Better Automation &amp; Alerting Systems</h4><p>The persistent challenge of skill shortages among data center operators is widely recognized, especially as service demands increase due to the incorporation of AI technology and the retirement of experienced staff.</p><p>Considering this situation, there is a pressing need for enhanced automation and monitoring systems. By implementing better automation tools, data center operators can alleviate the burden on their limited workforce and improve operational efficiency. Moreover, automation can help mitigate security vulnerabilities that may arise due to human factors.</p><h3>Solutions Incorporated in Modern Data Centers</h3><h4><strong>High-performance Computing (HPC)</strong></h4><p><strong>HPC clusters </strong>play a crucial role in data centers to facilitate AI applications and workloads. These clusters exhibit high server utilization rates and high power requirements, although typically with low availability requirements. HPC clusters comprise hundreds of thousands of interconnected servers through high-speed networks, enabling the aggregation of computing power and enabling <strong>parallel processing</strong>, thereby reducing training times.</p><p>In modern data centers, HPC systems are designed to be modular and scalable. This modular architecture enables seamless installation and capacity upgrades, ensuring efficient allocation of resources for AI applications and workloads.</p><p>When dealing with extremely high power density levels, <strong>dedicated HPC</strong> facilities come into play to execute large-scale and computationally demanding AI workloads. These specialized computing environments are purpose-built to handle the unique requirements of such intensive tasks.</p><h4><strong><em>Specialized Hardware</em></strong></h4><p>In modern computing systems, both the CPU (Central Processing Unit) and GPU (Graphics Processing Unit) play essential roles in powering various workloads, including AI applications.</p><p>The <strong>CPU</strong>, with its millions of transistors, is a vital component of modern systems, responsible for executing commands and processing tasks for computers, servers, and operating systems. It excels in various workloads, particularly those that require low latency and high performance per kernel.</p><p>In contrast, <strong>GPUs</strong> are specialized processors composed of multiple smaller kernels that can simultaneously process tasks, offering servers remarkable <strong>parallel processing</strong> and <strong>image processing</strong> capabilities. These GPUs are widely utilized for accelerating real-time AI workloads.</p><p>Besides, designated solutions like <a href="https://resources.nvidia.com/en-us-accelerated-networking-resource-library/datasheet-nvidia-bluefield?lx=LbHvpR&amp;topic=networking-cloud"><em>NVIDIA BlueField® data processing units (DPUs)</em></a> have been developed specifically for modern AI-enabled data centers and supercomputing, offering optimized capabilities to improve performance and efficiency.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*_MVCBhBgP3mr6sCl.jpg" /><figcaption>NVIDIA BlueField-3 DPU, a 400 Gb/s infrastructure compute platform (Source: <a href="https://resources.nvidia.com/en-us-accelerated-networking-resource-library/datasheet-nvidia-bluefield?lx=LbHvpR&amp;topic=networking-cloud">NVIDIA<br>BlueField-3 DPU Datasheet</a>)</figcaption></figure><p>For deep learning algorithms and real-time AI requirements, several cloud service providers also have developed their own custom chips alongside the widely adopted GPUs, such as <a href="https://cloud.google.com/tpu"><em>Google’s Tensor Processing Unit (TPU)</em></a>. These custom chips are designed to meet the specific needs of AI computations and deliver enhanced performance.</p><h4>High-capacity Storage Devices</h4><p>Data centers commonly employ high-capacity storage devices like <strong>hard disk drives (HDDs)</strong>, <strong>solid-state drives (SSDs)</strong>, and <strong>network-attached storage (NAS)</strong> to effectively store and handle vast datasets utilized in AI applications.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1000/0*TQNByCyur2R9jMF1.jpg" /><figcaption>Source: <a href="https://community.fs.com/blog/nas-vs-server-difference.html">NAS vs Server: Which Is Right for You?</a></figcaption></figure><p>In addition, there are storage systems tailored specifically for AI applications that fulfill the need for high capacity and low latency, such as IBM Elastic Storage System (ESS).</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/547/1*kgvW55nC2WeY6qZpTSY7pQ.png" /><figcaption>The ESS 3200 will deliver 80 GB/sec read sequential throughput under ideal conditions. (Source: <a href="https://www.ibm.com/downloads/cas/2OJ7ZYAZ">IBM</a>)</figcaption></figure><h4><strong><em>Networking Infrastructure</em></strong></h4><p>To meet the demanding workloads of AI,<strong> in-network computing</strong> is employed as a means of additional acceleration. This approach leverages existing devices within the networked system to perform computations, providing scalability and advanced technological capabilities. To facilitate efficient communication between distributed components, a robust networking infrastructure, for instance, with a capacity of 400 Gbps is utilized, ensuring smooth data transfer and seamless operation.</p><p>Besides, an increasing number of data centers are embracing the <strong>2-tier Spine-Leaf Architecture</strong>, wherein servers communicate in an East-West direction, rather than the conventional 3-tier architecture. This shift aims to achieve exceptionally low latency.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*jb7v5XbTyx8XOxq8bzRQkw.png" /><figcaption>East-West spine-and-leaf networks enable low-latency, optimized traffic flows for time-sensitive or data-intensive applications (Source: <a href="https://www.arubanetworks.com/faq/what-is-spine-leaf-architecture/">What is Spine-Leaf Architecture?</a>)</figcaption></figure><p>In addition, the deployment of a <strong>lossless AI fabric </strong>can foster effective connections of distributed infrastructure. This AI fabric integrates essential features like congestion control and bandwidth management, ensuring uninterrupted functioning of AI workloads. By achieving high throughput and zero packet loss, the lossless AI fabric significantly reduces the communication duration between HPC nodes, enhancing the efficiency of innovative services like AI training.</p><h4>Enhanced Power Density Solutions</h4><p>As AI and ML workloads become more prevalent, traditional data centers, which typically have a power density ranging from 4 kW to 6 kW per rack, are experiencing a consistent increase in power density due to the escalating data traffic and demands for computing power. In larger hyperscale data centers that cater to cloud service providers and large internet companies with complex IT requirements, power densification levels normally range from 10 kW to 14 kW per rack. And for newer extreme-density AI workloads, the power densification range is pushed even further, ranging from 20 kW to 40 kW per rack. In specialized computing operations, hotspot densities of 60 kW per rack or more are observed.</p><p>As AI continues to emerge as a dominant technology, these higher power densities are expected to become more prevalent. Facilities that are already built to accommodate the high-end of power density spectrum, supporting 50 kW per rack development, have a significant advantage in this regard.</p><h4>Scalable Designs</h4><p>In ABB’s White Paper “<a href="https://campaign.abb.com/modular_scalable_DC_whitepaper">Designing scalable, modular, digital data centers</a>”, four key design considerations for data center scalability were mentioned: electrical topology, equipment scalability, digitalization, and modular deployment. For a more comprehensive understanding of these concepts, please refer to the attached link above.</p><p>To enable scalability, various commonly used solutions include<strong> vertical and horizontal scaling</strong>, <strong>edge computing</strong>, <strong>Software-defined networking (SDN)</strong>, and the utilization of <strong>more powerful devices and scalable equipment</strong> such as Switchgear, uninterruptible power supplies (UPS), and power distribution units (PDU). Additionally, modern data center designs incorporate <strong>hybrid deployment of IT devices</strong>, accommodating different power densities to cater to the diverse needs of customers.</p><p>Furthermore, the <strong>power supply</strong> is another crucial topic in scalability. Data center operators acquire additional unused power capacity from their electric utility company to ensure a dependable energy supply for future expansion.</p><h4>Security Solutions</h4><p>In light of the growing complexity of data centers driven by a massive rise in data consumption, concerns regarding security, both physically and digitally, have intensified. In response, certain data centers prioritize the adoption of <strong>zero-trust security principles</strong>, which is a framework that emphasizes the elimination of implicit trust and the continuous validation of every stage of interactions.</p><p>In today’s data center infrastructure, advanced capabilities are essential to swiftly adapt security policies and effectively safeguard extensive data volumes. This entails utilizing <strong>dynamic and flexible policy actions</strong>, <strong>implementing streaming security operations</strong>, and <strong>ensuring efficient and responsive data protection measures</strong>. This approach serves as a means to enhance security and compliance while simultaneously reducing costs.</p><p>Furthermore, AI is also a useful tool for enhancing security. AI can analyze a data center’s physical design and location to assess risks like flooding and fires. Additionally, by learning network behavior and detecting anomalies in real-time, AI helps prevent major data breaches and hacks. <strong>AI cybersecurity tools</strong> are adopted to thoroughly analyze incoming and outgoing data, identifying security threats. Moreover, AI enables <strong>predictive maintenance</strong>, anticipating equipment failures before they occur.</p><h4>Cooling</h4><blockquote>In traditional corporate data centers (such as in banks, for instance), the PUE is often near 1.7. <strong>Cooling is less optimised </strong>and therefore accounts for almost 40% of the data center’s total electricity consumption.</blockquote><blockquote><em>— </em><a href="https://carbometrix.com/insights/what-consumes-the-most-energy-in-a-data-center/#:~:text=Cooling%20is%20less%20optimised%20and,data%20center&#39;s%20total%20electricity%20consumption.">What consumes the most energy in a data center?