Software Development Process
Table of Contents
- Preface
- How do we start a software development
- Gather software Values, MVP Features, Scope, Budget, and Requirements.
- Do a Research for detailing the software features and technologies.
- Calibrate software Scopes, Limitations, Timeline, and Budget.
- Start the development using Agile methodology.
Preface
In software-development, sometimes every developer has a doubt about this common problem:
How to deliver software confidently if they faced a fixed/flexible timeline for any types of software scale (based on it’s complexity).
Too many factors that would determine how the development process.
In this article, we will learn some tricks how we deal with this situation (although this explanation not a silver-bullet to handle every situations).
How do we start a software development?
- Gather software Values, MVP Features, Scopes, Budget, and Requirements (Software Requirement Specifications).
- Do a Research for detailing the software features and technologies.
- Calibrate software Scopes, Limitations, Timeline, and Budget.
- Start the development using Agile methodology.
A. Gather software Values, MVP Features, Scope, Budget, and Requirements.
- Values
Software built based on solution initiation for common problem in real life, so we need to gather this information on the first place.
Ask the software-owner to explain about this questions:
What are the problem/s should be solved with the software?
Due to each software has one or more feature that build a software identity, we need to gather MVP features on the second place.
Ask the software-owner to explain about this question:
What are feature/s that support the solutions?
- Scope
Software scopes limit the software functionality based on feature capability. Discuss with software-owner to finalize the scope based on these criteria:
1. Target user market (based on end-user categories such as age-level, specialization, and region)
2. Solution scale (simple, intermediate, wide)
3. Available Budget (prioritized for MVP Features)
4. Technology Environment (target device, network, online/offline application, centralized/decentralized scope, etc.)
5. Development Timeline (fixed / flexible / staged)- Budget
Determine software development budget base on these calculation considerations:
1. Development timeline / roadmap (flexible / fixed / staged)
2. Infrastructure Cost (Technology used by software including development and production environment)
3. Total of MVP Features (along with each development weight, priority, timeline, and additional-cost based on each feature needs)
4. Development Team Members (calculation based on man-power to finish the development)- Requirements
Determine software detail requirements to achieve software-goal based on these criteria:
1. Technology and Market Research (optional)
2. Software Design (required - Console or UI/UX that affect user-capability to use the software )
3. Business Flow / Data Flow (optional)
4. Feedback Tools (optional - keep end-user stay in touch to improve software)B. Do a Research for detailing the software features and technologies
Sometimes we need do research before we start to develop the software by analyze both feature and technology specifications based on software-owner requirements (only if we never experienced current software scope).
B.1. Feature
There is no software that reach 100% score, but keep in mind that every software must have core features (MVP Features) which reflect software goal.
Features can be breakdown by how software operates to solve the problem (solution type: simple | complex | staged).
Follow these steps to determines features you need:
- Determine what are needed interfaces (console or user-interface)
- Main page (required)
- Configuration page (optional)
- Feedback page (optional)- Describe all details for each interface (sub-interface based on determined scope)
- Describe each interface functionality
- Menus
- Each menu main interface (listing data, form, statistic, etc.)
- Each menu functionality (displaying data, data/business logic, background process, etc.)- Describe additional services to support software functionality
- Storage (database, file-system, etc)
- Social Media Integration
- Specific hardware supports
- etc.B.2. Technology
Each software always need technology support to run it’s functionality. Do a research to determine these needs :
- Target Deployment Device (computer, phones, wearable devices, specific device, etc.)
- Storage and Database (cloud database or local database, logging system, etc. )
- Third Parties Services (another software, social media accounts, CRM, etc.)
- Additional Devices (based on target business needs such as network-infrastructure, multi-media, etc.)
C. Calibrate software Scopes, Limitation, Timeline, and Budget
Before software development started, we need to calibrate software-analysis-result along with software-owner. The main goal of this meeting is to finalize the software design based on agreement from both sides related to scopes, limitation, timeline, and budget.
Get Vinsensius Angelo’s stories in your inbox
Join Medium for free to get updates from this writer.
Finding best software development planning it not easy, but we can take conclusion based on slices of every analyst result just like venn-diagram as below (in the illustration we use 3 domain that intersect each other). If both-sides (software-owner and developer) agree to accept intersection and it’s limitation, we could proceed to next phase (development).
