<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0" xmlns:cc="http://cyber.law.harvard.edu/rss/creativeCommonsRssModule.html">
    <channel>
        <title><![CDATA[Stories by Tejaswi KR on Medium]]></title>
        <description><![CDATA[Stories by Tejaswi KR on Medium]]></description>
        <link>https://medium.com/@tejaswi.bgl?source=rss-b239ddd9e38c------2</link>
        <image>
            <url>https://cdn-images-1.medium.com/fit/c/150/150/0*-A7TIcN6p-XXnz3-</url>
            <title>Stories by Tejaswi KR on Medium</title>
            <link>https://medium.com/@tejaswi.bgl?source=rss-b239ddd9e38c------2</link>
        </image>
        <generator>Medium</generator>
        <lastBuildDate>Mon, 23 Nov 2026 21:51:01 GMT</lastBuildDate>
        <atom:link href="https://medium.com/@tejaswi.bgl/feed" rel="self" type="application/rss+xml"/>
        <webMaster><![CDATA[yourfriends@medium.com]]></webMaster>
        <atom:link href="http://medium.superfeedr.com/" rel="hub"/>
        <item>
            <title><![CDATA[Proposal for an IIT in Bangalore]]></title>
            <link>https://medium.com/@tejaswi.bgl/proposal-for-an-iit-in-bangalore-2c087a2b63ef?source=rss-b239ddd9e38c------2</link>
            <guid isPermaLink="false">https://medium.com/p/2c087a2b63ef</guid>
            <category><![CDATA[bangalore]]></category>
            <category><![CDATA[iit]]></category>
            <category><![CDATA[uvce]]></category>
            <category><![CDATA[bengaluru]]></category>
            <dc:creator><![CDATA[Tejaswi KR]]></dc:creator>
            <pubDate>Fri, 01 Nov 2024 04:45:00 GMT</pubDate>
            <atom:updated>2024-11-01T04:45:54.375Z</atom:updated>
            <content:encoded><![CDATA[<p>Eminent scientist and Bharat Ratna awardee, Dr. (Prof) CNR Rao has often said that India is yet to make rapid strides in terms of quality research. Hon’ble Prime Minister, Mr. Narendra Modi too has often stressed on transforming education to realize the goal of an AatmaNirbhar Bharat — an area where our great city of Bangalore has a major role to play. Be it the demonstration of Raman Effect at Central College or the rock at the Hebbal campus of UAS Bangalore, where Sir M. Visvesvaraya designed innumerable engineering marvels, innovation is ingrained in our city’s culture; the IT industry leveraged this culture, which helped our city consolidate its position as the hub of innovation. Now, the same has to be taken foward to cross newer milestones.</p><p>The Government of Karnataka has spoken of developing the UVCE “on the lines of an IIT.” <strong>Why not develop UVCE into an IIT?</strong> If there are space constraints, then the land belonging to the defunct NGEF adjoining the SMVT railway station or the space belonging to Mysore Lamps could be considered. If the Central Government fails to accept these sites, then suitable land could be identified for the institute in the Hoskote-Nandagudi-Sidlaghatta belt or the KWIN City along the Nelamangala-Dodballapur road. Land near the Kempegowda International Airport would be even more attractive, for, it is closer to Muddenahalli, the birthplace of Sir M. Visvesvaraya.</p><p>Considering the ecosystem that Bangalore has built over the last several years, the city would be ideal to establish an institute of excellence such as the IIT. The synergy enabled by the IISc, RRI, HAL, NAL, ADA, LRDE, GTRE, JNCSAR, IIM, IIIT, PPISR, and several other institutes of excellence, along with the newly formed IIT, would not only drive quality research, but also provide a conducive atmosphere to nurture the start-ups that may grow into unicorns and attain the status of Fortune 500 companies in future. <strong>In the long run, IIT-Bangalore would only enhance or elevate Bangalore’s status as India’s Premier Start-up City and a global tech hub.</strong></p><h3><strong>IIT-Dharwad is no Hurdle to Bangalore</strong></h3><p>The state of Uttar Pradesh that had an IIT at Kanpur, got one at Varanasi in the year 2012. Recently, the <a href="https://www.thehindu.com/news/cities/Visakhapatnam/proposal-to-grant-iit-status-to-andhra-university-engineering-college-revived/article68700372.ece">Government of Andhra Pradesh has proposed to upgrade the Andhra University College of Engineering and Technology (AUCoET), Visakhapatnam into an IIT-Visakhapatnam</a>. Then why can’t Karnataka have a second at Bangalore?</p><p>The state of Goa has an IIT, which is only <a href="https://www.google.com/maps/dir/IIT+DHARWAD,+Chikka+Malligwad,+Karnataka/Indian+Institute+of+Technology+Goa,+Bhausaheb+Bandodkar+Technical+Education+Complex,+Goa+Engineering+College+Campus,+Farmagudi,+Ponda,+Goa+403401/@15.4535446,74.2074519,10z/data=!3m1!4b1!4m14!4m13!1m5!1m1!1s0x3bbf32db0fffffff:0x41e1ca5b252a94d!2m2!1d74.9371485!2d15.4854994!1m5!1m1!1s0x3bbfba54fee5bafd:0x69e94eca83b5d602!2m2!1d73.9798471!2d15.4225519!3e0">126 Km from IIT-Dharwad</a> (both IIT-Goa and IIT-Dharwad were sanctioned in the year 2016). On the other hand, Bangalore is considerably far from all the South Indian cities housing an IIT (Tirupati — 275 Km, Chennai 350 Km, Palakkad — 394 Km, Dharwad–460 Km, Hyderabad — 600 Km, Visakhapatnam— 1000 Km).</p><p>By leveraging the various funding initiatives of the various venture capital investors, besides the Governments of India and the state of Karnataka, tech talent graduating from IIT-Bangalore can directly proceed with their start-up ventures. It prevents the loss of country’s top talent to other nations.</p><p>The aforesaid reasons are proof that an IIT in our city can do a lot good to the country and state, besides boosting its image as an academic and innovation hub. Petty excuses such as everything being given to one city, should not hamper the larger good that facilities in our city can create for the state and the country. In this connection, the central government must seriously consider the need for establishing an IIT in Bangalore.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=2c087a2b63ef" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[New Highways Required for Bangalore]]></title>
            <link>https://medium.com/@tejaswi.bgl/new-highways-required-for-bangalore-875c34d30f3a?source=rss-b239ddd9e38c------2</link>
            <guid isPermaLink="false">https://medium.com/p/875c34d30f3a</guid>
            <category><![CDATA[kasaragod]]></category>
            <category><![CDATA[bangalore]]></category>
            <category><![CDATA[subrahmanya]]></category>
            <category><![CDATA[magadi]]></category>
            <category><![CDATA[mangalore]]></category>
            <dc:creator><![CDATA[Tejaswi KR]]></dc:creator>
            <pubDate>Wed, 23 Oct 2024 12:58:58 GMT</pubDate>
            <atom:updated>2024-10-23T12:58:58.606Z</atom:updated>
            <content:encoded><![CDATA[<p>Bangalore is an ever-growing city. However, improving the connectivity to India’s Silicon City can help the governments diversify the cascading effect of the city’s economic growth, which also goes a long way in sustaining the growth. Therefore, upgrading some of the existing minor roads connecting Bangalore to certain other important places in the state into national highways can change the fate of the towns. Some of the roads that can be upgraded into national highways to promote further economic growth around Bangalore are:</p><p><strong>1. Bangalore — Magadi — Huliyurdurga — Nagamangala — KR Pet — Somwarpet — Bisle — Subrahmanya — Mangalore</strong></p><p><strong>2. Bangalore (Hoskote) — Chintamani — Chelur — Chakavelu — Kadiri — Nandyal — Atmakur</strong></p><p><strong>3. Bangalore — Chintamani — Madanapalle — Pileru — Tirupati</strong></p><p><strong>4. Nelamangala — Tiptur</strong></p><h3><strong>1. Magadi Road (SH 85)</strong></h3><p>The Magadi Road that starts at the Mysore Road Circle in Chamarajpet is state highway 85 that runs between Bangalore and Kasaragod covering the districts of Bangalore, Ramanagar, Tumkur, Mandya, Hassan, Coorg, and Dakshina Kannada. It touches the interior towns of Huliyurdurga, Nagamangala, KR Pet, Somwarpet, and Subrahmanya. The famous Bisle Ghat road is on SH 85. From Subrahmanya, it continues further towards Jalsoor along NH 275 and further towards Kasaragod.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*g-k_Ele_kgbLTLdSA59ZPA.png" /><figcaption><strong>Bangalore-Magadi-Nagamangala-Somwarpet-Bisle-Subrahmanya-Mangalore</strong></figcaption></figure><p>Therefore, upgrading the existing state highways 85 (Bangalore-Subrahmanya) and 113 (Subrahmanya-Uppinangady) can be upgraded to a third national highway connecting Bangalore and Mangalore, in addition to the ones via Hassan (NH 75) and Mysore (NH 275). Such a road would facilitate the development of interior towns in multiple districts of South Karnataka.