<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0" xmlns:cc="http://cyber.law.harvard.edu/rss/creativeCommonsRssModule.html">
    <channel>
        <title><![CDATA[Stories by Studio 29 on Medium]]></title>
        <description><![CDATA[Stories by Studio 29 on Medium]]></description>
        <link>https://medium.com/@studio29?source=rss-35f13c1c9389------2</link>
        <image>
            <url>https://cdn-images-1.medium.com/fit/c/150/150/2*Y5mpsJ9HPrvnCRixVORdgg.jpeg</url>
            <title>Stories by Studio 29 on Medium</title>
            <link>https://medium.com/@studio29?source=rss-35f13c1c9389------2</link>
        </image>
        <generator>Medium</generator>
        <lastBuildDate>Tue, 24 Nov 2026 08:11:35 GMT</lastBuildDate>
        <atom:link href="https://medium.com/@studio29/feed" rel="self" type="application/rss+xml"/>
        <webMaster><![CDATA[yourfriends@medium.com]]></webMaster>
        <atom:link href="http://medium.superfeedr.com/" rel="hub"/>
        <item>
            <title><![CDATA[A Glimpse of the Himalayas]]></title>
            <description><![CDATA[<div class="medium-feed-item"><p class="medium-feed-image"><a href="https://medium.com/@studio29/a-glimpse-of-the-himalayas-a0f191437b24?source=rss-35f13c1c9389------2"><img src="https://cdn-images-1.medium.com/max/2600/1*j-9bxC4bAh-4ihw5rH9TlA.jpeg" width="5184"></a></p><p class="medium-feed-snippet">A record in pictures of our trip to the Valley of Flowers</p><p class="medium-feed-link"><a href="https://medium.com/@studio29/a-glimpse-of-the-himalayas-a0f191437b24?source=rss-35f13c1c9389------2">Continue reading on Medium »</a></p></div>]]></description>
            <link>https://medium.com/@studio29/a-glimpse-of-the-himalayas-a0f191437b24?source=rss-35f13c1c9389------2</link>
            <guid isPermaLink="false">https://medium.com/p/a0f191437b24</guid>
            <dc:creator><![CDATA[Studio 29]]></dc:creator>
            <pubDate>Wed, 13 Sep 2023 04:30:46 GMT</pubDate>
            <atom:updated>2023-09-13T04:30:46.262Z</atom:updated>
        </item>
        <item>
            <title><![CDATA[Kochi]]></title>
            <link>https://medium.com/@studio29/kochi-d840c7191e9b?source=rss-35f13c1c9389------2</link>
            <guid isPermaLink="false">https://medium.com/p/d840c7191e9b</guid>
            <category><![CDATA[kochi-biennale-2017]]></category>
            <category><![CDATA[art]]></category>
            <category><![CDATA[studio-29]]></category>
            <dc:creator><![CDATA[Studio 29]]></dc:creator>
            <pubDate>Tue, 31 Jan 2023 04:12:23 GMT</pubDate>
            <atom:updated>2023-01-31T04:12:23.183Z</atom:updated>
            <content:encoded><![CDATA[<p>Our trip to the Kochi Muziris Biennale 2017</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*gETcXuOeIucSgRwtpM7FCQ.jpeg" /></figure><p>Armed with homemade sandwiches &amp; lassi, we boarded the Sabari Express to Ernakulam. Travelling sleeper-class, it was invigorating to feel the fresh air on our skin &amp; watch the forests &amp; paddy fields whizz past.</p><p>At Fort Kochi, our Airbnb guest house was a real disappointment. Great location but terrible amenities. We discovered later that they had taken it off their listing. We stepped out after a nap.</p><p>At a quaint café on the first floor, fresh-faced youngsters served us good coffee &amp; sandwiches. Next door was a bookshop. We browsed to our heart’s content. The owner gave us directions to the only vegetarian restaurant in Fort Kochi.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*SiN1VfpwTp8RFPtqb2DLgA.jpeg" /></figure><p>Next morning we were at Aspinwall House — the main venue of the Kochi Muziris Biennale. The morning sun lit up the white painted façade of this heritage property that had warehouses, offices &amp; a bungalow, now converted to a display centre for art.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*4JJ0vY5yLr2FxMASIzNJkA.jpeg" /><figcaption>Aspinwall House</figcaption></figure><p>Alex Steger’s architectural installation — <em>The Pyramid of Exiled Poets</em> set in the open courtyard, captured our attention. We were the first to enter its dim lit interior &amp; wind our way through the narrow passage, listening to the disembodied, overlapping voices reciting poetry.