</a></blockquote><p><strong>1. Cooling needs are highly related to the power density</strong></p><p>The escalating power densification in data centers is accompanied by a significant increase in cooling requirements. Hotspots normally start to emerge when power densification levels exceed 30 kW per rack, requiring unique strategies like <strong>liquid cooling</strong>. At even higher power densities of 60 kW to 80 kW per rack, <strong>direct-to-chip liquid cooling</strong> becomes more prevalent.</p><p>However, the increasing power densification also brings about certain advantages. For example, when compared to installing multiple cooling systems for several lower power density racks with the same compute capacity spread out over a larger area, a single 50 kW capable rack can have similar power requirements but potentially lower cooling costs. This can result in overall gains in efficiency with higher-density deployments, as the power is concentrated in a smaller space.</p><p><strong>2. Cooling solutions</strong></p><p>The most basic two cooling systems in a data center are <strong>liquid cooling </strong>and <strong>immersion cooling</strong>.</p><p>i)<strong> Liquid cooling</strong> utilizes circulating liquids to remove heat from internal hardware electronics efficiently. This method can transfer large volumes of heat in small spaces, but <strong>it typically focuses on cooling the CPU or GPU</strong>. As a result, additional air conditioning is often required to cool other components, contributing to the overall cooling load.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*TKAuwlrG2Cx_pQbk.jpg" /><figcaption>Source: <a href="https://news.microsoft.com/source/features/innovation/datacenter-liquid-cooling/">Microsoft</a> (Photo by Gene Twedt for Microsoft)</figcaption></figure><p>ii) <strong>Immersion cooling</strong> goes beyond cooling just the CPU or GPU. It cools other components on the printed circuit board (PCB) or motherboard as well. Immersion cooling is gaining popularity due to its ability to support higher power density and achieve lower PUE in HPC environments. Unlike liquid cooling, which targets specific components, immersion cooling effectively lowers the temperature of the entire board where these components are mounted.</p><p>Also, there are other cooling methods such as close-coupled cooling, which places the air conditioner as close as possible to the targeted heat-generating unit (e.g. within server racks), allowing more precise and efficient cooling delivery.</p><p><strong>3. AI can join forces</strong></p><p>Similar to other topics in this article, AI can also be harnessed to enhance data center cooling efficiency. Siemens, for example, has developed White Space Cooling Optimization (WSCO), a solution that facilitates improved temperature control and energy optimization. By leveraging temperature and air supply data, Siemens’ AI engine utilizes advanced algorithms to calculate necessary adjustments in airflow, ensuring the appropriate temperature is maintained for each aisle of racks.</p><blockquote>By automating the control of cooling fans, it (WSCO) reduces the risk of a thermal outage and maintains consistent air temperatures among server racks and white space. It also reduces wasted energy by dynamically matching cooling to the IT load in real time, automatically responding to temperature changes and eliminating overcooling.</blockquote><blockquote>— Siemens: <a href="https://assets.new.siemens.com/siemens/assets/api/uuid:fdf5b798-479e-4f74-80d2-e472daf1f09a/Final-WSCO-White-Paper-AI.pdf">How Artificial Intelligence Is Cooling Data Center Operations</a></blockquote><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*zQwUDGRzWngGpysgcBkPvg.jpeg" /><figcaption>Source: <a href="https://press.siemens.com/global/en/pressrelease/siemens-delivers-ai-based-white-space-cooling-solution-tier-iv-data-center">Siemens press release</a></figcaption></figure><p>These factors discussed above are pivotal elements in the evolution of data centers. Although the industry acknowledges the influence of AI and the growing need for data centers, it is vital to bear in mind that investment evaluation pertains to individual projects. These projects can be highly technical encompassing various domains of expertise such as digital, energy, and real estate. Given the observed oversupply of data centers in specific key locations, the emphasis should be on evaluating the viability of each project based on a reasonable and practical business plan.</p><h4>Reference:</h4><ol><li><a href="https://www.datacenterknowledge.com/machine-learning/data-center-ai-and-connectivity-are-next-big-disruption#close-modal">In the Data Center — AI and Connectivity are the Next Big Disruption</a></li><li><a href="https://dgtlinfra.com/data-centers-artificial-intelligence-ai/">How Data Centers are enabling Artificial Intelligence (AI)</a></li><li><a href="https://www.datacenterfrontier.com/design/article/21438966/meta-rethinks-its-data-center-design-for-an-aipowered-future">Meta Rethinks its Data Center Design for an AI-Powered Future</a></li><li><a href="https://venturebeat.com/data-infrastructure/ai-and-ml-the-new-frontier-for-data-center-innovation-and-optimization/">AI and ML: The new frontier for data center innovation and optimization</a></li><li><a href="https://www.datacenterknowledge.com/security/how-chatgpt-can-help-and-hinder-data-center-cybersecurity">How ChatGPT Can Help and Hinder Data Center Cybersecurity</a></li><li><a href="https://interconnect.substack.com/p/jensen-huang-ntu-commencement-speech">Jensen Huang NTU Commencement Speech 2023</a></li><li><a href="https://www.datacenterknowledge.com/dcim/5-ways-ai-could-reshape-data-centers">5 Ways AI Could Reshape Data Centers</a></li><li><a href="https://venturebeat.com/ai/how-ai-will-change-the-data-center-and-the-it-workforce/">How AI will change the data center and the IT workforce</a></li><li><a href="https://www.ey.com/en_in/technology/how-ai-and-automation-make-data-centers-greener-and-more-sustainable">How AI and automation make data centers greener and more sustainable</a></li><li><a href="https://venturebeat.com/data-infrastructure/data-center-ops-how-ai-and-ml-are-boosting-efficiency-and-resilience/">Data center ops: How AI and ML are boosting efficiency and resilience</a></li><li><a href="https://www.euronews.com/next/2023/05/24/chatgpt-what-is-the-carbon-footprint-of-generative-ai-models">ChatGPT: What is the carbon footprint of generative AI models?</a></li><li><a href="https://www.forbes.com/sites/tiriasresearch/2023/05/12/generative-ai-breaks-the-data-center-data-center-infrastructure-and-operating-costs-projected-to-increase-to-over-76-billion-by-2028/">Generative AI Breaks The Data Center: Data Center Infrastructure And Operating Costs Projected To Increase To Over $76 Billion By 2028</a></li><li><a href="https://dgtlinfra.com/chatgpt-openai-azure-cloud/">ChatGPT and OpenAI’s use of Azure’s Cloud Infrastructure</a></li><li><a href="https://www.datacenterfrontier.com/data-center-cooling/article/33004506/hotter-hardware-rack-densities-test-data-center-cooling-strategies">Hotter Hardware: Rack Densities Test Data Center Cooling Strategies</a></li></ol><h3>Note</h3><blockquote><em>Thank you for being here, the note helps me, and I hope it helps you in some way. If you have any thought or feedback, I warmly welcome you to connect with me for further exchange via </em><a href="https://www.linkedin.com/in/shihlin-chang/"><em>my LinkedIn</em></a><em>.</em></blockquote><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=f86a4d03c566" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Study Note  —  Structure of Project Finance Modeling (4)]]></title>
            <link>https://medium.com/@shihlin-chang/study-notes-project-finance-modeling-structure-4-5ac61ab5220f?source=rss-29cccc6309c7------2</link>
            <guid isPermaLink="false">https://medium.com/p/5ac61ab5220f</guid>
            <category><![CDATA[project-finance]]></category>
            <category><![CDATA[financial-modeling]]></category>
            <category><![CDATA[excel]]></category>
            <category><![CDATA[infrastructure]]></category>
            <dc:creator><![CDATA[Shih-Lin]]></dc:creator>
            <pubDate>Sat, 20 May 2023 12:24:19 GMT</pubDate>
            <atom:updated>2023-06-13T09:54:58.641Z</atom:updated>
            <content:encoded><![CDATA[<h3>Study Note — Structure of Project Finance Modeling (4)</h3><h4>Debt &amp; Equity</h4><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*pO7uKj8L4ldMJPJg" /></figure><p>This is the fourth article in the series, which covers the topic related to funding sources: Debt and Equity. The outline of this article is as follows:</p><p><strong>Debt</strong></p><ul><li>Facility accounts and calculations</li><li>Debt sizing</li><li>Debt metrics</li></ul><p><strong>Equity</strong></p><ul><li>Accounts and calculations</li><li>Equity &amp; project returns</li></ul><h4>1. Debt</h4><p>The purpose of this section is to provide information and guidance on debt-related aspects. It covers the following key areas:</p><p>(1) <strong>Debt facilities</strong>: gathering details about debt facilities, including facility balances, interest payments, principal repayments, and associated fees (such as refinancing fees)</p><p>(2) <strong>Debt sizing: </strong>calculating and optimizing the appropriate size of debt, considering factors such as repayment structure and profile</p><p>(2) <strong>Debt metrics</strong>: monitoring the repayment capacity using metrics such as Debt Service Coverage Ratio (DSCR), Loan Life Coverage Ratio (LLCR), and others. These metrics can also be used to for debt sizing</p><p>In certain projects, lenders may engage in negotiations with borrowers regarding the establishment of reserve accounts, providing additional security measures like Debt Service Reserve Account (DSRA) and Major Maintenance Reserve Account (MMRA). These more advanced operations will be addressed in forthcoming articles.</p><p><strong>(i) Debt facilities</strong></p><p>To model the debt facility, the following steps can be followed:</p><ol><li>Incorporate the negotiated terms and structure of the facility by using flags. These terms are typically agreed upon among lenders, arrangers, and borrowers, based on factors such as project capacity and counterparty requirements. Some key aspects to consider include:</li></ol><ul><li><strong>Tenor:</strong> typically linked to the contracted revenue period and the risk appetite of lenders.<br>- Cash sweep<strong> </strong>mechanism or interest step-ups may be required by lenders to accelerate the repayment and incentivize refinancing</li><li><strong>Grace period: </strong>a<strong> </strong>buffer period during which only interest payments are made without principal repayments, often utilized during the project ramp-up phase.</li><li><strong>Repayment period, schedule, and profile: </strong>determine the repayment structure, such as annuity, sculpted, full cash sweep, etc.</li><li><strong>Refinancing </strong>timing<strong> </strong>and the associated fees: define the timing for potential refinancing and any applicable fees.