</p><p><strong>Development of Magadi Road within BBMP Limits</strong></p><p>Magadi Road is probably the most neglected among all the major roads in Bangalore. It starts from the Mysore Road circle in Chamarajpet and continues as the narrow Binny Tankbund Road with smaller roads joining from Goripalya, Padarayanapura, Binnypet; the crowd of the wholesale Banana market, makes commuting difficult on the stretch sandwiched between the Binny Mill and the Bangalore-Mysore railway line. Binny Mill land must be handed over to the railways for expanding the City railway station and to improve Magadi Road within the city.</p><p>The mess continues through the Magadi Road metro station, Kamakshi Palya, Sumanahalli/Malagala Junction (Vrishabhavathi Nagar), Sunkadakatte, Herohalli Cross, Gollarahatti, to finally end at Tavarekere. Beyond Tavarekere, there are numerous blind curves up to Tippagondanahalli as one descends to the Arkavathi valley, which makes driving unsafe especially during the winters when there is intense fog. Hence this road needs to be developed.</p><p>While the portion beyond the ORR (Sumanahalli) has seen some improvement, properties must be demolished on either side between the Leprosy Hospital and Prasanna theater for a smooth flow of traffic. The entire stretch is a messy concrete jungle without a single tree; road widening allows the BBMP to plant saplings in addition to making space for other necessary infrastructure.</p><p>BDA is developing the Nadaprabhu Kempegowda layout between the Mysore and Magadi roads. One of the probable locations chosen for an international airport is in the vicinity of Nelamangala, Magadi, and Kunigal in which case, the road is poised to see a lot of growth.</p><p><strong>Boost to Tourism</strong></p><p>SH 85 has numerous spots, if developed, can massively boost tourism. First, is the Tippagondanahalli dam located amidst hills at the confluence of two rivers — Kumudwathi and Arkavathi. If developed with amenities such as a viewpoint, and a walkway, and a ropeway offering a glimpse of the backwaters up to the Goravanahalli village, this place can be a great weekend getaway for Bangaloreans. Goravanahalli, a village about 15 Km from Nelamangala, is a narrow strip of land that has the river Kumudvathi on one side and Arkavathi on the other, just before they merge into one behind Tippagondanahalli dam.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/837/1*omEIL8rDi0QlK5M_Yvtn1A.png" /><figcaption><strong>Goravanahalli Village is 11 Km from Nelamangala Toll Plaza on the Bangalore-Hassan NH</strong></figcaption></figure><p>Rivers Kumudwathi and Arkavathi are on the left and right of the spot shown in the above picture.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/892/1*WcSDwtqkApLBvUcsSEcUsQ.png" /><figcaption><strong>River Arkavathi on the Right</strong></figcaption></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/890/1*dcKxeUG1jRIFIeZTX4I5OA.png" /><figcaption><strong>River Kumudwathi on the Left</strong></figcaption></figure><p>Goravanahalli is connected by the BMTC to KR Market via Nelamangala and Yeshwanthpur.</p><p>The possibilities must be explored to create Tippagondanahalli-Goravanahalli and Manchanabele-Dabbaguli ropeways across the river Arkavathi. Houseboats offering overnight stay options at the backwaters of Tippagondanahalli and Manchanabele can be considered to boost Bangalore’s tourism.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*O8rnzUJCure8TVQcQhQHSw.png" /><figcaption><strong>Arkavathi Backwaters and Savanadurga Seen at Manchanabele</strong></figcaption></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*ueoDdYnRKP6KOoSAhGn-og.png" /><figcaption><strong>Another View of the Arkavathi Backwaters</strong></figcaption></figure><p>Magadi town that houses the historical Ranganatha Swamy and Someshwara temples, ought to be developed. Three of the nine hill forts (Nava Durgas) around Bangalore are accessible from SH 85, namely, Sawandurga, Hutridurga, and Huliyurdurga. Kempapura village that houses the mausoleum of Kempegowda can be easily accessed. Nagamangala has the historical Saumya Keshava temple.</p><p>The famous Bisle Ghat road and the Bisle viewpoint are along SH 85. The <a href="https://www.deccanchronicle.com/nation/current-affairs/300916/karnataka-the-ridge-that-divides-rainwater.html"><strong>ridge point at Vanagoor</strong></a> is known to all. But there’s another ridge near Magadi that’s not known to many.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/862/1*xpEpKdaE_iKkesWaNikY3g.png" /><figcaption><strong>Towards Magadi/Bangalore</strong></figcaption></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/902/1*EQ2XpAdpF-FHH6KwZZ7l8Q.png" /><figcaption><strong>Towards Kunigal</strong></figcaption></figure><p>Apart from the regions close to Bangalore such as Magadi and Huliyurdurga, there is Nagamangala that houses the famous Soumya Keshava Temple built by the Hoysala period.</p><p><strong>Straightening the highway between Nagamangala &amp; KR Pet provides easy access to Melkote</strong>. Following that, the road connects <strong>Ramanathapura </strong>where three famous temples — Prasanna Subrahmanya, Lakshmi Narasimha Swamy, and Ramanatha Swamy temples are located. <strong>Rudrapatna</strong>, the village of musicians from where people like RK Srikantan have come, is very close to Ramanathapura.</p><p>From Somwarpet onwards, the highway enters Coorg district, which is home to Abbimatta falls, Mallalli falls, Bisle ghat, etc., and finally the Kukke Subrahmanya temple.</p><p><strong>A road that connects several places of tourism interest to a city like Bangalore, should be made a national highway.</strong></p><p><strong>I would also emphasize the need for rail connectivity to Magadi. </strong><a href="https://medium.com/@tejaswi.bgl/magadi-on-the-rail-map-90358a9d660e"><strong>The feasibility of creating a Bangalore City — Magadi — Kunigal suburban rail corridor needs to be examined by the government</strong></a><strong>.</strong></p><h3><strong>2. Bangalore — Chintamani — Chelur — Kadiri — Nandyal — Atmakur</strong></h3><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*bJmPCBKmBUI2CHkls8QgNA.png" /><figcaption><strong>Bangalore — Atmakur/Srisailam NH</strong></figcaption></figure><p>The highway should commence at Hoskote and continue towards Chintamani, which currently is SH 82. Hoskote, Pillagumpe, Nandagudi, and H-Cross are poised for industrial and residential development as they are a part of the Bangalore district.</p><p>Kaiwara temples, Kaiwara National Park, the temples of Chintamani (Kailasagiri, Murugamalla, etc), would be along the way. From Chintamani, the highway would deviate towards Chelur (Bagepalli taluk), a border town. Chakavelu would be the last town within Karnataka.</p><p>One visit to Kadiri, Nandyal, Ahobilam, and Srisailam would reveal the number of people from Karnataka visiting these temple towns. Merchants from Tadipatri (clothing) and Banaganapalli (mangoes) do travel to Bangalore for business purposes.</p><p><strong>Hence, creating a national highway and also laying a railway line along this route starting from </strong><a href="https://medium.com/@tejaswi.bgl/why-is-the-whitefield-kolar-mulbagal-chittoor-railway-line-important-9a5c0fbead5b"><strong>Whitefield and passing through Hoskote, Chelur, etc. would boost economic growth in the region</strong></a><strong>. This line would be more beneficial to Karnataka than the proposed Kadapa-Bangalore line that only proposes to help AP by linking the Pakala — Penukonda line to Bangalore.</strong></p><h3><strong>3. Bangalore — Chintamani — Madanapalle — Pileru — Tirupati NH</strong></h3><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*9yx3a6_NfT7yPHKX5fO81A.png" /></figure><p>This is a shorter route to Tirupati from Bangalore and is 243 Km unlike the one via Kolar, Mulbagal, and Chittoor that is 270 Km. Although not a significant saving in terms of distance, KSRTC runs buses between the towns on this route. Declaring it a national highway might bring in some economic growth in these regions that are spread across Karnataka and Andhra Pradesh.</p><h3><strong>4. Nelamangala — Tiptur Highway</strong></h3><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*dZqp6SFCt0k4_NC5Bij3VA.png" /></figure><p>This road may not be required immediately, but when we think of the rate at which the Kempegowda International Airport is growing, it makes sense to ponder over whether the airport area can accommodate the third and fourth terminals.</p><p>Located almost 56 Km away from KIA and well connected by major roads including the upcoming STRR, the region between Nelamangala, T-Begur, Kudur, and Solur would be ideal for the second international airport for Bangalore. If such a thing can materialize, then the existing roads between Nelamangala and Tiptur can be developed into a national highway. Not only would it cut the distance between Bangalore and Shimoga, but also connect towns like Gubbi, Nittur, KB Cross, Chikkanayakanahalli, Tiptur, etc., to the new airport.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=875c34d30f3a" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Extending the Proposed Bangalore-Pune Expressway to Yeshwantpur]]></title>