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*RaZsEogUVHUITL5cuY1YNw.jpeg" /><figcaption>Pyramid of Exiled Poets</figcaption></figure><p>The indoor exhibit <em>Defile</em> by four Russian artists was a series of life-size photographs of seven recently deceased people dressed in high-end fashion. They were in early stages of decomposition &amp; presented a disturbing sight. It was a comment on the fashion industry which is obsessed with youthfulness &amp; what is ‘hot right now’.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*0Gw8r5CvrtkOWDT2B6rc6Q.jpeg" /><figcaption>Defile</figcaption></figure><p>At the next hall, it was our privilege to watch artist PK Sadanandan painting the 15m X 3m mural titled <em>12 Progeny</em> depicting many lessons — from the value of listening, to the importance of fate, to the inequality of the caste system, to the continued role of family &amp; society. The earthy beauty of the natural pigments he uses took one’s breath away.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*vpnMJ9NPbffaLsbJ6J4_ag.jpeg" /><figcaption>Twelve Progeny</figcaption></figure><p>Stepping out into the open court we were attracted to yet another architectural structure — a graceful pavilion by Eva Schlegel &amp; Carl Pruscha. It depicts the star systems as it appeared on 12th December 2016, the opening day of the Biennale.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*tjHeldVfgFuWJfNRRfaLng.jpeg" /><figcaption>Floating into the night</figcaption></figure><p>Orijit Sen’s <em>Go Playces</em> was at once attractive &amp; fun. Depicting Goa, Punjab &amp; Hyderabad, it is about being rooted in one place &amp; at the same time about passing through.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*WpGh47_9Ln0D1D-lqt3CRA.jpeg" /><figcaption>Go Playces</figcaption></figure><p>We assembled a jigsaw puzzle of the painting with other visitors. This drew us closer to the art, the artist, the visitors &amp; to the city of Hyderabad.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1000/1*i_K_LNQ2H16YSkgq_vb-2w.jpeg" /></figure><p><em>Ghost Keeping</em> by Istavan Csakany recreates a tailoring room entirely out of wood but without the tailors. It is just larger than life-size. Alongside is a series of suits with no bodies inside. He seems to be examining the value of work and the position of labourers in society.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1000/1*nJ2Hw5RhO0zwieSsA_adjw.jpeg" /><figcaption>Ghost keeping</figcaption></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/500/1*oPQLxbVBgxSlmuiCYHfKKg.jpeg" /><figcaption>Ghost keeping</figcaption></figure><p>Remen Chopra’s <em>I see a mountain from my window, standing like an ancient sage </em>was again a very architectural piece depicting an imagined, contoured landscape. It took us back to the days when we would make models of our projects using board, thermocole etc.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*VV-tcOYFm02R_wDKvCIedA.jpeg" /><figcaption>I see a mountain from my window, standing like an ancient sage</figcaption></figure><p>We refreshed ourselves at the sea-facing cafe with passion fruit juice that was being sent daily from the hills !</p><p>Watching artist C Bhagyanath sketching effortlessly with charcoal on tracing paper was most inspiring. His <em>Secret Dialogues</em> is a story about layers, about how we add to what comes before. To express the relationship between mind &amp; body, human &amp; animal, inside &amp; outside.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*6zAyKlsHytJkkInPqD1eMg.jpeg" /><figcaption>Working on Secret Dialogues</figcaption></figure><p>Natasha-Ogunji’s work, again on tracing paper was nostalgic, taking us back to the days when architectural drawings were made on tracing paper. She has used thread embroidery on tracing paper.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/500/1*58ljWetnFOEOaBAKeCwy_g.jpeg" /><figcaption>Cheetah</figcaption></figure><p>There were many video installations in darkened rooms. Museum fatigue was beginning to set in &amp; we were unable to take in the visual — aural overload. Thoughtfully set up swings in the courtyard relieved our tired senses.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/500/1*3-DQorT8ftZtTy-n30XYtg.jpeg" /></figure><p>At Cabral Yard, architect Tony Joseph’s <em>Pavilion</em> was an air-conditioned space to accommodate 300 people for talks, screenings, performances. It was constructed from locally sourced as well as re-cycled materials.