</li></ul><p>2. Establish individual accounts for each debt facility to track balance movements. The account structure may include:</p><ul><li>BoP balance</li><li>Drawdowns (or conversion at construction completion)</li><li>Repayments</li><li>EoP balance</li></ul><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*Bj0EmDiiNiGIU3QfJ0jcBw.png" /><figcaption>Demonstration of debt accounts</figcaption></figure><p>3. Calculate the applicable interest rates. These rates can be fixed or floating and are derived from a combination of base rates and margins.</p><p>4. Compute the interest accrued for each period using the account balance and the applicable interest rate.</p><p>5. Calculate repayments based on various repayment profiles (e.g., annuity, sculpted, constant principal repayments). A structure can be set up to calculate different profiles with the use of a specific row, &quot;Applied profile,&quot; to dynamically choose which profile to incorporate into the calculation in Step 2, resulting in the determination of facility balances.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/663/1*h9mBAGJ3OJApQPoHfAe_kg.png" /><figcaption>Illustration of constant amortization profile (same principal repayment amount each period)</figcaption></figure><p><strong>(ii) Debt sizing</strong></p><p>The previous section illustrates a simple structure of the debt sheet. However, a crucial factor remains unanswered: how to determine the optimal debt size that benefits all participants in a transaction.</p><p>The debt size directly affects returns, encompassing all the numbers on the debt sheet and the overall model. Typically, from the sponsor’s viewpoint, if the cost of debt is lower than the cost of equity, it is preferable to finance the project with as much debt as possible to increase the equity IRR. However, lenders can only permit a certain amount of debt due to the heightened project risk associated with higher debt levels. Debt sizing plays a crucial role in striking a balance between different parties involved in the transaction.</p><p>The process of determining the appropriate size of debt involves establishing sizing parameters, as outlined in the term sheet, which specify requirements such as maximum gearing ratio and/or minimum Debt Service Coverage Ratio (DSCR). These parameters are designed to maintain the project within an acceptable risk threshold for lenders.</p><p>For example, let’s consider a scenario where a minimum DSCR of 1.5x is set based on P50 production estimates. This implies that the total debt service payments for each period should not exceed two-thirds (or 1/1.5) of the CFADS under the assumption of P50 production. By aggregating the projected principal payment component of the debt service for each period, we can ultimately determine the maximal allowable size of the debt under this scenario.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*Lbe5MhEWcfxSC4iSH2GEQg.png" /><figcaption>Illustrative debt sizing</figcaption></figure><p>During the debt sizing process, a circularity problem arises due to the interdependence between the size of the debt, interest payments, principal repayment amounts, and subsequently, the size of the debt itself. This circular relationship creates a challenge in accurately determining the final values. While Excel offers iterative calculation options to address this issue, a more efficient and stable approach involves utilizing macros.</p><p>In future posts, I will delve into writing a simple macro that effectively resolves the circularity problem, which can happen also if there is a DSRA. By incorporating a macro, we can establish a reliable and automated solution to mitigate circularity issues and ensure accurate calculations.</p><p><strong>(iii) Debt Metrics</strong></p><p>The final section of the debt sheet focuses on debt metrics, which play a crucial role in covenant testing and project monitoring. Debt metrics, such as Debt Service Coverage Ratio (DSCR), Loan Life Coverage Ratio (LLCR), and Interest Coverage Ratio (ICR), are utilized to assess the project’s financial performance and adherence to covenant requirements. In some cases, sector-specific metrics, like Net Debt to Home Passed for fiber deals, may also be employed. The calculation of debt metrics can vary across the projects based on what is defined in the term sheets.</p><p>The calculation of debt metrics can vary across projects, depending on the specifications outlined in the term sheets. During the pre-financial close phase, the DSCR in the forecasting model serves as a projection that aids investors and lenders in making informed decisions. However, post-investment, ongoing scrutiny is necessary, with regular evaluations based on the actual CFADS and debt covenants during the operational periods. This ensures continuous monitoring and enables appropriate adjustments to be made in response to the project’s actual financial performance.</p><p>The debt metrics section typically encompasses various pieces of information, using DSCR as an example metric. The following details are commonly included:</p><ul><li><strong>DSCR (In-period/LTM)</strong></li><li><strong>Minimum DSCR</strong> of the project and the corresponding date (minimum DSCR date)</li><li><strong>Average DSCR</strong> of the project, calculated either on a weighted average basis or on a simple average basis</li><li><strong>Covenant testing</strong> involves evaluating whether the project has breached any covenant thresholds during the tenor of the debt. It helps identify potential events of default or lock-up. The associated dates when such events are triggered are also documented.</li></ul><h4>2. Equity</h4><p>The Equity sheet focuses on managing the remaining cash flows after servicing the debt obligations. In a straightforward scenario, it entails considering components such as share capital, shareholder loans, and distributions.</p><p><strong>(i) Share Capital</strong></p><p>Similar to other sections, the initial step involves establishing accounts to track share capital, following a similar framework of inflows and outflows derived from the Funding section.</p><ul><li>BoP balance</li><li>Additions (equity injections, conversion of intercompany loan to equity, etc.)</li><li>Reductions (e.g. capital buyback)</li><li>EoP balance</li></ul><p><strong>(ii) Shareholder Loan (SHL)</strong></p><p>A shareholder loan serves as a mechanism for equity investors to withdraw cash when distributions may be restricted due to certain conditions. Sponsors may intentionally defer the repayment of shareholder loans or capitalize the interest payments to take advantage of the higher interest payments on the loan.</p><p>A shareholder loan is a means used by equity investors to flow out cash, since sometimes distributions can be restricted under certain conditions. Sponsors may purposefully delay the repayment of shareholder loan or capitalize the interest payments to enjoy the benefits of higher shareholder loan interest payments.</p><p>Similar to the previous sections, we can follow the steps below:</p><ol><li>Set up an account to track the balance:</li></ol><ul><li>BoP balance</li><li>Additions (e.g. drawdowns, interest capitalized, etc.)</li><li>Reductions (e.g. repayment)</li><li>EoP balance</li></ul><p>2. Calculate interest expense and interest capitalized related to SHL</p><p>3. Determine the principal repayments. These repayments are typically scheduled after the payment of shareholder loan interest and distributions, often with a maximum repayment restriction in place to minimize the repayment amount.</p><p>4. Flow the results of Steps 2 &amp; 3 back into the accounts in Step 1</p><p><strong>(iii) Distribution</strong></p><p>In a simplified scenario, once the debt services and shareholder loan interests have been paid, the remaining cash flows can potentially be distributed to the shareholders, provided that certain distribution requirements are satisfied. These requirements can vary depending on the specific terms and conditions of the project. Here are examples of distribution requirements:</p><ul><li><strong>No Covenant breach</strong>, for example, passing the DSCR lock-up test</li><li>The <strong>required MMRA/DSRA balance</strong> is achieved</li><li>The <strong>minimum cash balance</strong> is satisfied</li><li><strong>Retained earning restrictions</strong> are met</li></ul><p>Once the distribution requirements are fulfilled, the remaining cash flows, in combination with the cash balance at the beginning of the period, constitute the “<strong>cash available for distribution</strong>”. The actual distribution amount may be subject to a payout ratio or conditional payment terms, such as an annual or semi-annual schedule. Furthermore, it is important to model the full distribution in the last period of the project as well, considering the specific timeline and requirements outlined in the project agreement.</p><p><strong>(iv) Equity returns</strong></p><p>Analyzing the project’s returns for equity investors is the next step. From the perspective of equity investors, their return is determined by the amounts they have invested (including equity investment and additional equity injections) and the returns they receive (such as distributions or interest from shareholder loans). The aggregate of these components represents the equity cash flow.</p><p>Equity investors utilize the following metrics to assess their returns.</p><ol><li><strong>NPV of equity cash flows</strong> measures how much the project is worth for equity investors, either positive or negative, given a discount rate assumption (e.g. the required return for the equity investors). The discount rate is determined by each equity investor and reflects their individual assessment of the expected returns they could earn on similar projects.</li><li><strong>Internal Rate of Return</strong> (IRR): IRR is another commonly used metric. It represents the discount rate that sets the NPV of cash flows to zero. In other words, it determines the rate of return at which the present value of equity cash flows equals the initial investment.</li></ol><figure><img alt="" src="https://cdn-images-1.medium.com/max/995/1*S5RW8FqLNGbhkha05abZpA.png" /></figure><p><strong>(v) Project returns</strong></p><p>In addition, it is possible to evaluate a project without considering any debt financing, which allows for a comparison of projects regardless of their financial structure or financing engineering. This approach is adopted to facilitate easier comparisons, as each project may have a unique financing structure.</p><p>Practically, to evaluate a project without debt financing, various adjustments are made to eliminate the effects of debt-related factors. For example, financing-related costs are excluded from the construction costs, and tax payments are calculated based on an ungeared (debt-free) basis. The discount rate used to assess project returns can be determined based on assumptions that align with the project’s risk profile, taking into account factors such as the jurisdiction or country in which the project operates.</p><p>Once the returns and metrics from the Debt and Equity sheets have been calculated, it is beneficial to link this important information to the Scenario Manager or other relevant sheets. This linkage helps streamline the project analysis process, allowing for easier exploration of different scenarios and enhancing the overall analysis of the project.</p><p>Alright, we’ve reached the final stretch! After crunching all those numbers on the Calculation Sheets, the only thing left to do is connect the dots and plug the results into their designated spots on the Output sheets. We’ll dive into this exciting process in the last article of our series.</p><h3>Note</h3><blockquote><em>Thank you for being here, the note helps me, and I hope it helps you in some way. If you have any thought or feedback, I warmly welcome you to connect with me for further exchange via </em><a href="https://www.linkedin.com/in/shihlin-chang/"><em>my LinkedIn</em></a><em>.</em></blockquote><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=5ac61ab5220f" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Study Note  —  Considerations for EV Charging Business]]></title>