            <link>https://medium.com/@tejaswi.bgl/extending-the-proposed-bangalore-pune-expressway-to-yeshwantpur-e3edf1d5f40b?source=rss-b239ddd9e38c------2</link>
            <guid isPermaLink="false">https://medium.com/p/e3edf1d5f40b</guid>
            <category><![CDATA[pune]]></category>
            <category><![CDATA[expressway]]></category>
            <category><![CDATA[mumbai]]></category>
            <category><![CDATA[bengaluru]]></category>
            <category><![CDATA[bangalore]]></category>
            <dc:creator><![CDATA[Tejaswi KR]]></dc:creator>
            <pubDate>Wed, 16 Oct 2024 13:46:56 GMT</pubDate>
            <atom:updated>2024-10-16T13:46:56.391Z</atom:updated>
            <content:encoded><![CDATA[<p>NHAI developing a new greenfield expressway between Bangalore and Pune/Mumbai and Delhi thereof, is indeed great news. However, Tumkur Road being the sole point of access to the expressway from the city center is a matter of grave concern, given the state of Goraguntepalya junction.</p><h3><strong>The Need for Extending BPE to the Core City</strong></h3><p>While the NHAI is developing a multimodal logistics park (MMLP) around Muddalinganahalli, KSRTC and private transport companies bound to operate their services from the newer destinations (within and outside Karnataka) that the new greenfield expressway would connect, presumably from Majestic/Anand Rao Circle/Gandhinagar; the same holds good for private cars. Trucks bringing in the agricultural produce such as onions from Bellary, Pune to the Yeshwantpur APMC are most likely to use the expressway.</p><p>A recent proposal by the Government of Karnataka to develop a second international airport for Bangalore along Tumkur road, adds to the traffic between the core city and Nelamangala/Dobbspet and worsen the traffic situation in future. We have already witnessed the congestion at Kengeri due to the incoming traffic from the new highway from Mysore.</p><p>In this context, it is viable to develop an already existing road into a major road between the Bangalore-Pune/Mumbai expressway and the area within BBMP limits. Here is the suggestion:</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/895/1*NMBQLdppgUdYz-XgkCPgsQ.png" /></figure><h3><strong>Problem</strong></h3><p><a href="https://www.google.com/maps/place/Muthagadahalli,+Karnataka+561204/@13.2867345,77.3559917,8165m/data=!3m1!1e3!4m6!3m5!1s0x3bb1d9532017fb0b:0x55de358e3045023b!8m2!3d13.2805532!4d77.3656047!16s%2Fg%2F12hl2w3dm?entry=ttu&amp;g_ep=EgoyMDI0MTAxMy4wIKXMDSoASAFQAw%3D%3D"><strong>Muthugadahalli </strong></a>or <a href="https://www.google.com/maps/place/Hulikunte,+Karnataka+561204/@13.2750329,77.3492493,1021m/data=!3m2!1e3!4b1!4m15!1m8!3m7!1s0x3bb1d9532017fb0b:0x55de358e3045023b!2sMuthagadahalli,+Karnataka+561204!3b1!8m2!3d13.2805532!4d77.3656047!16s%2Fg%2F12hl2w3dm!3m5!1s0x3bb1d7a1736d81bd:0x35767df67a722c9e!8m2!3d13.2763981!4d77.3518633!16s%2Fg%2F1hf_ck651?entry=ttu&amp;g_ep=EgoyMDI0MTAxMy4wIKXMDSoASAFQAw%3D%3D"><strong>Hulikunte </strong></a>on STRR (between Dobbspet &amp; Dodballapur) is expected to be the starting point of BPE. By the shortest existing road (shown in blue in the above picture), Muthugadahalli is around 46 Km from Yeshwantpur.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/896/1*ZNlSdNnrh_3PUtv2Bdkx4A.png" /></figure><p>The existing road i.e the Arkavathi Pipeline road, begins from the ORR (Goraguntepalya-Hebbal segment) and continues towards Hesaraghatta. However, the absence of a seamless link to the Yeshwantpur Circle necessitates a U-turn for the traffic at Goraguntepalya, which complicates the matter.</p><p>From Hesaraghatta, the State Highway 39 continues further towards Railway Gollahalli near Nelamangala (5 Km); a major district road leads to Muthugadahalli via Benachikatte Colony, Ambaligere Colony, and Iyyanahalli. However, the entire stretch is extremely narrow to handle the traffic that an expressway would bring to a densely populated and rapidly going metropolis like Bangalore.</p><h3><strong>Proposed Solution (Black line in picture 1)</strong></h3><p>The entire stretch from Yeshwantpur to Muthugadahalli must be straightened and widened to have a 6-lane carriageway with interchanges linking all the major roads that it cuts through.</p><p>A new elevated road can be developed to link the Yeshwantpur Circle and the Arkavathi pipeline road that leads to Hesaraghatta. The road must link to the Yeshwantpur-Mattikere double-decker flyover announced in budget 2023–24. Adequate provisions can be made for accommodating a metro/suburban rail corridor to connect the KWIN City.</p><h3><strong>Access Points All Along</strong></h3><p>The major roads that the proposed corridor intersects are:</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/913/1*8pJuO1TWn7uoLyvfJavnnQ.png" /></figure><p>Each of these roads can be an access point to the expressway.</p><h3><strong>Financing of the Project</strong></h3><p>BBMP, KRDCL or the PWD cannot really finance this project. Since it is meant to be an extension of the expressway, it is best funded by the NHAI. <strong>Of course, it can be a toll road. </strong>The state government can partially fund the project to create a toll-free service road as it stands to gain big from the development that follows along the road; the property and commercial taxes coming from the development alongside go entirely to the state government.</p><h3>Concluding Note</h3><p>Given the developments such as the KWIN City, and a second airport near Nelamangala/Dobbspet, the proposed connecting road is extremely important to balance the traffic situation in the coming years. Hence, it is imperative for the government to plan and develop the required infrastructure for the megapolis of Bangalore.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=e3edf1d5f40b" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Alternative Plan for Bangalore PRR]]></title>
            <link>https://medium.com/@tejaswi.bgl/alternative-plan-for-bangalore-prr-394e4700fb8f?source=rss-b239ddd9e38c------2</link>
            <guid isPermaLink="false">https://medium.com/p/394e4700fb8f</guid>
            <category><![CDATA[bangalore]]></category>
            <category><![CDATA[irr]]></category>
            <category><![CDATA[bengaluru]]></category>
            <category><![CDATA[peripheral-ring-road]]></category>
            <category><![CDATA[rpr]]></category>
            <dc:creator><![CDATA[Tejaswi KR]]></dc:creator>
            <pubDate>Tue, 14 Nov 2023 13:10:37 GMT</pubDate>
            <atom:updated>2023-11-14T13:26:12.876Z</atom:updated>
            <content:encoded><![CDATA[<p>It’s often said that Bangalore has the highest number of vehicles in India after Delhi. While Delhi has the best of road and rail infrastructure, Bangalore’s case is different; that our infrastructure has not been commensurate with the growth is no secret. In this connection, the Peripheral Ring Road (PRR) is an important project for the city, but we do not know where it is heading. The government is trying to resolve the issues of land acquisition with the farmers, but how far it would be successful is a million-dollar question. The projected amount of 17,000 crores for land acquisition plus 6000 crores for construction is a humongous amount; the state government cannot afford to spend it for a single road project, but Bangalore certainly needs it. In such a situation, it is best to think of an alternative.</p><p>Examine the below alignment:</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*_riLNuC8Yx-f9iIFDHbQeg.png" /></figure><p>The entire stretch already exists. The previous BJP government had notified this stretch as the Intermediate Ring Road (IRR). KRDCL already has plans to improve about 70 percent of this alignment under the <a href="http://www.krdcl.in/en/budgetworks-blraroundroads"><strong>Bangalore Surrounding Roads</strong></a> project. The stretches proposed to be improved are:</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*GJXlk1GlNqvn-Ob8BJBdlQ.png" /></figure><p><strong>Points to Note</strong></p><p>• Bidadi-Harohalli road is already 4-laned from the junction of Mysore Road to Kanchugaranahalli</p><p>• Budigere &amp; Anekal are already getting bypasses as part of the above proposal</p><p>• Elevated corridor serves as a bypass to Varthur</p><p>• Improvements to Chandapura-Dommasandra road are underway</p><p>• Portions of Chandapura-Anekal road have been four-laned (although it’s just not enough for the traffic the area sees)</p><p><strong>What is Missing?</strong></p><p><strong>A proper four-lane road between Nelamangala &amp; Bidadi covering Sondekoppa, Tavarekere (Magadi Road), Chandrappa Circle, Ganakal, Kakaramanahalli, and Nelligudde Tank.</strong></p><p><strong>What Needs to be Done?</strong></p><p>• All the corridors being developed by KRDCL, along with a proper Bidadi-Nelamangala corridor, must be interlinked to create a ring around Bangalore.</p><p>• If the above map is correct, then this ring road would be 208 Km in length.</p><p>• NHAI must take over the entire project and develop the entire 208 Km stretch as an eight-lane carriageway and 4-lane service roads on either side. Bangalore truly needs such roads.</p><p>As KRDCL has already done a good amount of work, NHAI needs to spend less to implement the project.</p><p><strong>If implemented, Bangalore shall have a bigger and better PRR (or IRR) at a much lower cost. If NHAI can take over this project, then the existing PRR that the state government plans to implement, can be dropped.</strong></p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=394e4700fb8f" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Majestic-Bellandur Road Suburban Rail Corridor]]></title>