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*6Kh4Ou7wlQ-E7LjZHhfciw.jpeg" /><figcaption>Pavilion</figcaption></figure><p>Another installation that allowed us to climb &amp; experience it was by the French artists Dejode &amp; Lacombe. It stands between fantasy &amp; reality, as a comment on those able to experience a state outside the ‘normal’ as mentally-ill.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/300/1*zs8QQmosdxDgqMnoTYCxVw.jpeg" /><figcaption>La venale de Bionise</figcaption></figure><p>An auto ride took us to Sri Krishna Cafe for an authentic, vegetarian, Kerala meal. A nap later we were at the atmospheric Kashi Art Gallery to view Abir Karmakar’s amazing work titled <em>Home</em>. It is a photorealistic installation of a familiar domestic environment. There is a feeling of being enveloped within the memories of family &amp; a particular culture.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*dSeN_xi-lo1baWAryeOp7g.jpeg" /><figcaption>Home</figcaption></figure><p>We fortified ourselves with mixed fruit juice at Vasco Cafe, an unpretentious outlet serving home made fare.</p><p>At the Pavilion, at Cabral Yard, we watched a silent &amp; powerful performance by Shankar Venkiteshwaran.</p><p>‘Dal Roti ‘— the popular restaurant at Fort Kochi was full &amp; had diners waiting for a table. We parceled some dal &amp; roti &amp; coolly walked away to our nearby BnB.</p><p>Monday morning found us at the beach. After pressed coffee at Loafer’s cafe we visited Pepper House. Monday being free entry day, they opened only by 11am. We hung around waiting for the rooms to be opened. The central courtyard had Praneet Soi’s ‘cut-out’ sculptures in coir. It relates to how the culture of Kerala has organised itself around the labour &amp; power structures of coir.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*Jr21uBNrKweGDXNeWr8yPw.jpeg" /><figcaption>Cut-out Archive — Sculptures in Coir</figcaption></figure><p><em>Tears of Taj Mahal</em> is a forty-metre calligraphic scroll by one of the most important contemporary Chinese language poets — Ouyang Jianghe.</p><p><em>Shell Mycelium</em> at the Dutch Warehouse, designed by an architect-artists combine is a living structure which arises from nature &amp; returns to nature as though it never existed. According to them ‘ During major events like the Olympics, National Games, Expo etc, multiple structures are erected using heavy construction materials which are often abandoned, leaving behind ghost towns that take decades to metabolize’.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*JO5USKaQNJVmiWT7wbPv2Q.jpeg" /><figcaption>Shell Mycelium</figcaption></figure><p>An exhibition of late artist Brij Mohan Anand was illuminating. A rebel &amp; non-conformist, he was an illustrator by day &amp; an artist by night. It was heart-warming to meet his daughter — Kriti Anand who shared anecdotes from her childhood with her father.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*t2tk97vk1IaoNzs69rfvmg.jpeg" /><figcaption>Sketches</figcaption></figure><p>Crossing to the mainland we tucked into a full ‘Sadya’ at BTH. The tangy tomato pachadi was delicious &amp; I have not been able to find any recipe on the internet that comes close to it.</p><p>At Durbar Hall we took in sculptor Himmat Shah’s epic busts from Kiran Nadar’s Museum of Art.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*HjXwIT96TLFyjREJy5woGA.jpeg" /></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*Mz7AoOwKiKKBwkY2Md__Gw.jpeg" /><figcaption>Untitled</figcaption></figure><p>Gary Hill’s installation — Dream Stop — had 31 video cameras &amp; 31 projectors creating an interactive space for the viewers.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*Rdyzyud44D1EnxRd3ThZkw.jpeg" /><figcaption>Dream Stop</figcaption></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*mVZ61mf_h8Wwivwt9xS9kg.jpeg" /></figure><p>We hunted down a Subway outlet for a ‘safe’ dinner on the train back home.</p><p>Our biennial visit to Kochi had come to an end.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/300/1*XCeOZ8HYSuFgoRkLco21xw.jpeg" /></figure><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=d840c7191e9b" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[An Innovative Office Design in Coimbatore]]></title>