            <link>https://medium.com/@shihlin-chang/study-notes-risks-for-ev-charging-business-from-a-lenders-perspective-3527861afdd?source=rss-29cccc6309c7------2</link>
            <guid isPermaLink="false">https://medium.com/p/3527861afdd</guid>
            <category><![CDATA[electric-vehicles]]></category>
            <category><![CDATA[ev-charger]]></category>
            <category><![CDATA[infrastructure]]></category>
            <category><![CDATA[energy-transition]]></category>
            <category><![CDATA[ev-charging]]></category>
            <dc:creator><![CDATA[Shih-Lin]]></dc:creator>
            <pubDate>Sun, 14 May 2023 15:57:01 GMT</pubDate>
            <atom:updated>2023-06-28T18:41:20.331Z</atom:updated>
            <content:encoded><![CDATA[<h3>Study Note — Considerations for EV Charging Business</h3><h4>From a lender’s perspective</h4><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*6Ij82ZjnzDygFTHd" /></figure><p>Against the backdrop of the ongoing energy transition, we are witnessing a notable surge in the adoption of electric vehicles (EVs) and a rapid expansion of EV charging stations. In an effort to promote investment in EV charging infrastructure, significant public resources have been allocated towards this end.</p><blockquote>The EV Charging Masterplan estimates that by 2030 a total of <strong>6.8 million public chargers for PCs, 0.7 million for LCVs, and 0.1 million for trucks and buses</strong> would need to be installed in the demand-drivingoriented pathway.</blockquote><blockquote>…… <strong>On average, 14,000 public charging points would have to be deployed weekly between 2021 and 2030.</strong></blockquote><blockquote><strong><em>— Research Whitepaper: European EV Charging Infrastructure Masterplan</em></strong></blockquote><figure><img alt="" src="https://cdn-images-1.medium.com/max/671/1*cQNkPBxYDwfUy1RI8BnUOw.png" /><figcaption>Source: Research Whitepaper — European EV Charging Infrastructure Masterplan</figcaption></figure><p>I had the opportunity to work on a project for financing an EV charging platform in Europe, which greatly altered my perception of the charging stations that I can encounter every day on the street. In this article, I would like to share the primary risks associated with investing in the sector, specifically from the standpoint of a lender.</p><h3>Location risk</h3><p>When it comes to EV charging infrastructure, one of the most critical factors to consider is the location of the charging points. The location can significantly impact the utilization rate and profitability of the stations. To manage this risk, companies can secure <strong>long-term lease contracts</strong> <strong>with</strong> <strong>exclusive rights</strong> to the charging sites.</p><p>The lenders usually evaluate the <strong>duration of these contracts </strong>as well as <strong>the number and the quality of secured sites in the company’s backlog or pipeline</strong>. Moreover, companies can leverage both external and internal software technologies for <strong>network planning</strong> and <strong>site selection</strong> to identify prime locations that receive high traffic, such as near shopping malls and restaurants. By doing so, companies can increase the chances of attracting more users and generating higher revenue streams from charging services, thus eliminating the downside risks.</p><h3>Price risk</h3><h4>Use case — public vs. private charging</h4><p>The risk associated with EV charging prices is highly dependent on the specific use case. In the case of <strong>public charging</strong>, such as on-route and destination charging, users are generally less sensitive to price and instead prioritize factors such as the charging location and speed. For example, if an EV runs out of battery on a highway, the driver is likely to prioritize finding a charging station, regardless of the price.</p><p>On the other hand, for <strong>private charging</strong>, the price typically plays a more important role. Private EV owners are more likely to compare the prices of different charging solutions and may prioritize cost savings over other factors. Therefore, when evaluating the risk related to charging prices, it is essential to consider the specific use case, as this will have a material impact on the users’ behavior and preferences, and thus the risks associated.</p><h4>Energy cost</h4><p>The price risk is also directly linked to the cost of energy, so it is crucial to examine how the company sources its power and stabilizes its electricity costs. For instance, the company can enter into <strong>long-term contracts</strong> with renewable energy providers to secure a stable and predictable supply of electricity at a fixed price.</p><p>Moreover, in some countries, the sale/delivery of renewable energy is linked to <strong>green certificates</strong>, which can provide an additional layer of protection against price risks. EV charging companies can sell these certificates as a form of hedge against energy price fluctuations if the power source is renewable energy, thereby reducing the overall risk associated with price volatility.</p><p>Electricity price is the next one, due to competition. It is a tricky one, because PPAs can be a financial disaster if you purchase more electricity than you sell. Going forward it should be less problematic, thanks to a larger fleet of EVs, but today it is a real headache.</p><h3>Electricity price risk</h3><p>As mentioned above, the fluctuation of electricity prices can have a direct and significant impact on the profitability of EV charging businesses. Therefore, it is critical to evaluate how the company sources its power supply. One way to mitigate the margin erosion caused by a rise in electricity prices is to enter into <strong>long-term power purchase agreements (PPAs)</strong>. These agreements allow the company to acquire a specific portion of the electricity generated at predetermined prices, acting as a safeguard against future price hikes.</p><p>Another strategy commonly used by EV charging companies is to secure <strong>power supply contracts</strong> with electricity suppliers, which enable them to lock in prices within predetermined ranges. This approach provides greater visibility into future energy costs and helps to manage price risk. Nonetheless, determining the appropriate structures of PPAs and power supply contracts remains challenging at this stage due to the difficulty in predicting future demands. Consequently, it is also vital to source electricity from a diverse range of sources to ensure flexibility in meeting the electricity requirements.</p><p>Therefore, some companies may further manage electricity supply on the energy market for their short to mid-term needs, for example, through <strong>forwards</strong>. This further enhances the company’s ability to manage price risk and can provide additional comfort to lenders. Overall, the way in which a company sources its power supply is a critical factor to consider when assessing the risk associated with EV charging businesses.</p><h3>Demand risk</h3><p>Part of the demand risk associated with EV charging is linked to the location risk. Companies can mitigate this risk by ensuring that they secure high-quality locations for their charging stations, which is addressed above. It is also important to examine the <strong>market perspectives</strong> in the countries where the company operates to evaluate how <strong>public policies </strong>and <strong>underlying trends</strong> may foster long-term demand growth.</p><p>In terms of policy support, some governments offer <strong>tax incentives </strong>or<strong> charge exemptions</strong> for EV users to promote zero-emission transportation. Such policies can have a positive impact on the demand for EV charging services in the long run. Therefore, it is crucial to assess the impact of such policies on the growth potential of the EV charging business in the relevant markets.</p><p>Additionally, it is worth investigating the current state of EV charging infrastructure development and its relation to <strong>overcapacity risks</strong> in the market. The evolution of EV charging can be divided mainly into two phases based on the figures of <strong>EVs per charging station</strong>.</p><ul><li><strong>Phase I</strong> involves EV sales accounting for a small portion of total vehicle sales, with the overall EV fleet still relatively small. During this stage, charging stations may be installed pre-emptively to facilitate market growth at a faster rate than the EVs entering the market. However, due to the high costs and limited appeal of EVs to consumers, there is a higher risk of overcapacity. A lot of countries are still in this initial phase.</li><li><strong>Phase II</strong> involves EV sales normally exceeding 15% and exhibiting stable growth. During this stage, EV adoption outpaces charging point installations, reducing the risk of overcapacity. EVs are considered more affordable and appealing to consumers, with the availability of infrastructure becoming critical to customers’ preference for EVs. Examples of markets in this phase include Norway and Sweden.</li></ul><p>Lenders may consider examining the stage of development in each target market to assess project risks.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/765/1*PJhNfW3A4eyzaYZpbPqtHw.png" /><figcaption>Source: <a href="https://www.linkedin.com/posts/marco-van-kalleveen_ev-greenmobility-transport-activity-6991669950830518274-k9gc/?originalSubdomain=si">Roland Berger</a></figcaption></figure><h3>Technology risk</h3><p>The technology risk is related to whether the charging technology offered by the company can meet market standards and cater to the needs of the users. From a lender’s perspective, the technology risk is lower if the company offers chargers <strong>covering all charging speed segments</strong> <strong>(slow, fast, and ultra-fast)</strong> with good positioning for the new generation of EVs that allow for higher EV charging ratios (for instance, through the adoption of 350kw High Power Charger). It is also advantageous if the charging solutions are accessible by all vehicles regardless of vehicle OEM or type (<strong>vehicle agnostic</strong>), as this can help the company capture more demand.