            <link>https://medium.com/@tejaswi.bgl/majestic-bellandur-road-suburban-rail-corridor-8b1d748d2db8?source=rss-b239ddd9e38c------2</link>
            <guid isPermaLink="false">https://medium.com/p/8b1d748d2db8</guid>
            <category><![CDATA[bangalore-suburban-rail]]></category>
            <category><![CDATA[bengaluru]]></category>
            <category><![CDATA[bengaluru-suburban-rail]]></category>
            <dc:creator><![CDATA[Tejaswi KR]]></dc:creator>
            <pubDate>Fri, 10 Nov 2023 17:32:44 GMT</pubDate>
            <atom:updated>2023-11-10T17:32:44.582Z</atom:updated>
            <content:encoded><![CDATA[<p>I am no civil engineer but just an ordinary citizen concerned about the well being of my lovely city, Bangalore, and its people. This article only conveys my thoughts.</p><p>Bangaloreans needn’t really be apprised of the potential that the rail-based mode of transport holds in the context of addressing the city’s infamous traffic. While the metro project is doing good, suburban rail that the city is eagerly awaiting appears to be directionless. Considering the amount of money successive state governments were/are willing to spend on elevated corridors or several kilometers of tunnel roads (that would do the city no good), we the citizens of Bangalore can certainly propose that a suburban rail corridor that passes through the city center be built.</p><p>Achieving this requires the railways to take possession of the land currently owned by the Binny Mill.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*JCgVqy6nPKsloeFD.PNG" /></figure><p>A new line deviating from the existing Bangalore — Mysore line must be laid towards the Binny Mill land. Binnypet junction would become a junction where lines coming from Bangalore City station and the Mysore side of the railway line would meet. Cottonpet would be another junction where the lines coming from the City station and Binnypet, meet. <strong>The lines in yellow indicate that they are running at grade.</strong></p><p>I have never read of any suburban line being built underground, but I somehow don’t feel it is impossible. Tunnels were bored between Shivashankar Circle in Basavangudi to Mantri Square in Malleshwaram passing through densely populated areas such as KR Market, Chikpet, Tulasi Thota and Majestic for the Green Line of Bangalore Metro. Would it be impossible to do so for the suburban rail between Binny Mill Circle and Chikpet metro station? I would need an expert to confirm that for me. <strong>Anyway, the lines in black signify that they run underground.</strong></p><p>There should be an underground station at Cottonpet, for which land acquisition would be necessary to serve the requirements of all the surrounding areas such as Binnypet, Cottonpet, Sultanpet, and Ranasingh Pet; the next station would also be an underground station below the metro’s Green Line at Chikpet, thereby serving as an interchange point.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*Cb9sKy45Pbw_KPzN.PNG" /></figure><p>After Chikpet, the line moves on to touch the most important places in Bangalore — KR Market. Providing suburban rail connectivity to the city’s busiest market would transform the transportation dynamics.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*WL9cEjsRgSieSlgZ.PNG" /></figure><p>The KR Market station should be located in the space that is currently vacant owing to the demolition of Parimala, Apsara, and Pradeep theaters, as it is equidistant from Kalasipalya BMTC bus station and the KR Market. This station should also be located underground.</p><p>From Kalasipalya onwards, the line would continue below the roads of Kumbaragundi/Journalists’ Colony to eventually stop at JC Road or proceed a little further so that a station can come up at a point equidistant from both JC Road and Lalbagh Road. Here the line would be aligned parallel to the drain that runs from Kalasipalya via JC Road (the speedbreaker in front of the church), and Lalbagh Road (near the passport office). It would continue parallel to the drain to eventually resurface at Shantinagar.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*ZAdFcRjcG6_u71as.png" /></figure><p>Since it costs me nothing to mark the stations here, I am marking as many stations as possible. If one were to implement this in reality, the number of stations may come down.</p><p>Anyway, at Shantinagar, the tracks would resurface at the government land belonging to the KSRTC and BMTC, so that we have an interchange station for the benefit of commuters. Shantinagar station also serves the residents of Sudhamanagar, Wilson Garden, Langford Town etc.</p><p><strong>Beyond Shantinagar, things get more complicated as land acquisition becomes necessary, which is certainly not easy</strong>. But the government has to do it in the interest of the city as well as that of the residents of those areas who do not have the best of transport infrastructure. If they are suitably compensated, then a lot of these messed up areas can be rebuilt to have better roads, greenery, etc. The second complication is that from here onwards, the line will have to pass through the land belonging to the Ministry of Defence.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*cZRQOpDcAECJOl9C.png" /></figure><p>Anepalya, the junction of Hosur and Bannerghatta roads, must have a junction followed by Neelasandra, which is densely populated and has extremely bad infrastructure. Here, if the land acquisition is found to be challenging, then the track could once again go underground touching the vicinity of National Games Village so that Koramangala gets the benefit of the track. Finally, it would pass through the defence land in Ejipura to touch the Koramangala — Domlur road. How easy is it to get the defence ministry nod for infrastructure projects???? Not easy as we have seen, but a project of this scale, where the center too is involved, a win-all model should be worked out to lay tracks through the defence land.</p><p>The IT zone begins from Domlur onwards. Therefore, closer the line goes to the business parks, the better.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*5klXG2krjSpELoy6.PNG" /></figure><p>A railway line wouldn’t really damage Bellandur lake as it would not release effluents or sewage into the lake (as suburban trains have no toilets there is no fear of human excreta falling on the tracks). The localities of B Nagasandra and Yemalur have a good population that the stations can serve; as a matter of fact, the Belur Nagasandra station would also serve Murugeshpalya. As the land around these areas mostly belongs to the central government agencies such as HAL, DRDO etc., procuring it for a railway line may not be impossible.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*FhOO079U5s9j2LqF.PNG" /></figure><p>The red line beyond Yemalur indicates a thickly populated region where land acquisition could be difficult. However, having a suburban train station close to the Prestige Tech Park could solve a good portion of the traffic mess around Marathalli and Kadubeesanahalli areas. Beyond PTP, the line could traverse next to the channel between the Bellandur and Varthur lakes to join the Bangalore — Salem railway line just before the Bellandur Road station.</p><h3>A few more points</h3><p><strong>1.)</strong> I once again repeat that I am no professional surveyor but just an ordinary citizen concerned about the city of Bangalore that has given me, my parents and my grandparents everything to lead a good life.</p><p><strong>2.)