C.1. Scope
Software scope must be focused at feature main-functionality only. Every functionality that not reflecting important reason should be take out.
The following are a list of criteria for determining whether a functionality is required for software scope:
- Support development timeline planned by software-owner (if research needed, only use a short amount of time).
- Infrastructure or third-parties-support cost a budget that can be covered by software-owner. (optional)
- Prior to use simple solution and not complexity (use complex solution for next development only — upgrade phase).
- Interface design (UI — User Interface) should be minimal (beautiful interface consume tons of time for development).
C.2. Limitation
Every software must have a solution limitation according to software-context (target market, environment, budget, and development-timeline).
Developer must confirm this limitation before development process begin. If there is/are constraint/s, we need to suspend the development until agreement settled.
C.3. Timeline
Development timeline must be agreed between both developer and software owner and must be done by both side until the end of development. If there is/are constraint/s, we need to suspend the development until agreement settled.
Timeline can be negotiable as long as these criteria fulfilled:
- MVP Features, Scope, budget already fixed (no more big revisions).
- Software concept revision must at small scale (predicted or limited by developer) and not changing software scope.
- Required research can be calculated precisely (optional)
D. Start the development using Agile Methodology
Before we start the development, it would be nice if we understood about agile development. If your not familiar with agile-method on software development, please take a look about this article.
D.1. Agile Methodology
In short overview, agile methodology can be described as below:
Agile methodology is a type of project management process, mainly used for software development, where demands and solutions evolve through the collaborative effort of self-organizing and cross-functional teams and their customers.
D.2. Agile Development Cycle
Agile development has an events which reflect development cycle (usually we called it sprint-period — amount of time used to run cycle activities). This development cycle implemented to help development process run faster with splitting software features development into small parts and divide the feature-backlogs according to the priority of each sprint-period (each feature developed using staged-priority measurement).
Sprint-period can be set varied depending on how long we agreed about 1 cycle capacity (finish some features based on team development capacity and feature-weight). For example, 4 feature (similiar weight) can be finished in 1 cycle (2 weeks, 1 week=5 work day).
Agile development cycle activities consist described below:
- Plan
This activity designed to collect prioritized features to be done on current sprint-period. Development team has their rights to determine how many feature can be finished based on their work capacity and feature-weight.- Design
This activity designed for detailing all feature's requirements and finalizing feature's concept that need be implemented on software (minimize revisions on the future development). This design can be shaped into Console / UI design, data / business flow, wording, DOD specification (Definition of Done - standard software feature acceptance), etc.- Develop
This activity is set for development phase. Development team implement feature into software source-code based on finalized concept and requirements.- Test
This activity is set for testing phase. Testing can be done either software-engineer or quality-engineer. A feature can be set as done only if fulfilled the specified requirements and DOD specification. Each feature must be build into staging/testing software that can be tested by tester.- Release
This activity is set for merging finished-features into software at production environment. Each release strongly recommended to follow semantic-versioning standard.- Feedback
This activity used for feedback collection from software-owner or end-user (if any). Type of feedback:
- Bug report (need fixing)
- Improvement report (new functionality)With these approach developing software would achieve few advantages:
- Fast and agile development process (focus on MVP Features) — release early, release often .
- Feedback capability with software-performance early-test from market interest.
- Keep the software-owner business run smooth with minimal effort and long-term innovation (business strategy).
D.3. Agile Project Management Tools
We can found many project-management software or services that support agile-methodology such as Atlassian Confluence, Pivotal-Tracker, etc. (read more). Each tool has it’s own benefit, so we can choose the tool based our requirement and suitable features.
Conclusions
While preparing software development it’s not quite easy, please keep in minds that analyzing software development is good for developer’s reputation. The reason why we need to analyze software development before it started are explained as below:
- Software focused to solve the problem of end-user with minimalist efforts and limited scope, not to reach all solution outside the solution scope.
- Keep software development running smooth according to agreed timeline.
- Minimizing software development from infinite-revisions (because software goals can be changed arbitrarily by software owners).
- Possibility of next phase development due to business-need or upgrade-request from software-owner (there is no 100% perfection on a software).
At the end, we must be selective in choosing when we need to implement this development approach (suitable only for medium / high scale software development and not for simple software development that can be build on one day only).
Thanks & Happy Development ! :D