</p><p>Additionally, it is crucial to consider <strong>interoperability </strong>when evaluating an investment in EV charging infrastructure. Interoperability refers to the compatibility between vehicles, charging stations, charging networks, and the power grid. A project with a high level of interoperability, facilitated by software support that ensures seamless functioning of all components, presents lower risks.</p><blockquote>The other thing is interoperability and roaming, similar to the world of telecommunications, where you can use your mobile phone almost anywhere in the world.</blockquote><blockquote><strong><em>— Andreas Lips, President &amp; CEO Shell Recharge Solutions</em></strong></blockquote><p>Moreover, dedicated <strong>renewal capex</strong> amounts to replace charging points can also help lower the technology risk. As technology continues to advance, the costs of charging decrease while the quality of chargers improves, rendering older chargers less competitive. By investing in the latest charging technologies and consistently upgrading charging points, operators can ensure that their charging solutions remain competitive and align with the evolving demands of users. In essence, it is crucial for companies to stay abreast of the latest charging technologies and cater to the diverse needs of users in order to mitigate the technology risk associated with EV charging businesses.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*wJMwh-nL73ic9Gqa" /><figcaption><strong>350kw High Power Charging technology</strong> is expected to be more common<br>with the emergence of new generations of EVs</figcaption></figure><h3>Construction risk</h3><p>The construction risk is highly related to the terms set out with the EPC (Engineering, Procurement, and Construction) contractors. For instance, companies can ensure more comfort if the<strong> liabilities linked to delays in construction or installation can be passed down to the EPC contractor on a back-to-back basis. </strong>Alternatively,<strong> </strong>the company can require a <strong>Performance Bond </strong>or a <strong>Parent Company Guarantee </strong>from the contractor, securing the performance of the contractor’s obligations under the contract. This can provide companies with another layer of protection against potential delays, cost overruns, and underperformance.</p><p>Furthermore, it is helpful to examine whether the contractors have a <strong>strong track record in obtaining permits and delivering projects. </strong>This can help ensure that the construction phase is completed within the stipulated timelines and budget. By working with experienced contractors and ensuring clear contractual terms, companies can minimize the risks during the construction phase.</p><h3>Supply risk</h3><p>This risk is similar to what was mentioned earlier regarding the construction risk. Companies can take measures to avoid delays and cost overruns by developing <strong>strong and long-term relationships with hardware suppliers</strong>. In addition, it could be beneficial to examine whether the hardware is <strong>locally manufactured</strong> to reduce the risk of any delays and whether the company is partnering with new suppliers to support its expansion. Moreover, <strong>disciplined pre-ordering</strong> of components can also enhance the stability of the supply chain. These are the crucial factors that need to be evaluated when assessing the supply risk of an EV charging project.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*Qx4MVlrakl8D8dt4" /></figure><h3>Operational risk</h3><p>The operational risk pertains to how the company conducts operational and maintenance activities. A thorough evaluation of the company’s ability to demonstrate a successful track record of site O&amp;M or secure premium quality services from O&amp;M contractors or subcontractors is necessary. Similar to construction contracts, mitigating operational risks can be accomplished by engaging in <strong>service agreements with reputable specialized O&amp;M contractors</strong> and <strong>transferring liabilities on a back-to-back basis</strong>. Furthermore, companies can negotiate agreements with hardware suppliers to provide <strong>service availability guarantees </strong>and to cover<strong> corrective and preventive maintenance operations</strong>, thereby decreasing operational risks.</p><h3><strong>Regulatory risk</strong></h3><p>The regulatory risk presents a crucial factor for consideration in the adoption and growth of electric vehicles. This risk is contingent upon the local authority and encompasses various governmental policies and schemes that support the development of EVs, including grid connection, construction permits, and operation permits, as well as financial incentives such as tax reductions and subsidies for EV purchases and charging infrastructure installation. Additionally, some countries have announced ambitious targets to ban the sales of internal combustion engine vehicles in the near future, such as <a href="https://www.forbes.com/sites/katharinabuchholz/2023/02/16/combustion-going-bust-global-phase-outs-of-gasoline-cars-infographic/?sh=166e0a1a3b1d">Norway in 2025</a>, the Netherlands in 2030, and <a href="https://edition.cnn.com/2022/06/08/business/eu-climate-vote-energy-intl/index.html">the EU in 2035</a>, which have the potential to expedite the transition to EVs.</p><blockquote>At present, there are about 1.15 million public charging stations in China, around 340,000 in Europe, and roughly 100,000 in the United States.</blockquote><blockquote><strong><em>— McKinsey Explainers: What is an EV?</em></strong></blockquote><p>While the trend towards EVs is positive in many countries, with China, Europe, and the US leading the charge, it is important to note that the level of support and maturity of the EV market can differ between regions. Hence, it is imperative to conduct a comprehensive market analysis in each target country to assess the viability of any investment decisions related to EVs.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/671/1*rY0H0M98Kcceu49bQB04Eg.png" /><figcaption>Source: Coltura, Statista research (from Forbes news)</figcaption></figure><p>There are also other typical risks, such as inflation and interest rate risks, which are common to most infrastructure investments. These risks can be addressed through mitigation measures, such as price indexation and interest hedging, which are not further covered in this article. Nonetheless, it is also crucial to conduct a thorough review of these risks, with due consideration to the unique context and markets involved in the projects.</p><h3>Note</h3><blockquote><em>Thank you for being here, and I hope the article helps you in some way. If you have any thought or feedback, I warmly welcome you to connect with me for further exchange via </em><a href="https://www.linkedin.com/in/shihlin-chang/"><em>my LinkedIn</em></a><em>.</em></blockquote><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=3527861afdd" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Study Note  —  Structure of Project Finance Modeling (3)]]></title>
            <link>https://medium.com/@shihlin-chang/study-notes-project-finance-modeling-structure-3-9790a1f7ca32?source=rss-29cccc6309c7------2</link>
            <guid isPermaLink="false">https://medium.com/p/9790a1f7ca32</guid>
            <category><![CDATA[project-finance]]></category>
            <category><![CDATA[modeling]]></category>
            <category><![CDATA[excel]]></category>
            <dc:creator><![CDATA[Shih-Lin]]></dc:creator>
            <pubDate>Wed, 19 Apr 2023 14:02:05 GMT</pubDate>
            <atom:updated>2023-06-13T09:56:35.318Z</atom:updated>
            <content:encoded><![CDATA[<h3>Study Note — Structure of Project Finance Modeling (3)</h3><h4>Depreciation &amp; Tax</h4><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*d9ir5kdQmltVy6mt" /></figure><p>Now, let’s move on to Depreciation and Tax. This section is closely related to local regulations, especially those guided by tax authorities. Therefore, I will discuss general principles, but it’s important to note that the reality can differ based on how the deal is structured. Typically, tax advisors and specialists are involved to optimize the structure while ensuring compliance with the regulations.</p><h3>Depreciation &amp; Tax (D&amp;T)</h3><p>This sheet calculates the depreciation and tax-related items of the projects, including separate calculations for accounting and tax depreciation. A simplified structure for this section may look like:</p><ul><li><strong>Depreciation (Book)</strong></li><li><strong>Depreciation (Tax)</strong></li><li><strong>Tax</strong></li></ul><h4>1. Depreciation</h4><p>Depreciation refers to the decrease in value of long-term assets over their useful lives. It can be thought of as the ‘consumption’ of economic value of assets within a period, with the remaining value reported on the balance sheet, such as property, plant, and equipment (PP&amp;E).</p><p>There are various methods that can be used for calculating depreciation, such as straight line, accelerated, and unit of production. The choice of depreciation method can depend on the asset category, with different assets subject to different methods. The categorization of assets is typically based on features such as useful life. To model the depreciation section, the following steps can be used:</p><ol><li><strong>Categorization </strong>involves splitting Capex additions from construction (such as construction costs, interest during construction, and financing fees) and operation (maintenance) into different depreciation categories</li><li><strong>Building depreciation bases </strong>involves translating Capex additions into depreciation bases for each period. One challenge of calculating the depreciation base is that there may be additional Capex in each period, so it’s important to be able to adjust the calculation flexibly to reflect the correct base. In some projects, a large depreciation table may be necessary, while in other models, different methods may be adopted to save space, such as using the OFFSET function or even a VBA-defined depreciation function. This more technical aspect will be addressed in my future posts.</li><li><strong>Calculation </strong>involves applying a depreciation rate based on the selected depreciation method to each base. Data validation can be used to create drop-down lists that allow for flexible changes to the depreciation methods.”