</strong> The “survey” that I have prepared is a very very crude one and naturally does not take into consideration all the challenges that may arise during the course of implementing the project, which in reality would decide the feasibility of this proposal.</p><p><strong>3.)</strong> Land acquisition has to be done where necessary although it can be tied to a minimum.</p><p><strong>4.)</strong> Since the railway line cuts through the defence land, The Ministry of Defence should have the final say in terms of safeguarding its property on either side of the tracks. Personally, I feel they should encourage it as rail connectivity to their property helps them move the people and may be logistics into and out of their locations more easily.</p><p><strong>5.)</strong> The line knocks of multiple BMTC routes like the ones between Majestic and KR Market to Shantinagar, Anepalya, Neelasandra, Ejipura, B Nagasandra, Marathalli (just partially).</p><p><strong>6.)</strong> In future, the line can be extended to Marikuppam by laying another line that branches off at Carmelaram and touching the vicinity of Sarjapur, Mugalur, Chikka Tirupati, Jayamangala, Masti, Budikote, and Kamasamudram. Basically, it would eliminate the “dead-end” nature of Marikuppam besides providing rail connectivity to the hitherto unconnected areas of Kolar district. Such a proposal would turn Kolar to Bangalore what Noida is for Delhi.</p><p><strong>7.)</strong> The complete map of the line would be as below:</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1007/0*rKj39UZGcY3D6dDZ.PNG" /></figure><p>In future, the nearly abandoned Baiyappanahalli — Vimanapura railway line can be linked to this line at Murugeshpalya by routing it underground through the HAL Airport as below:</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*KSd7VBDYyKKZoHki.png" /></figure><p>Thanks for Reading :-)</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=8b1d748d2db8" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Thoughts on Building a Mega Rail Terminal at Majestic with Minimal Land Acquisition]]></title>
            <link>https://medium.com/@tejaswi.bgl/thoughts-on-building-a-mega-rail-terminal-at-majestic-e2686a424dec?source=rss-b239ddd9e38c------2</link>
            <guid isPermaLink="false">https://medium.com/p/e2686a424dec</guid>
            <category><![CDATA[bengaluru]]></category>
            <category><![CDATA[bangalore-city]]></category>
            <category><![CDATA[bangalore-metro]]></category>
            <category><![CDATA[bangalore]]></category>
            <category><![CDATA[bangalore-suburban-rail]]></category>
            <dc:creator><![CDATA[Tejaswi KR]]></dc:creator>
            <pubDate>Fri, 13 Jan 2023 17:00:57 GMT</pubDate>
            <atom:updated>2023-11-18T11:11:49.858Z</atom:updated>
            <content:encoded><![CDATA[<p>I am happy that the Ministry of Railways has proposed to redevelop Yeshwantpur and Cantonment terminals as the “city center”, with world-class stations amenities. But one question that still bothers me is:</p><p><strong>“Why is KSR Bengaluru/Bangalore City junction — the real city center — being ignored?”</strong></p><p>Redeveloping SBC or any other station requires much more than mere cosmetic changes with a new facade, food courts, recreation zones etc. What we really need are more platforms and tracks.</p><p>Here, I intend to share my thoughts on how the City station can be improved to help our city in a very big way. Here they go:</p><p><strong>1.</strong> <strong>Separate Long-distance and Suburban Train Traffic</strong></p><p>Due to the absence of a dedicated suburban train system, MEMUs catering to the daily passengers from nearby areas are treated on par with long-distance trains. The main City station area of SBC, should be rid of the MEMUs from Bangarpet, Tumkur, Kolar, Chikballapur etc., to enhance its train-handling capacity. <strong>But, given the space constraints at SBC, where can the MEMUs really terminate?</strong></p><p><strong>2.</strong> <strong>Create a Chamarajpet Terminus South of SBC Goods Shed</strong></p><p>To the South of the goods shed is a spot connected to the main City station (via goods shed) by a railway line that is possibly abandoned. This line runs between the Goods Shed Road and the Magadi Road (at Binny Mill Circle). Below is an image of the line clicked from the Beli Mutt Road in Cottonpet:</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*ZYUtCVGGM3BcH3_5HKXOGg.jpeg" /></figure><p><strong>Note that the railway line seen in the above image is not the Bangalore-Mysore line</strong>. It is a dead-end line that leads to a spot, which is all of 400 meters from Mysore Road at Chamarajpet (towards the left of the picture); the City station is towards the right. Building 5–6 platforms at this spot makes it a suburban rail terminus on the lines of Mumbai’s Churchgate. The trains arriving at the Chamarajpet terminus must depart 5 minutes after their arrival to prevent platform congestion, as in Mumbai.</p><p>Widening the adjoining roads provides connectivity to both Mysore Road and the Goods Shed Road.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/547/1*8jdntaQcBTfV9yxBIE2f9Q.png" /></figure><p><strong>A skywalk can be provided from the elevated SBC suburban train station to the metro station, to link the BMTC, KSRTC, metro, suburban rail, and the Indian Railways</strong>.</p><p><strong>The proposed Chamarajpet suburban rail terminus must be linked by viaducts to the Chennai and Tumkur lines with an elevated SBC station near the third entrance, right opposite to the Nadaprabhu Kempegowda metro station.</strong></p><figure><img alt="" src="https://cdn-images-1.medium.com/max/994/1*pKrhUvnjX7NH4zr-uzcWPw.png" /><figcaption>Viaduct from the Chamarajpet Terminus</figcaption></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*14jf1jrSej8KF3mlp_4fSw.png" /><figcaption>Elevated Suburban Train Station Linking SBC, Metro, BMTC, &amp; KSRTC</figcaption></figure><p><strong>The government may not have to acquire a lot of land for this project as the railways already owns most of the land through which the viaduct passes.</strong></p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*tasMZh-9SfTEmMXcCLr9Pw.png" /><figcaption>Viaduct Splitting towards Cantonment and Yeshwantpur</figcaption></figure><p>Given the troubles faced by the SWR in quadrupling the stretch between Bangalore City and Cantonment stations, the viaduct could be extended to Cantonment and Yeshwantpur. Meant exclusively for suburban trains, the viaducts rid the tracks between SBC and BNC/YPR of all the MEMUs; further, as suburban trains are exclusively operated from the Chamarajpet Terminus, more platforms are available at SBC, which eventually reduces the waiting time for long-distance trains entering Bangalore. The elevated SBC suburban train station connected by a skywalk to the bus terminals, helps people easily switch to different modes of transport at Majestic without disturbing the long-distance train operations.</p><p><strong>3.</strong> <strong>Chamarajpet Terminus is Necessary as Suburban Rail Must Reach the City Center</strong></p><p>I am aware that the redevelopment of the Cantonment station includes creating a four-platform suburban rail terminus (a dead-end station, unless I am wrong), but is BNC really the right place for it? No, in my honest opinion; suburban trains must help people easily reach different parts of the city by public transport. Having said that, there is simply no alternative or replacement to Majestic that has two metro lines, BMTC, KSRTC, &amp; private bus terminals. The same holds good for long-distance trains as well. But today, the BMTC has expanded its outreach to Chikballapur; Chikka Tirupati in Malur taluk of Kolar district has had BMTC buses from several years. Ramanagar district is already being served through Harohalli, Bidadi, Manchanabele, Magadi etc. This being the case, the proposed suburban rail plan underserves Bangalore and its suburbs. <strong>BMTC and the KSRTC run buses to Vidhana Soudha from most of these places. Simply because, there is immense demand in the morning for trains to Bangalore City Center from Bangarpet, Gauribidanur, Kolar, Anekal, Tumkur etc. The best way to meet these demands is by introducing EMUs on the lines of Mumbai</strong>.</p><p>People arriving by EMUs, alight at the elevated SBC station, walk to the Majestic metro station and take the purple line to Vidhana Soudha. Likewise, K-RIDE or SWR can’t lay railway lines between Majestic and Jayanagar or JP Nagar; people shall switch to the metro or BMTC at the SBC suburban station. KR Market shall be accessible by the metro (at SBC suburban) and Chamarajpet Terminus from where the BMTC buses from Bidadi/Ramohalli etc. bound for KR Market shall be available.