            <link>https://medium.com/@studio29/an-innovative-office-design-in-coimbatore-bc288cc2040c?source=rss-35f13c1c9389------2</link>
            <guid isPermaLink="false">https://medium.com/p/bc288cc2040c</guid>
            <category><![CDATA[innovative]]></category>
            <category><![CDATA[low-maintenance]]></category>
            <category><![CDATA[office-interior-design]]></category>
            <category><![CDATA[coimbatore]]></category>
            <category><![CDATA[cost-effective]]></category>
            <dc:creator><![CDATA[Studio 29]]></dc:creator>
            <pubDate>Sun, 29 Aug 2021 16:35:18 GMT</pubDate>
            <atom:updated>2021-08-29T16:35:18.793Z</atom:updated>
            <content:encoded><![CDATA[<p><strong>An Innovative Office Design in Coimbatore</strong></p><p>In December 2008, we were working with a Structural Engineering firm from the UK for the design of Ortho One, the Orthopaedic Hospital in Coimbatore. This firm had offices in London, Dubai &amp; Chennai.</p><p>It was a very good learning experience for us to work with such a reputed firm. The quality of the drawings was of a high standard, very different from the ones we were used to.</p><p>The firm saw a good potential in Coimbatore and decided to expand by opening a back office here. We helped them find suitable premises, keeping in mind their way of working, future expansion plans and of course the budget!</p><p>A location on Mill Road was finalized. There were two floors of 1500 S.Ft. each on the 2nd and 3rd floors. The first floor had a bank and the ground floor had shops. There was a basement for parking.</p><p>The space needed a lot of civil modifications, including providing toilets for the office employees.</p><p>When we inspected the premises and took measurements, there was a large room partitioned off in the south west corner on the 2nd floor, that was being used by the bank. The building owner did not permit us to inspect the room citing ‘security reasons’ and this would give a small twist to the project’s tale.</p><p>By the end of December the layouts for both the floors were finalized and we started working on the estimate based on the specifications &amp; finishes discussed with the client. The bank was very clear that they would vacate the room only after the work for the interiors began.</p><p>Being a structural engineer’s office, we were under the impression that there would be the usual workstations just like any other office. But the requirements were unusual.</p><p>Each workstation was to be 1500X750. This was to allow for a large monitor to be used and to be able to study A1 sized print outs.</p><p>The workstations had to be cost effective and maintenance free. This is where we came up with an ingenious solution — polished cuddapah stone for the verticals and 25mm thick particle board for the top.</p><p>In addition they needed a pin-up board &amp; white board. This then became a partition between the workstations.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*jsA2V3b5DX-wE8OfdiSshQ.jpeg" /><figcaption>The supports for the workstations</figcaption></figure><p>We ran the air conditioning along the periphery, allowing a good ceiling height for most of the office space.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*fnHmwj7WusT5J2rGpn3I5g.jpeg" /><figcaption>The unfinished workstations</figcaption></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/605/1*tUBl_SVKkvygPbpiJcU-bQ.jpeg" /><figcaption>The finished workstation</figcaption></figure><p>We avoided false ceilings in most areas. The electrical &amp; communication routing were carefully planned so that there wouldn’t be many exposed conduits. The conduits and the ceiling were painted dark grey so that they were not visible.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*TJPmYCNsyt1EIPi_897WUQ.jpeg" /><figcaption>A detailed view of the ceiling</figcaption></figure><p>When work began, the bank’s store room (mentioned earlier) was dismantled and to our shock, we found a 150mm raised platform to the size of the room. On enquiring with the building owner he told us that he had to add an additional RC slab as the bank’s strong room was located below &amp; the bank rules stipulate that the roof of the strong room should be 300mm thick.</p><p>This platform had us scrambling and modify the layout so that we did not lose too many seats in the office!