</li></ol><figure><img alt="" src="https://cdn-images-1.medium.com/max/899/1*RwtRSe2jQ6RjCx7RHfBntw.png" /><figcaption>Illustrative D&amp;A calculation result</figcaption></figure><p>The process involves several details. For instance, it may be necessary to restrict the entry of construction Capex into the depreciation base until the end of construction to ensure that depreciation doesn’t start during the construction phase. Additionally, a rule may be set to write off assets at the end of the operation period. These rules can make modeling the sheet slightly more complex.</p><p>The depreciation sheet can be divided into the main sections below, which can be applied to both accounting and tax depreciation. The primary differences between the two are the selection of depreciation methods (such as straight line or accelerated) for each asset category, with some methods being subject to local laws. The outputs of these methods are linked to different accounts, with accounting depreciation ultimately affecting retained earnings, while tax depreciation is linked to tax payments and, consequently, cash.</p><ul><li><strong>Accounts</strong></li><li><strong>Additions</strong></li><li><strong>Depreciation base</strong></li><li><strong>Depreciation</strong></li></ul><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*wxOpef7HLZvuK9wOA9V9UA.png" /><figcaption>Demonstrative depreciation account</figcaption></figure><p>Furthermore, we can include a summary at the end of the depreciation section, which would enable us to extract vital information for use in other sheets. For example, we can summarize the amount of depreciation and write-off for both accounting and tax purposes and the net book value, which can be linked to the P&amp;L sheet, tax calculation section, and Balance Sheet, respectively.</p><h4>2. Tax</h4><p>Tax calculations are commonly placed after the depreciation section but can also be modeled on a separate sheet. This is because tax calculations rely on the outputs from the depreciation section as inputs. By placing the tax calculation after the depreciation section, we can ensure that the information is properly linked and that the calculation is accurate.</p><p>Various tax laws may apply to a project, with differences depending on the local jurisdiction. In this discussion, we will focus on the standard corporate tax, which is generally consistent across different locations. However, if a project spans multiple jurisdictions, it may be necessary to include several sections on the Tax sheet, each structured to account for the specific tax rates and requirements in the relevant region.</p><p>Let’s first recall the basic formulas to break down the calculation of tax payments:</p><ol><li><strong>EBITDA — Tax Depreciation — Interest Deductible = Taxable Income</strong></li></ol><ul><li>It’s important to note that the amount of deductible interest may be limited by local authorities. For example, the local authority may set a limit of ≤ 30% of EBITDA, which is commonly known as “thin capitalization test.” This is done to restrict the tax benefits that companies can receive through the use of debt, i.e. the tax shield.</li></ul><p><strong>2. Taxable Income — Tax Losses = Net Taxable Income</strong></p><ul><li>Tax losses are a result of previous periods’ losses, and they can be used to offset taxable profits in the future. This helps reduce the amount of tax payable by a company. It’s important to note that there may be restrictions on the use of tax losses, such as carryforward limitations or changes in ownership</li></ul><p><strong>3. Net Taxable Income x Tax Rate = Taxable Payable</strong></p><p>What makes the tax section a bit complicated is the distinction between tax payable and tax expense, resulting in the creation of deferred tax assets or liabilities that appear on the balance sheet. These differences can have an impact on retained earnings and distributions.</p><ul><li><strong>Tax expense</strong> is a item on P&amp;L statement calculated from earnings before taxes (EBT), which follows accounting principles.</li><li><strong>Tax payable</strong> is the actual amount owed to the government calculated from net taxable income, which needs to be calculated in accordance with the tax laws and regulations of the local jurisdiction.</li></ul><p>The difference between tax payable and tax expense can arise due to various reasons, such as the use of different depreciation schedules for tax and accounting purposes, or because expenses are recognized differently in tax statements compared to income statements.</p><p>The followings are the simplification of tax calculation:</p><ol><li><strong>Calculate taxable income (</strong>tax depreciation is used instead of accounting depreciation)</li><li><strong>Calculate tax loss </strong>using the tax loss accounts (items: balances, tax loss generated, tax loss expired, and tax loss utilized)</li><li><strong>Calculate net taxable income </strong>(taxable income — tax loss utilised)</li><li><strong>Calculate tax payable by </strong>applying a tax rate to met taxable income</li></ol><figure><img alt="" src="https://cdn-images-1.medium.com/max/808/1*8gudKRBy0WFpNztcZetXNQ.png" /><figcaption>Illustrative Tax Loss Account</figcaption></figure><p>It should be noted that tax payable, which is a P&amp;L item, is different from tax paid, which is an item on the cash flow waterfall and cash flow statement. For simplicity, tax paid is sometimes assumed to be equal to the amount of tax payable for the previous period, but in reality, companies may make tax payments in quarterly installments based on the amount of tax payable.</p><p>Lastly, it is possible to calculate tax on both geared and ungeared bases. Ungeared tax calculations make it easier to compare projects without the effect of financing structure, and the output can be used in the Equity Sheet for evaluating the return of projects (see the Equity section in the next article).</p><p>We are halfway through at this point! I’m glad you’re still here with me. In the next article, I will cover the last two parts of Calculation — Equity &amp; Debt.</p><h4><strong>Note</strong></h4><blockquote><em>Thank you for being here, the note helps me, and I hope it helps you in some way. If you have any thought or feedback, I warmly welcome you to connect with me for further exchange via </em><a href="https://www.linkedin.com/in/shihlin-chang/"><em>my LinkedIn</em></a><em>.</em></blockquote><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=9790a1f7ca32" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Study Note  —  Structure of Project Finance Modeling (2)]]></title>
            <link>https://medium.com/@shihlin-chang/study-notes-project-finance-modeling-structure-2-83f44312dadb?source=rss-29cccc6309c7------2</link>
            <guid isPermaLink="false">https://medium.com/p/83f44312dadb</guid>
            <category><![CDATA[project-finance]]></category>
            <category><![CDATA[excel]]></category>
            <category><![CDATA[modeling]]></category>
            <dc:creator><![CDATA[Shih-Lin]]></dc:creator>
            <pubDate>Mon, 17 Apr 2023 15:01:39 GMT</pubDate>
            <atom:updated>2023-06-13T09:57:12.881Z</atom:updated>
            <content:encoded><![CDATA[<h3>Study Note — Structure of Project Finance Modeling (2)</h3><h4>Construction and Operation</h4><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*4GI6uL9H3KsZqoVy" /></figure><p>In the first article, we have covered the Input section of the model. Now we move on to the part “where things happen” — Calculation. In Calculation, we have several sheets designated for different aspects of the project. Without further ado, let’s dive right into each sheet.</p><h3>Calculation</h3><h4>1. Construction (including Funding)</h4><p>The main purpose of the sheet is to manage the costs and the corresponding funding for these costs during the construction period. In Project Finance, a huge chunk of costs, e.g. for constructing wind farms or toll roads, is incurred in the initial stages before any revenue is generated. As a result, these costs can only be covered by external funding (in the form of debt and equity). Therefore, ensuring the timing and sizes of the costs and funding is of paramount importance, and this sheet facilitates the process.</p><p>Normally, we start by identifying the costs (or “uses”). So a table listing all cost items with their schedule is commonly used.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*FqIOkyrIZt95hwZaeojT1A.png" /><figcaption>Illustrative construction cost schedule</figcaption></figure><p>Then, we can apply the cost schedule, which is defined by the input sheets in the form of percentage, to the estimated total cost of each item to reach the absolute numbers in the period. Also, contingency cells may be used to account for cost escalation by a certain percentage.</p><p>Furthermore, expenses associated with financing, such as the interest during construction (IDC) and financing fees, must be considered. Below is an overview of the uses.</p><p><strong>Uses</strong></p><ul><li><strong>Construction &amp; Capex schedule:</strong> allocation profile of the construction costs, which comes from Input sheets.</li><li><strong>Interest during construction (IDC)</strong>: interest expenses are incurred when the project is funded by debt during the construction phase. The interests increase the total uses and thus the total funding need. This is one area where circularity may arise, and one common approach to breaking the circularity is through the use of Macro, which will be addressed in future posts.</li><li><strong>Financing fees</strong> such as arrangement fees and commitment fees are also incurred by the use of debt financing. These are the fees paid as compensation to the lenders or banks, which increases the total uses and thus may contribute to circularity in the model as well.</li></ul><p>Once the total uses have been determined, we need a section that specifies the sources of funding (sources), which should add up to the equivalent of total uses because no cash flows are generated “internally” by the project in this phase. A simple scenario for the sources section looks like the following:</p><p><strong>Sources:</strong></p><ul><li>Equity</li><li>Senior debt</li><li>[Additional equity]</li></ul><p>In order to decide the appropriate quantum to be drawn from each funding source in a specific period, we typically set up another section called “Funding” to track the accounts, including BoP &amp; EoP balances, drawdown, and undrawn amounts of these funding instruments. And the amount flowing into the “Sources” section is generally calculated based on:</p><ul><li>how much is needed (funding needs originated from uses passing through the hierarchy, see explanation below)</li><li>how much is allowed for respective funding facilities, for instance, the undrawn amount</li></ul><p>The allowable amount is conditioned to some restrictions. For example, the maximum injection is subject to the undrawn amount left on the account of an instrument, or a drawdown can only happen during the availability period of a loan.