</p><p>Needless to say, cabs and auto rickshaws shall be available everywhere.</p><p><strong>4.</strong> <strong>Expanding the City Station Using the Mahatma Gandhi Colony Land</strong></p><p>As evident in the below image, most of the land occupied by MG Colony is vacant. This land could be used to add more platforms at the station.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/707/1*3PVs-9RrJM_VpuuGxbNwKw.png" /><figcaption>MG Colony Land for Expanding SBC</figcaption></figure><p>As part of the rehabilitation plan, a railway block can be constructed at St. Martha’s Hospital, while the Kendriya Vidyalaya (KV) Quarters can be shifted to the KV campus next to CPRI. The Office of the Joint Director, Department of Collegiate Education (Government of Karnataka), is functioning from a building on the land belonging to SWR at the junction of Sheshadri Road and Kanakadasa Road. These offices could be shifted to the State Election Commission building on Sheshadri Road to make way for an apartment for railway officials, whose quarters would be demolished at MG Colony. The royal bungalow of the Bangalore DRM opposite to the Race Course can make way for an apartment to upgrade the city’s rail infrastructure.</p><p><strong>5.</strong> <strong>Build a one-of-its-kind Transport Hub at Majestic</strong></p><p>The presence of two underground metro lines may complicate things. But the world’s best civil engineers can be invited to explore the possibility of having an elevated rail terminal above the existing bus station at Majestic. If such an engineering feat can be achieved, then Bangalore City would be the country’s largest railway station with over 30 platforms. Presently, Howrah is said to be India’s largest with 23 platforms, which Bangalore can replace!</p><p>As the footfalls at SBC would drastically increase, the real estate value in the area would also increase. The state government or the railways could revive the 2005–06 plan for a commercial structure above the station along with multi-level parking. It can house office spaces, co-working spaces (as in the case of BTM Layout bus station), malls, budget hotels, retail outlets and more. Obviously, the parking charges at such a place could be high as it is coming up above a spot that has the BMTC, KSRTC, metro, suburban rail, and the Indian Railways together.</p><p>The revenue from such a structure could be shared between the railways and the state government.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/879/1*1Z4BfFpcjAMKdoNOKXdmLw.png" /></figure><p><strong>6.</strong> <strong>Bypass Lines for Bangalore</strong></p><p>To ensure optimum use of resources at SBC, YPR, &amp; SMVT, trains that do not terminate at Bangalore, should bypass the terminal stations. For example, Chennai-SSPN train need not enter SBC, but bypass the city completely. This is the case in Mumbai, where a Bangalore-Ahmedabad train does not enter LTT, CSMT, PNVL, or DDR terminus. Likewise, trains from Mysore end heading to Chennai or Salem should have a bypass route to avoid SBC, so that SBC can handle more trains and people from Mysore heading elsewhere, are not kept waiting between Kengeri and Binny Mill due to lack of platforms at SBC. <a href="https://bangaloremirror.indiatimes.com/bangalore/others/bengaluru-preps-for-rail-projects/articleshow/96652924.cms"><strong>The lines</strong></a> proposed under the <a href="https://timesofindia.indiatimes.com/city/bengaluru/bengaluru-industrial-rail-corridor-proposal-yet-to-take-off/articleshow/94491851.cms"><strong>industrial rail corridor</strong></a> should be pursued with all seriousness. In a recent development, the SWR seems to have obtained the consent of the railway board to carry out the final location survey for a <a href="https://timesofindia.indiatimes.com/city/bengaluru/in-the-pipeline-a-287-km-rail-network-encircling-bengaluru/articleshow/105082546.cms"><strong>circular rail project</strong></a> (<a href="https://swr.indianrailways.gov.in/view_section.jsp?fontColor=black&amp;backgroundColor=LIGHTSTEELBLUE&amp;lang=0&amp;id=0,5,1031,1033"><strong>source</strong></a>), which is good news for the city. Provisions must be made to ensure seamless movement of trains in all directions without the need for locomotive reversals.</p><p>As a second measure, trains from Mysore should start using the Mysore-Hassan-Arasikere route to avoid congestion in the Bangalore region. Except for Chennai, trains from Mysore should use the Hassan-Arasikere route. SWR could have planned or can still plan a Hejjala-Heelalige-Anekal Road-Hosur-Krishnagiri-Vaniyambadi railway line. This provides a dedicated line from Mysore to Chennai, Salem, Madurai, Coimbatore, Ernakulam, Trivandrum. While Mysore-Chennai trains take the Hosur-Krishnagiri-Vaniyambadi route, Mysore-Tuticorin/Trivandrum trains would continue along the existing Hosur-Dharmapuri route.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=e2686a424dec" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Why is the Whitefield-Kolar-Mulbagal-Chittoor Railway Line Important?]]></title>
            <link>https://medium.com/@tejaswi.bgl/why-is-the-whitefield-kolar-mulbagal-chittoor-railway-line-important-9a5c0fbead5b?source=rss-b239ddd9e38c------2</link>
            <guid isPermaLink="false">https://medium.com/p/9a5c0fbead5b</guid>
            <category><![CDATA[bangalore]]></category>
            <category><![CDATA[whitefield-kolar-line]]></category>
            <category><![CDATA[bangalore-suburban-rail]]></category>
            <category><![CDATA[whitefield]]></category>
            <category><![CDATA[whitefield-kolar]]></category>
            <dc:creator><![CDATA[Tejaswi KR]]></dc:creator>
            <pubDate>Mon, 24 Oct 2022 11:39:04 GMT</pubDate>
            <atom:updated>2022-10-24T11:39:04.515Z</atom:updated>
            <content:encoded><![CDATA[<p>Let’s get straight to the point. There are several reasons why this line is needed:</p><ul><li>Kolar, despite being a district headquarters, has no proper rail link to Bangalore and is forced to rely on Bangarpet.</li><li>The Bangalore-Kolar stretch is heavily industrialized with Whitefield, Hoskote (Pillagumpe), Tavarekere (Volvo), Narsapur, and Tamaka as the key industrial nodes. As per an update from Mr. Muniswamy, Honorable MP, Kolar Parliamentary Constituency, KIADB has proposed to set up an industrial area at Devarayasamudra in Mulbagal Taluk. Kolar is indeed an industrial suburb of Bangalore and hence deserves to be on the suburban rail map.</li><li>The Bangalore-Chennai expressway would accelerate the pace of urbanization in the Kolar district. Kolar Gold Fields (KGF) is proposed to be developed as an industrial hub. These developments are bound to increase the movement of people between KGF &amp; Bangalore, resulting in greater congestion of the already-congested trains.</li><li>Karnataka’s <strong>#BeyondBengaluru</strong> campaign to develop other cities of the state is well-intended. However, companies seeking to invest in and around Bangalore cannot be driven away from the city citing the lack of land. Such companies tend to look at Hosur in Tamil Nadu, which is not really <strong>#BeyondBengaluru</strong> but certainly <strong>#OutsideKarnataka</strong>. We are not against the development of Hosur or Krishnagiri, but <strong>FOR </strong>the development of Kolar and Chikballapur. Developing rail infrastructure to facilitate easy movement of people and goods to Bangalore, is a step in the right direction.</li><li>Kolar is a major tomato-growing hub in Karnataka. Aligning a major trunk route connecting Bangalore to the country’s Eastern &amp; North-Eastern parts would boost the export of tomatoes grown in the region to other states.</li><li>There is a KSRTC/APSRTC bus to Tirupati from Bangalore almost round the clock, which is in addition to the ones operated by the former to Srinivaspur, Mulbagal, Hebbani, Bangarpet, KGF, Punganur (AP), Chittoor, Balijakhandriga (AP), Putthur (AP) etc. Further, KSRTC and the private operators based out of Bangalore &amp; AP, serve routes such as Bangalore-Nellore, Bangalore-Vijayawada, and Bangalore-Vishakhapatnam, Bangalore-Kakinada (through Rajahmundhry) etc. via Kolar, Chittoor, Tirupati, Kalahasti, &amp; Naidupet. Trains bound for cities such as Kolkata, Guwahati, Agartala, Ranchi etc., are currently going past Chennai or at least Renigunta. Therefore, developing a Whitefield-Kolar-Chittoor railway line shortens the distance, by serving as a Bangalore-Howrah trunk route. The yield from this line is bound to be very high.</li></ul><p><strong>Alignment</strong></p><p>A tentative alignment of the line would be as below:</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*A_edpMmaW8jXrd2W" /><figcaption><strong>Overall Alignment Parallel to the National Highway</strong></figcaption></figure><p>We can zoom-in on the above map to see the individual stations.