</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*NiP-i4OWdxhle3HUyreVPg.jpeg" /><figcaption>The raised level that remained hidden from view</figcaption></figure><p>The second floor had break-out space for the employees. To make it pleasant, we worked with a local artist to paint a wall mural.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*L1xs0ueiCWg9cI-N8aJOkg.jpeg" /><figcaption>The artist at work</figcaption></figure><p>The other challenge in the project was the location of the generator for the office. The terrace was the only place available and taking it up was quite a task. The building being located on a very busy road meant that the front side could not be used to hoist the Genset on the roof. Luckily, there was a large ground on the rear side. A crane was able to reach there and lift the generator onto the terrace floor from there.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*H98TXOaE-y1A0PBQBBIZqg.jpeg" /><figcaption>The office at work</figcaption></figure><p>Keeping to the budget and the design requirements and achieving a comfortable work-space was the goal and we achieved it with a bit of innovation, good contractors and a clear brief from the clients.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=bc288cc2040c" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Designing A Factory Building]]></title>
            <link>https://medium.com/@studio29/designing-a-factory-building-8bde850e49de?source=rss-35f13c1c9389------2</link>
            <guid isPermaLink="false">https://medium.com/p/8bde850e49de</guid>
            <category><![CDATA[design]]></category>
            <category><![CDATA[coimbatore]]></category>
            <category><![CDATA[design-factory]]></category>
            <category><![CDATA[green-design]]></category>
            <category><![CDATA[architecture]]></category>
            <dc:creator><![CDATA[Studio 29]]></dc:creator>
            <pubDate>Thu, 30 Apr 2020 16:06:24 GMT</pubDate>
            <atom:updated>2021-08-29T16:23:55.482Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*IKK_WyZ3Fv6ae9lhfJZnEg.jpeg" /></figure><p>At this factory building, unique features were incorporated for ample ventilation, flexible machine layouts, future expansion &amp; water conservation.</p><p>The firm has factories for manufacturing die-sets &amp; related components in Brazil, Mexico &amp; France.</p><p>This facility at Panapatty, near Coimbatore, includes a factory building of 25,000 square feet in Phase 1 and 20,000 square feet in Phase 2, along with ancillary structures.</p><p><strong>Salient features of this project include:</strong></p><p>· Leveling of the entire three acre site to allow for future expansion &amp; ease of construction.</p><p>· A 75mm gap along the sides of the building which sets up excellent ventilation in conjunction with the monitor-roof.</p><p>· Specially insulated roof to bring down the indoor temperature significantly.</p><p>· 200mm thick RC floor slab to allow flexibility in machine layout.</p><p>· <strong>Green initiatives were:</strong></p><p>· Use of AAC blocks.</p><p>· Rain water harvesting of 2,50,000 litres.</p><p>· Anaerobic filters for recycling waste water.</p><p>. Photo-sensors to save power.</p><h3><strong>The story behind the design &amp; construction of the factory:</strong></h3><p>The client, from Sao Paulo, was a veteran in the field of setting up such facilities in diverse locations like Brazil, France &amp; Mexico. He was clear that he wanted a complete master plan before any construction was taken up.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/800/1*Ed88ijxzp4eTBnsrI4WSGA.jpeg" /><figcaption>Gently sloping site of three acres</figcaption></figure><p>We studied the topography which was mildly sloping &amp; decided to level the land before construction, for optimal layout &amp; vehicular movement.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*MqLKtbPS2GWan_qrm7nxOg.jpeg" /><figcaption>The site after cutting &amp; filling — ready for construction</figcaption></figure><p>The master plan included the factory building in phase one, ancillary structures, provision for future buildings &amp; all the services required for this.