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*b4JXHbIXEs65rO6o6YJcmw.png" /><figcaption>Illustrative Sources &amp; Uses section</figcaption></figure><p>There is a drawdown hierarchy, which determines the order of uses of different funding sources depending on the funding structures of the projects. This can vary across projects with commonly observed profiles including equity-first and pro-rata with the former normally preferred by lenders. Adding these variations makes modeling even more dynamic and versatile.</p><p>In some models, the “Funding” section may be moved to another separate sheet since it can be a large section if various instruments are utilized, while in others, it may just be incorporated into the same sheet for simplicity.</p><p>The sources section mentioned above is a simple scenario that includes only equity and senior debt. But in reality, there can be multiple sources of funding to be considered such as Shareholder Loans, Intercompany Loans, or various debt facilities like Capex Facilities, Revolving Credit Facilities, Refinancing Facilities, or HoldCo Facilities. In these situations, things get more complicated as the model needs to match the sources to the funding needs in the correct order considering the purposes of the facilities. Therefore, it is not rare to have hundreds of rows in this section (Sources &amp; Uses + Funding) to accurately capture all the funding sources and uses in the project.</p><h4>2. Operation</h4><p>The operation tab includes revenues and expenses associated with the operation period. Let’s talk about revenues first.</p><h4>Revenue</h4><p>In a renewables project, revenues are typically linked to the product of 2 drivers: <strong>volume</strong> and <strong>price</strong>. The following example is for a wind farm.</p><ul><li><strong>Production volume </strong>is related to the generation profile (e.g. P50/P75/P90) and the number of turbines in a wind farm</li><li><strong>Price curves </strong>(high, low, base) are projected with escalation to nominal price using indexation</li></ul><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*-uTA4Pf77hYFo_p5WBOMmQ.png" /><figcaption>Illustrative Revenues (fictional)</figcaption></figure><p>However, there may be multiple revenue streams, such as several different PPAs, Guarantees of Origin (GoOs), and merchant sales, which require the model to project and allocate the volumes and prices under different streams with proper indexation according to various contracts.</p><p>If we consider other assets, the revenue streams can be completely different. In a fiber deal, the revenues can be calculated as lines sold (volume) multiplied by ARPU; for a locomotive leasing business, the leasing revenues can be broken down into average fleet times utilization rates times leasing fees; data centers earn revenues partly from rental fees for the use of capacity, which can be calculated as leased capacity multiplied by leasing rates. Therefore, it’s crucial to understand the business model and contracts to construct a revenue structure that accurately reflects reality. (Note: the examples above are just illustrative and do not cover all possible revenue streams for each type of asset.)</p><h4>Operating expenditure</h4><p>Operating expenditures can be broadly divided into fixed costs and variable costs, with the latter linked to generation (e.g. XX€/MWh of O&amp;M fees). Some common operating expenditure items are listed below, and all of them can have fixed and/or variable components, with different drivers for escalation:</p><ul><li>O&amp;M</li><li>Land Lease and land management fees</li><li>Grid fees (for example for a wind farm)</li><li>Cost of own consumption</li><li>Technical Maintenance</li><li>Insurance</li><li>……..</li></ul><p>It is important to mention that the <strong>Maintenance Capex</strong> is also included on this sheet. Maintenance Capex is the investment required to sustainably operate the project, such as asset replacements, which differs from the Capex during construction and can be supported by the cash flows generated during the project&#39;s operational life.</p><h4>Working Capital (WK)</h4><p>In some models, the “Working Capital” section is included in the “Operation” sheet. But we can also see it in a separate sheet in other models.</p><p>This section is closely related to the aforementioned sections in the Operation sheet. The term working capital may have a slightly different purpose or use in Project Finance compared to Corporate Finance, where it is usually used to assess the liquid assets of a company.</p><p>In Project Finance modeling, the purpose of WK section is to translate the figures on the Operation sheet <strong>from the accrual basis to cash basis</strong>, i.e. to reflect the actual cash received or paid during the periods. This is also the reason why sometimes the WK section is included in the Operation sheet just under the Revenue and Opex sections to consolidate the timing difference. In addition, the adjustments made by this section are reflected on the cashflow waterfall as NWC adjustments immediately below the revenues and expenses.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/882/1*dg5iKxzgYUMbUi0XzFO7Aw.png" /><figcaption>Illustrative: the output of NWC will go into the CFW (also cashflow statement)</figcaption></figure><p>In some models, WK items are split between debtors (e.g. revenues receivables) and creditors (e.g. Opex payables), whereas in other models, WK items are separated between trade and non-trade items.</p><p>There are several ways to model working capital adjustments depending on the relationship between delays and period duration. These technical methods include days delay, offset, the use of sum-product, etc. Also, we can use flags to model the adjustment assuming the cash flows are received or paid in a specific period. Sometimes, the modelers just assume the WK items are flat throughout the project life, especially for the non-trade items. I won’t go into the details here, and these methods can be covered in my future articles.</p><p>In this article, we have covered the first two sheets of the Calculation section. Hopefully, it is not too complicated. We will talk about Tax and Depreciation and then move on to Debt and Equity in my next articles. These topics are more technical and involve some knowledge of accounting, but I will try to break them down in a simple way.</p><p><strong>Note</strong></p><blockquote><em>Thank you for being here, the note helps me, and I hope it helps you in some way. If you have any thought or feedback, I warmly welcome you to connect with me for further exchange via </em><a href="https://www.linkedin.com/in/shihlin-chang/"><em>my LinkedIn</em></a><em>.</em></blockquote><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=83f44312dadb" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Study Note  —  Structure of Project Finance Modeling (1)]]></title>
            <link>https://medium.com/@shihlin-chang/basics-of-project-finance-model-structure-1-5a636a495bf8?source=rss-29cccc6309c7------2</link>
            <guid isPermaLink="false">https://medium.com/p/5a636a495bf8</guid>
            <category><![CDATA[project-finance]]></category>
            <category><![CDATA[financial-modeling]]></category>
            <category><![CDATA[excel]]></category>
            <dc:creator><![CDATA[Shih-Lin]]></dc:creator>
            <pubDate>Sun, 16 Apr 2023 17:48:26 GMT</pubDate>
            <atom:updated>2024-02-03T14:05:55.390Z</atom:updated>
            <content:encoded><![CDATA[<h3>Study Note — Structure of Project Finance Modeling (1)</h3><h4>Overview and Inputs</h4><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*yTw9AsKG9poMZIEg" /></figure><p>Project Finance models can be daunting, especially for those who are inexperienced. I still remember feeling panicked the first time I opened up a project finance model with 100+ sheets, each with hundreds or even thousands of rows (actually the time it took to open such models was already a bit frightening). I was very lucky to have the opportunity to work at several infrastructure equity and debt investors across Europe, the US, and Asia. Through these experiences, I gained exposure to financial models of a variety of assets in Project Finance.</p><p>Therefore, I would like to summarize what I have learned in my previous experiences and share my understanding of the basic structure of financial models in Project Finance. However, I must first acknowledge that I still have much to learn about Project Finance and modeling, and writing these articles is also a process of learning for me.</p><h4>Before we start…</h4><p>Let’s have an overview of this series of articles: here we talk about a transactional model, which is used to structure a transaction, instead of an asset management model, which serves for different purposes such as monitoring post-investment performance. I will first break down the key components of a Project Finance model — Input, Calculation, and Output, and delve into each of them one after another. While the articles will not provide step-by-step guidance on technical details, they will introduce the overarching ideas of each component or sheet.</p><p>It is important to note that project finance modeling can be applied to various underlying assets, each with its own unique business model, such as toll roads, telecom towers, BESS, and data centers. To simplify the discussion, most examples in this series of articles assume modeling renewable assets (i.e. wind and solar farms), which are common assets with relatively simple structures. And the examples in the articles are for demonstrative purposes only; thus, I would keep it as simple as possible. The more technically advanced or structurally complex parts, for instance, the setup of DSRA, MMRA, or HoldCo financing structures, will further be discussed in future articles.</p><p>Lastly, please note that any tables and graphs included in these articles are purely for demonstrative purposes. The purpose of these visuals is to help readers understand the general idea of project finance modeling and the key components of a model. Also, there is no link between the figures presented, and the data used to create them is entirely fictional. The goal is to provide a simple and clear illustration of the concepts being discussed.</p><h4>First of all, why a financial model is so important in Project Finance?</h4><p>In Project Finance transactions, there are various parties involved with multiple contracts defining the relations between these parties. Many of these contracts are of long-term nature (e.g. a 10-year PPA or 10-year fuel supply agreement) and contain a significant amount of information.</p><p>The financial model plays a decisive role as a tool to managing all the information contained within these contracts. By incorporating the terms of the contracts into the model, stakeholders can gain better visibility into the potential impact of different scenarios on the project. This enables parties to properly allocate risks, negotiate terms that are favorable to their interests, and ultimately achieve a successful outcome for all stakeholders involved.