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1019/0*zTcrFSCNz8dL1_WK" /><figcaption><strong>Whitefield-Kolar Segment</strong></figcaption></figure><p>Ideally, it should deviate to the left from the Bangalore-Chennai trunk line after the Whitefield station and continue parallel to NH 648 (old NH 207) towards Hoskote, one of the most congested areas near Bangalore.</p><p>A station at Dandupalya, which is the junction of roads connecting Hoskote to Bangalore, Kolar, Shidlaghatta, Chintamani/Madanapalle, Malur, and Hosur, would facilitate the interchange with buses. The line continues further along the NH to reach Chittoor via Kolar, Mulbagal, Nangli, Palamaner, Mogli, and Bangarupalem.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*arOSA3u-k-lgmTPE" /><figcaption><strong>Kolar-Mulbagal Segment</strong></figcaption></figure><p>Connecting the existing Kolar station along with other strategically important locations such as the Narsapur industrial area and the Kolar APMC may require the line to criss-cross the NH multiple times; this is bound to push up the land acquisition costs. Hence creating a new station beside the Kolar-Tekal road (SH 99) may be a feasible idea.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1020/0*xU-M657sEbxLIXxP" /><figcaption><strong>Mulbagal-Nangli Segment</strong></figcaption></figure><p>Nangli station should be developed on the lines of Panvel station in Navi Mumbai. Panvel is the terminus for harbor line trains operated by the Central railway from CSMT Mumbai, while the long-distance trains plying through the Konkan Railway route continue without any hindrance. Likewise, Nangli must be the terminus for Bangalore Suburban Rail project area, while long-distance trains can continue further. The station areas of suburban and long-distance trains shall be located beside each other and seamlessly accessible from one another for passengers.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1006/0*ZNvi7md4EUDqaFVp" /><figcaption><strong>Nangli-Chittoor Segment</strong></figcaption></figure><ul><li>As mentioned, stations within AP can be built at Palamaner, Mogli, Bangarupalem and any other place found feasible.</li><li>To avoid engine reversals, the line must enter Chittoor from the South (Vellore end). If this involves more land acquisition, the alignment can be modified to Bangarupalem-Kanipakam-Pakala Junction.</li></ul><p><strong>Challenges Around Bangalore</strong></p><p>High cost of land acquisition is the biggest challenge. While the satellite view of Google Maps shows the space along NH 648 to be empty, one cannot completely rely on it. The same satellite view shows routes being created beyond the Devanagonthi station. Is it for the Whitefield-Kolar railway line? Possibly so as Former CM, Mr. BS Yediyurappa in 2019, had sent a revised proposal to the central government for implementing this project. <a href="https://www.deccanherald.com/state/new-proposal-for-whitefield-kolar-rail-line-773690.html">Source</a></p><figure><img alt="" src="https://cdn-images-1.medium.com/max/666/0*iz2P78K8Fc4O8bic" /></figure><p><strong>Possible Alignment for the Whitefield-Kolar Railway Line</strong></p><p>If imagined as a straight line towards the national highway, this would lead to Narsapur Industrial Area. Hence, it could be the new revised proposal sent by the state government to the railway ministry.</p><p>There is no clarity regarding the alignment for this project (despite being approved) as it has never been made public. This is very much unlike the Hubli-Ankola railway line, whose alignment map is available in the public domain.</p><p><strong>A Relatively Inexpensive Alternative Alignment to Tirupati from Bangalore</strong></p><p>Linking Chintamani (instead of Srinivaspur) to Madanapalle, allows trains from Bangalore City to reach Tirupati via Yelahanka, Devanahalli, Chikballapur, Shidlaghatta, Chintamani, Madanapalle Town, Madanapalle Road, Pileru, Pakala Junction, &amp; Chandragiri. While this allows more trains to ply through Chikballapur, it once again deprives Kolar of the rail connectivity to Bangalore that it very much needs.</p><p>One of the news from Andhra Pradesh is that the state government there is not willing to share the project cost or the land for free to implement rail projects. In comparison with the Whitefield-Kolar-Mulbagal-Chittoor project, this alignment works cheaper as it is very short. Since Karnataka &amp; Andhra Pradesh must acquire very little land to make this line a reality, the cost burden on both states is minimal.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1013/0*jce9S8C_lsDzsakT" /></figure><p><strong>Chintamani — Madanapalle Road Railway Line</strong></p><p><strong>Final Note</strong></p><p>In any case, the Whitefield-Kolar-Chittoor railway line project must be implemented to support the growth and development of Kolar district. If developed, Kolar and Chikballapur to Bangalore can be what Gurgaon &amp; Noida are to Delhi.</p><p>Forgotten amidst all these regions is the Bangalore Rural District, which continues to be deprived of rail connectivity to Bangalore.</p><ul><li>Nobody knows why the Bangalore-Tumkur line avoided Nelamangala in the past. Except for slow passengers, no express trains stop at Gollahalli, which is the equivalent of Nelamangala en route to Tumkur.</li><li>Not many trains really ply on the Hassan line and the few that ply towards Mangalore/Karwar are said to skip Nelamangala.</li><li>Dodballapur has good rail connectivity, which is of no use as no express train (except for Udyan Express) stops there. In fact, most trains even skip Gauribidanur but not Hindupur.</li><li>Rail tracks through Devanahalli aren’t really serving any purpose. Chikballapur must ideally be linked to Satya Sai Prashanti Nilayam via Gudibande &amp; Bagepalli, following which it would be a trunk route connecting Bangalore to Hyderabad, Nagpur, Bhopal, Agra, Delhi, &amp; the rest of North India.</li><li>People of Hoskote must rely on either Whitefield (Bangalore Urban District) or Devanagonthi station (in Hoskote Taluk of Bangalore Rural District) to board a train. Once again, it must be noted that only a few passenger trains stop at Devanagonthi and Whitefield. More trains stop at KR Puram, which is well inside Bangalore City.</li><li>The case in Anekal Road (Bangalore Urban District) is no different. Most trains may skip Anekal, but they mandatorily stop at Hosur.</li></ul><p>Somehow most elected representatives are either unaware of all these points or just do not care about it. Ultimately it is the citizens who suffer. All of this must change, but when would it?</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=9a5c0fbead5b" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Magadi on the Rail Map]]></title>
            <link>https://medium.com/@tejaswi.bgl/magadi-on-the-rail-map-90358a9d660e?source=rss-b239ddd9e38c------2</link>
            <guid isPermaLink="false">https://medium.com/p/90358a9d660e</guid>
            <category><![CDATA[bangalore]]></category>
            <category><![CDATA[magadi-road]]></category>
            <category><![CDATA[bengaluru]]></category>
            <category><![CDATA[bengaluru-suburban-rail]]></category>
            <dc:creator><![CDATA[Tejaswi KR]]></dc:creator>
            <pubDate>Mon, 24 Oct 2022 11:06:32 GMT</pubDate>
            <atom:updated>2022-10-24T11:06:32.285Z</atom:updated>
            <content:encoded><![CDATA[<p>Magadi is an important suburb of Bangalore with immense potential to grow, thanks to projects such as the Nadaprabhu Kempegowda Layout and the Major Access Road (MAR). Residents of areas in and around Magadi commute to Bangalore on a daily basis for work. While several buses ply between the city and Magadi everyday carrying thousands of people, the supply falls short of demand. Bangalore Metro Rail Corporation Limited (BMRCL)’s plan for Magadi road to connect Hosahalli and Kadabagere Cross in phase 3, does not make life easy for commuters.</p><p>While there is adequate traffic between the towns of Bangalore, Magadi, and Kunigal, the population density in the regions between them is inadequate to justify the investments on a system like metro rail. A better option would be to create a Bangalore-Magadi-Kunigal suburban rail corridor that puts Magadi on the rail map, besides helping over a million people in less than a decade from now.</p><p>A very legitimate concern regarding such a project for the government is land acquisition. If technology is used, then the railway line can be laid with minimal acquisition of land. But how?</p><p><strong>The Arkavathi Pipeline Road!