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*K1cH80Fya_cfxfdNYUvMew.jpeg" /><figcaption>Master Plan</figcaption></figure><p>The services which are the backbone of the project included: <br>power supply &amp; captive power supply<br>communication <br>compressed air<br>coolant channel <br>water supply <br>waste water treatment<br>rainwater harvesting <br>fire fighting <br>offices, stores, pantry, dining &amp; locker rooms.</p><p>A borewell was dug &amp; the water tower was built first, to ensure availability of water throughout the construction period.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/300/1*AxjYQKhNb22OIYJjz0t_Cg.jpeg" /><figcaption>First to go up</figcaption></figure><p>Next, the construction of the guard house was taken up &amp; it served as the site office for the entire period of construction.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/800/1*ksutZQ5M7pWXItkZaHeaQA.jpeg" /><figcaption>The guard-house or security block</figcaption></figure><p>The importance of the ‘guard-house’ or security room was an interesting lesson we learnt from our Brazilian client. Security was important as this site was away from the city with no habitation in the vicinity. This building included a room to meet visitors before they entered the factory.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*AwulpEdT-eXc763-WPJobQ.jpeg" /><figcaption>Guard house with look-out post on upper level</figcaption></figure><p>Levels were worked out in great detail before the foundation was done &amp; pedestals cast.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/506/1*1FCgymJAV3iLX5dJBsABlg.jpeg" /></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/600/1*kCyX6FOI_34o5ZrcNVYuaw.jpeg" /></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/791/1*o9KyIz7kOfD_6zfQO0hu7A.jpeg" /></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/707/1*Yi-1FOpHMzfinZP81mcbIg.jpeg" /></figure><p>All the requirements were listed out &amp; incorporated into the design of the <strong>PEB structure. </strong>Provision was made for a number of special requirements that were not immediately obvious. Here the experience of the client in setting up similar factories was of much help.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*UWxZHIHqorz4jSlRm4reLQ.jpeg" /><figcaption>Steel posts with brackets are up</figcaption></figure><p>A low-bay to house the support facilities like store rooms, server room, office space, meeting rooms, dining room, pantry, toilets, maintenance room etc were planned to the West of the factory floor.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*r5gQsi7oEjYLMt2Ev08_Uw.jpeg" /><figcaption>Low-bay structure to the West</figcaption></figure><p>There were special machine beds &amp; machine pits for the heavy &amp; permanent equipment. A channel was integrated into the floor to carry the coolant with chips to the coolant pit from where it could be separated &amp; disposed.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/640/1*oILeTGPVXe2JJPX0NRz36g.jpeg" /><figcaption>Machine pit</figcaption></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/640/1*qxdGw0Lw_E9VeZpRU_Jb8g.jpeg" /><figcaption>Coolant channel &amp; pit</figcaption></figure><p>The floor of the factory was designed in such a way that there was flexibility in the placement of machines. The entire floor was a reinforced concrete slab of 200mm thickness with suitable expansion joints.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/800/1*fqIUdifPtTO2xJg9K4cATw.jpeg" /><figcaption>Sub-floor ready to receive the floor slab</figcaption></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/867/1*OYOG1KAjKlrFXyky5cJe-g.jpeg" /><figcaption>Reinforcement in place</figcaption></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/480/1*r-tckyrweBfNXQZS7G_N9Q.jpeg" /><figcaption>Expansion joint detail</figcaption></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/800/1*f18qI8sCTRQc1gSQXVOnoA.jpeg" /><figcaption>Power trowelling after casting the concrete</figcaption></figure><p>The gutter design was important as the typical gutters &amp; down-take pipes provided by most of the PEB contractors were incapable of handling a heavy downpour. The gutter of 1000mm width to handle a large volume of rainwater was integrated with the framing of the roof in such a manner that one could manually access the gutter for maintenance whenever required. The downtake pipes were 200mm in diameter.