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/937/1*nTCVzTsm1Ie-0HF7-ArDPA.png" /><figcaption><strong>Illustration of players in a Project Finance deal</strong></figcaption></figure><p>Before delving into the key components of a project finance model, let’s start by taking a look at the big picture, the overall structure.</p><h3>Structure</h3><p>There is not a most correct way to set up the structure. The same project can be modeled in different manners to reach the same level of analysis effectiveness. Here, I would like to talk about one of the common structures and its breakdown. It’s important to note that other structures may also work well depending on the project and its specific features. Ultimately, the key is to understand the underlying concepts and ensure that the model is designed to meet the needs of all stakeholders involved.</p><p>Generally, the sheets in a Project Finance model can be divided into the following main categories:</p><ul><li><strong>Inputs</strong> sheets provide the basic information (also called drivers), such as dates, macro assumptions, construction cost allocation, etc., to be fed into the Calculation sheets.</li><li><strong>Scenario Manager </strong>sheet is used to navigate the model under different scenarios. We can also categorize <strong>Scenario Manager as one of the Input sheets</strong>, because essentially we change the inputs of the model when switching between different scenarios. <br>This sheet is critical for analysis. Equity investors can use it to analyze the return or NPV of projects, while debt investors can analyze the default risks associated with various conditions and assess the repayment capacity of the borrower.</li><li><strong>Calculation </strong>sheets are used to process the information from Input sheets. This section deal with the calculation of the following aspects: Construction, Operation, Debt, Equity, Tax, Depreciation, Working Capital, etc.</li><li><strong>Output </strong>sheets extract the important information from the calculation. Normally, this part includes the financial statements and cash flow waterfalls, with the latter being especially crucial in Project Finance. It’s also possible to have several financial statements at different levels, e.g. SPV and HoldCo., depending on how the projects are structured.</li></ul><p>Now let’s go deeper into the basic functions of these sheets. First, the Input sheets.</p><h3>Input</h3><p>The Input sheets serve as the foundation of a project finance model and contain essential information about the project. There are different ways to structure inputs. The structure of the Input sheet may vary, with some models dividing inputs between time-based and non-time-based sheets and others consolidating all inputs onto a single sheet. Regardless of the structure, one critical input is timing.</p><h4>1. Timing</h4><p>The timing inputs define the schedule of the project, such as the periods of construction and operation, repayment periods, COD, etc. The primary objective of the timing-related inputs is to ensure the accurate flow of information to other sheets in the project finance model, so that everything can be calculated on a correct (or same) schedule/timing structure.</p><p>As the model outputs are based on cells as elemental units, and each cell displays information for specific time periods, flags are commonly used to help structure the model. For instance, an end-of-operation-period flag can be used when assets should be written off at the end of their operational life. Typically, these flags are linked to the first rows (upper part) of each sheet, <strong>which establish a consistent structure across different sheets.</strong></p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*7Zqdp4bt17BG2H9jIQFIRw.png" /><figcaption>Demonstration of flags</figcaption></figure><p>Some elements of the timing sheet include:</p><ul><li><strong>Definition</strong> of the starting and ending of the periods (e.g. construction period, operation period, repayment period, etc.)</li><li><strong>Flags</strong> based on the definitions to be adopted in the calculation sheets: Some common flags include the operation period flag, COD flag, debt repayment flag, semi-annual period flag, etc.</li><li><strong>Counters</strong> to mark the number of periods or days. For instance: <br>- The operation and construction quarter counter indicates the XXth quarter of the operation/construction periods; <br>- The days in the month counter marks 28 days in February and 31 days in March. <br>These counters are further used in other sheets. To give an example, the allocation of construction costs can be formulated based on the mark of construction quarters, for instance, 40% in the 1st construction period and 60% in the second one.</li><li>Others: <strong>escalation</strong> and <strong>indexation </strong>to be applied to other inputs such as price curves, with the adjustments based on the proportion of days in a year (or a period).</li></ul><p>Because we can navigate the model by simply changing the timing sheet, which flows to the whole model, it is important to make the sheet flexible for adjustments. Here’s an example:</p><p>In a solar project, we might see the item “fraction of the year” to allocate the energy yield throughout the year. By making the “fraction of the year” adjustable on the timing sheet, the model remains flexible even if it is changed from a quarterly to a monthly basis. This allows for automatic and immediate adjustment of production figures on the operation sheets without the need for additional manual efforts.</p><h4>2. Other inputs</h4><p>Other inputs are more project specific, and they are clearly defined in various contracts. This is what makes a Project Finance Model different from a Corporate Finance Model: A Project Finance Model typically involves numerous long-term contracts, each of which clearly defines various inputs. As a result, it is uncommon to see just a rough assumption like a 5% revenue growth rate. Instead, many inputs are validated from specialized advisors with a thorough analysis to provide a more precise view of projection (though it is still highly unpredictable as to what will happen in 10 years). And these detailed inputs can make a model look very “thick”. The following are some common inputs:</p><ul><li>Generation profile</li><li>Price curves</li><li>Inflation</li><li>Base rates curves</li><li>Time-based OPEX (such as maintenance budget)</li><li>Debt quantum (which might be linked to debt-sizing), interest rates, repayment schedule, etc.</li></ul><p>And there are also some sector-specific inputs such as</p><ul><li>Roll-out schedule for fiber deals</li><li>Guarantees of Origin (GoO) price curves for renewable energy projects</li><li>Fleet assumptions for transportation-related models</li></ul><h4>3. Scenario Manager</h4><p>Scenario Manager serves as an instrument panel to steer the outputs of the model under different cases, making the analysis of projects more efficient. One of its significant benefits is the ability to avoid creating multiple workbooks for different scenarios. Instead, all the comparisons between different scenarios can be done on the same sheet, and any structural changes can be made in the same model, which can adjust itself under various scenarios.</p><p>As the name suggests, Scenario Manager allows for the creation of different scenarios by adjusting the entries for specific inputs. Each scenario can have numerous input items, and each input can have various optional entries. For example, the input of price curve can have multiple options, and the user can choose the “Low” price curve for the “Low Price Scenario”. After the user repeats the selection process for different inputs, the combination of these input entries can create a unique scenario. Hence, users can select and customize their scenarios according to their individual requirements.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/825/1*SGorAqLeWDKpufo2dqFayA.png" /><figcaption><strong>Scenario Manager navigates Price Selection</strong></figcaption></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/644/1*0h9s8ql-tlR0TTTNw3OvdQ.png" /><figcaption><strong>Price curves selected based on the inputs from Scenario Manager (i.e. “Low” in the grey cell)</strong></figcaption></figure><p>These scenarios can serve fundamentally distinct purposes for different counterparties. As an example, some scenarios are designed for debt sizing while others are for gauging equity returns. Usually, lenders use the table to conduct sensitivity analysis. When working as a debt investor, our company cared more about the downside protection of the projects, and thus we normally designed downside scenarios like an increase in CAPEX, price discounts of contracts, no pipeline delivery, no contracts renewal, etc., to determine whether the project can still pay debt services even if things don’t unfold as anticipated.</p><p>We can also have a <strong>data table</strong> with key metrics such as NPV (project and equity), IRR (project and equity), DSCR, DSCR min date, CFADS, etc. to perform further analysis. For instance, we can further analyze under what conditions the DSCR will decrease to a certain level or how much change in price will lead to an IRR below a certain threshold. Normally, a Macro is set up to speed up the process. It is an exquisite area of knowledge as to how to conduct the analysis to present incisive and persuasive ideas to the investment committee. In the context of this analysis, we can use Macro or the “data table” function to provide assistance. And a Macro linked to the data table is preferred since we can automatize the use of other Macros if they are needed in certain scenarios, e.g. resize the debt in different debt-sizing scenarios.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/863/1*HX6SzwCybI4BVijcN8frGA.png" /><figcaption>Demonstrative data table</figcaption></figure><p>There are some practices that can be used to optimize Scenario Manager. One such practice is constructing it on an exception-based approach, i.e. only showcasing the entries different from the Base Case on the scenario table. Another practice is using “flex” to apply to the assumptions, such as price and interest rate. However, these practices will be discussed in future posts.</p><p>This marks the end of the first article in this series where we covered an overview of the Project Finance model and Input sheets. In the next article, we will delve into the core and most complex part of the model — Calculation.</p><p><strong>Note</strong></p><blockquote>Thank you for being here, the note helps me, and I hope it helps you in some way.<em> </em>If you have any thought or feedback, I warmly welcome you to connect with me for further exchange via <a href="https://www.linkedin.com/in/shihlin-chang/">my LinkedIn</a>.</blockquote><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=5a636a495bf8" width="1" height="1" alt="">]]></content:encoded>
        </item>
    </channel>
</rss>