Sitemap
Junctioneer 2008 2017

West Toronto Junction A blog about Toronto’s Junction 2008 to 2017. The junctioneer blog archives contain thousands of posts starting April of 2008 to today. You can search the entire archive using the search box above. Type anything, a street name, a business, a event, a project

Tarragona Blvd with meat processing building at far

--

Get junctioneer’s stories in your inbox

Join Medium for free to get updates from this writer.

This is quite a simple post, to highlight how much the stockyards area has changed and is changing further. Tarragona Blvd runs from Symes Road a street that was once one of the main through-ways into the meat processing area above St Clair Ave., and is still used by some meat packers thankfully. (keeping the junction’s ways and means alive) Looking east form Tarragona Blvd you see in the distance the current BUNGE plant (brick coloured in middle of road on horizon) on the site of the Swift meat packing company. The loss of this plant to a new development (non-industrial) will remove one of the last important parts of the junctions industry. By the way, the entire length of Tarragona Blvd you see in the above picture was a meat packing plant 12 years ago.

--

--

Junctioneer 2008 2017
Junctioneer 2008 2017

Published in Junctioneer 2008 2017

West Toronto Junction A blog about Toronto’s Junction 2008 to 2017. The junctioneer blog archives contain thousands of posts starting April of 2008 to today. You can search the entire archive using the search box above. Type anything, a street name, a business, a event, a project