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*P5J7GLQFMf-ScAtj-yfA5w.jpeg" /><figcaption>The gutter that we climbed on to…</figcaption></figure><p>Ample ventilation was achieved by three features:</p><p>1. The monitor roof</p><p>2. The 75mm gap along the sides of the building</p><p>3. The large openings that served as the entry &amp; exit for vehicles.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*tbSJGdUTZxqEr4p6l4H5OQ.jpeg" /></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*dVXVK0h3hq3fnFLimogEKA.jpeg" /><figcaption>The 75mm gap along the sides</figcaption></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*a7nNYsL2KacdQ2ERssG1Kw.jpeg" /><figcaption>Entry for heavy vehicles</figcaption></figure><p>The planning, routing &amp; laying of the electrical cables was a major project in itself &amp; the electrical consultant was on-board from the start of the planning process working closely with the client &amp; with us.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*ihbLxJS_5dVDCG24_Sa0qQ.jpeg" /></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*bqaQ1kqNeYnLXAHH4CFgJQ.jpeg" /><figcaption>Left: Cavity in the Power Room with electrical panels. Right: Incoming &amp; outgoing cables from the electrical trench inside the factory</figcaption></figure><p>The genset beds were sited close to the power room.</p><p>The transformer yard was integrated into the layout as per the TNEB norms.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/900/1*xoFrQDQgnXab2ug6Q9-iiw.jpeg" /></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/675/1*6usAF5nuxD0sKU8gJL2-ww.jpeg" /><figcaption>Left: Generators on concrete beds Right: Transformer yard with DP structures</figcaption></figure><p>The provision for the 15 ton bridge crane was done with much care as it is the heart of the factory.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*HAHp2Vt6KzYy1nsfgTh6_Q.jpeg" /><figcaption>Bridge crane goes up before the roof does.</figcaption></figure><p>We studied the rainfall data, ground water availability &amp; accordingly planned methods of harvesting rainwater. The tank with a capacity of 2.5 lakh litres was designed as a structure that was partially below &amp; partially above the ground to make it most economical. The roof was again salvaged from an existing structure on the site. It now serves to fulfill six month water requirements of the factory.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*-fDVypPUjkH37bjvhMATqw.jpeg" /></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*KFu12q82jW0YKMQkWUVE8g.jpeg" /><figcaption>Rainwater harvesting tank of 2,50,000 litres</figcaption></figure><p>Specially designed canopies extend from the main structure to protect the coolant pit &amp; the compressor.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*8wQUES7xTsJFC7HfpC4HWw.jpeg" /></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*JeGhMyfA4Fc508yxdPPwBg.jpeg" /></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*yJMUx9mAQdeDZKXP5FlcdQ.jpeg" /><figcaption>Cantilevered canopies</figcaption></figure><p>In the low-bay area, the office spaces were designed to be functional, easy to maintain yet attractive. Windows were placed at a higher level to avoid distractions.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*t4wRBA6TnZx5Vu_x1V-d6g.jpeg" /><figcaption>Office space</figcaption></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*3S9K3QcPACkNBYH9zfpRGw.jpeg" /><figcaption>The factory store room</figcaption></figure><p>The foundation for the second phase was laid, including casting of plinth beams, raising the pedestals &amp; provision of the rainwater pipes. This was to ensure the there is minimal disruption to the existing production facilities when the next phase is taken up.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*RhrkoW6y4gKBggCD4iGT4Q.jpeg" /><figcaption>Ready for Phase Two</figcaption></figure><p>It was one of those rare projects for us that was truly fulfilling. There was a free exchange of ideas between the client &amp; us. Brazil being a tropical country as well as a developing country like ours there was much to learn from them &amp; they from us.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*VrnsSoNdZq1jX84PPjhH9A.jpeg" /><figcaption>A visit by school children from a nearby school</figcaption></figure><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=8bde850e49de" width="1" height="1" alt="">]]></content:encoded>
        </item>
    </channel>
</rss>