CHECKLIST

PHASE 1 - PRE CONSTRUCTION

  1. Land & Legal Verification

  2. Budget Planning & Contract Agreement

  3. Design & Drawing Finalization

  4. Site Setup & Preparation

  5. Family Needs & Functional Planning

PHASE 2 – EXCAVATION & FOUNDATION CHECKLIST

  1. Soil Testing & Site Preparation

  2. Excavation Work

  3. PCC (Plain Cement Concrete)

  4. Footing Reinforcement & Shuttering

  5. Footing Concreting

  6. Plinth Beam & Damp Proof Course (DPC)

  7. Drainage & Plumbing Preparation

PHASE 3 – RCC SUPERSTRUCTURE CHECKLIST

  1. Column Construction (Foundation to Slab)

  2. Beam Work (All Levels)

  3. Slab Casting (RCC Floors)

  4. Staircase Construction

  5. Structural Quality Checks

  6. RCC Guidelines (Do’s & Don’ts)

PHASE 4 – BRICKWORK & WALLS

  1. Masonry Material Inspection

  2. Wall Construction & Alignment

  3. Door & Window Openings

  4. Electrical & Plumbing Provisions

  5. Wall Bonding & Structural Integration

  6. Pre-Plaster Inspection

PHASE 5 – PLUMBING WORKS

  1. Underground Drainage System

  2. Internal Plumbing Installation

  3. Bathroom Waterproofing

  4. CP Fixtures & Internal Fittings

  5. Kitchen & Utility Plumbing

  6. Overhead Tank & Pump Setup

  7. Final Testing & Handover

PHASE 6 – ELECTRICAL WORKS

  1. Load Calculation & Planning

  2. Distribution Board & Safety Systems

  3. Conduit Installation in Slab

  4. Wiring Standards & Materials

  5. Earthing & Lightning Protection

  6. Switchboards & Lighting Layout

  7. Testing & Final Handover

PHASE 7 – WATERPROOFING

  1. Bathrooms & Toilets Waterproofing

  2. Balconies & Utility Areas

  3. Terrace / Roof Treatment

  4. Water Tank Waterproofing

  5. External Walls & Basement Protection

  6. Waterproofing Guidelines (Do’s & Don’ts)

PHASE 8 – FLOORING, TILING & GRANITE

  1. Surface Preparation Before Tiling

  2. Tile Contractor Selection & Agreement

  3. Granite Frames Installation

  4. Tile Installation Process

  5. Wall Tiling Works

  6. Staircase Tiling / Cladding

  7. Grouting & Finishing

  8. Final Protection & Handover

PHASE 9 – FINISHING WORKS

  1. Internal & External Plastering

  2. False Ceiling Installation

  3. Interior & Exterior Painting

  4. Doors, Windows & Cabinet Work

  5. Floor Protection During Finishing

  6. Final Fixtures Installation

PHASE 10 – FINAL WORKS & HANDOVER

  1. Final Fixing of Doors & Windows

  2. Plumbing Fixtures Installation

  3. Electrical Fixtures & Lighting Setup

  4. Final Inspection of Flooring & Finishes