</strong></p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*0go6F0CU35LQzgjN" /></figure><p>The Arkavathi pipeline road runs from Tippagondanahalli to the Rajajinagar water tank near the sub-registrar office. It provides connectivity to some of the densely populated areas such as Sunkadakatte, Herohalli Cross, Andrahalli main road, and Tavarekere.</p><p>If the defunct pipeline were to be replaced by two electrified broad gauge rail tracks, then the commuting scenario in West Bangalore would undergo a sea change.</p><p>The pipeline could be laid below the ground as done in Tendersure roads when the government would pump the water from the Tippagondanahalli dam to Bangalore City. The Internet-of-Things (IoT)-based approaches could help the BWSSB track leakages in real time, even then.</p><p>Now the question arises on how to link this track to the Bangalore-Tumkur railway line near Rajajinagar. The pipeline road ends at the Rajajinagar water tank located between Rajkumar road and the Chord road. If we look at the portion beyond, although there is developed land, we do see some vacant land, most of which is probably not owned by private parties. Here is a screenshot:</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*MTS_NgVKSbkEurNl" /><figcaption><strong>The New Track Branches off From the Tumkur line towards the Pipeline Road at Rajajinagar</strong></figcaption></figure><p>Let’s zoom in a little and see the landscape in the satellite view:</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*ZdMaIRlOG3DZ2_y1" /><figcaption><strong>The landscape between Rajkumar and Chord Roads on the extended Portion of Pipeline Road</strong></figcaption></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*GxdISSAdRp_FYeVY" /><figcaption><strong>The landscape between Rajkumar Road and the Tumkur Railway Line</strong></figcaption></figure><p><strong>The playground of Vivekananda College will have to be acquired for the project. The Milk Colony Park described in the map will have to be taken over, in addition to some land that may be owned by the Teresa Hospital.</strong></p><p>Considering the above suggestions, one possible alignment of the Bangalore-Magadi-Kunigal Railway Line would be as below:</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*X1jkqvugxomOO_lv" /><figcaption><strong>Complete Alignment with All the Stations Marked</strong></figcaption></figure><p>The next few images would be the zoomed-in versions of the above image depicting the individual sections of the complete line.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*KKQ2OUuJQcpRRFNO" /><figcaption><strong>Section 1 Alignment</strong></figcaption></figure><p><strong>Section 1</strong></p><p>The line branches off from the Bangalore-Tumkur railway line at Rajajinagar, right beside the Brigade Gateway, and continues through the Milk Colony Park and Vivekananda College Grounds and probably, the land belonging to Teresa Hospital.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*Qa9mBAIccFESdcYL" /><figcaption><strong>Section 2 Alignment</strong></figcaption></figure><p>There is a dip in the gradient between Rajajinagar and Laggere (on the ORR) and again a fairly steep ascent towards Sunkadakatte, due to the Malagala valley through which a tributary of the Vrishabhavati flows parallel to the ORR. It’s presently called Vrishabhavati Nagar. Depending on the technicalities associated with the acceleration and deceleration of a train in both the directions, building a viaduct across the Malagala Valley between the Vrishabhavati Bank and Laggere stations may be required. Naturally, the track cannot intercept the super-busy ORR at grade.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*zhfxrPdBlYl3Udn_" /><figcaption><strong>Section 3 Alignment</strong></figcaption></figure><p>Again, these are all the areas that the metro does not connect and therefore, it is in the interest of the residents of all these areas that the Bangalore-Magadi-Kunigal railway line project must materialize.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*YvS6LLnYSAhp1Pvk" /><figcaption><strong>Section 4 Alignment</strong></figcaption></figure><p>There are a lot of residential localities in the vicinity of the project such as Herohalli, Andrahalli, Anjana Nagar, Nagarahole Nagar, Tigalarapalya, Vighneshwar Nagar, etc., that are not very planned and lack adequate road connectivity.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*A9uI5-_Rkddq-gdC" /><figcaption><strong>Section 5 Alignment</strong></figcaption></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*ZBPqgSbaqh8tgj11" /><figcaption><strong>Section 6 Alignment</strong></figcaption></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*TCZNm73L9spVwxIS" /><figcaption><strong>Section 7 Alignment</strong></figcaption></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*vXqMiCZ48I2sGCGx" /><figcaption><strong>Section 8 Alignment</strong></figcaption></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*ZnaiSiFPFQxgBrf_" /><figcaption><strong>Section 9 Alignment</strong></figcaption></figure><p>Gangappanahalli station would solve the commuting woes of people who have purchased sites in the private layouts in and around Chandrappa Circle, Big Banyan Tree, and Ramohalli, but are wary of shifting there due to the difficulties associated with commuting to the office. BMTC buses commencing from some of the villages in Ramanagar district such as Manchanabele, Dabbaguli, VG Doddi, Katamanadoddi, Hagalahalli, etc., instead of going all the way to KR Market via Kengeri or Tavarekere, can connect to these stations.</p><p>If developed with viewpoints and perhaps a ropeway to the Goravanahalli (visible in the image above), which is a narrow strip of land between the rivers of Kumudwathi and Arkavathi, Tippagondanahalli dam would be a major tourist hub for visitors from Bangalore.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*x9ZL4nOrkg7IJYiV" /><figcaption><strong>Section 10 Alignment</strong></figcaption></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*n-ph7QCEqsrxkSZU" /><figcaption><strong>Section 11 Alignment</strong></figcaption></figure><p>Magadi is important for Bangalore from a tourism standpoint as it houses two of the important temples — Magadi Ranganatha Swamy (towards Bangalore) and Prasanna Someshwara (towards Kunigal/Huliyurdurga).</p><p>Beyond Magadi town, on the road leading to Kunigal, is a ridge point where the rainwater flowing into the rivers Shimsha and Kanva is located. Since the junction where roads connecting Magadi to Kunigal and Kudur (&amp; also Tumkur) is at a stone throw distance, it can be an important transit point for switchover to buses. Hence a station is required near the ridge.</p><p>Kempapura is where the tomb/mausoleum of Kempegowda (I am unsure if it is of Kempegowda I or his grandson Kempegowda II) is located. Connecting it by rail would be a boost to tourism.</p><h3>Latest Developments</h3><p>Hon’ble Deputy CM, Dr. Ashwath Narayan, who hails from Magadi, and is also the Ramanagar district in-charge minister, recently announced the setting up of a Sanskit University in Magadi, besides an industrial area for the town. The survey for creating a Bangalore City-Magadi-Kunigal suburban rail corridor, will have to factor these aspects and ensure these sites receive the benefits of rail connectivity.</p><p>If the land acquisition near Rajajinagar proves challenging, then an alternative can be worked out.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*dDaOkMw_iZNR6GmM" /></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*H94NM41ICi98NqPS" /></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*yMmBOoN-WhdITQ8z" /></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*T3Ry7TvkZEB8R8-6" /></figure><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*94J77RQgs2unBlJf" /></figure><p>From Bedarahalli onwards, the line would take the same alignment as the one proposed, which is the Arkavathi pipeline road.</p><p><strong>Conclusion</strong></p><p>Bangalore-Magadi Road is a high-density corridor that needs attention. While the BMRCL has drawn up plans to connect Kadabagere Cross by the metro in phase 3, it would cater only to a small subset of the population using the SH 85. With the four-laning of Magadi Road followed by the developments such as Nadaprabhu Kempegowda Layout by the BDA, the traffic along the road is bound to increase in the coming years. Hence, building a suburban rail corridor linking Kunigal to the core Bangalore City via Magadi would be a more scientific step in tackling the congestion.</p><p><strong>This proposal had been mailed to Mr Tejasvi Surya, Honorable MP of Bangalore South Parliamentary Constituency, who in turn, had emailed the same to the then Minister for Railways, Mr Piyush Goyal, keeping me in the loop.</strong></p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=90358a9d660e" width="1" height="1" alt="">]]></content:encoded>
        </item>
    </channel>
</rss>