EDiscovery is broken. Here’s how to fix it.
The pED Proportional EDiscovery Model for Litigation
In December of 2006, the Federal Civil Rules of Procedure (mainly FRCP 34) were updated to reflect the fact that discovery was no longer a paper based process, but involved large volumes of Electronically Stored Information (ESI). Nine years later, in December of 2015, the rules were quietly amended once again. Three major changes should give pause to litigants using the Socha-Gelbmann EDRM Model of EDiscovery.
The EDiscovery Reference Model widely in use today relies on outdated assumptions about the way ESI (Electronically Stored Information) is stored and managed in organizations. A cottage industry of collection, preservation, review and processing technology vendors has been immeasurably enriched due to the widespread adoption of that model in which ESI with little to no relevance to the litigation at hand is copied, reviewed, copied, searched, reviewed, copied, produced, searched, reviewed, etc. while being dissected and reconstituted into forms that little resemble the original content.
ESI in corporations today is not predominantly stored as files on local hard drives and has not been for the last decade. ESI today includes abundant Cloud Services (often under the control of third parties), large collaborative systems (including chat, webcast, and document sharing systems), relational and post-relational (Big Data) databases, internal workflow systems, formalized version control systems, Internet and Intranet content, and most importantly dynamic business intelligence dashboards whose outputs are referenced through distributed hyperlinks rather than stored and persisted.
The entire EDRM workflow is highly inefficient. Massive productions result in over designation of confidential ESI, ongoing production delays, custodial productions that artificially limit custodians, productions that ignore large swaths of ESI that is not email or documents, productions that ignore the natural relationships between ESI, and cries of burden, burden, burden.
Neither the producing nor the receiving party benefit from these inefficiencies.
To fix what can only be described as a broken process, the pED Proportional EDiscovery Model emphasizes minimal processing, non-production of mutually agreed ESI of dubious relevance, but at the same time greater transparency along with interaction with native versions of ESI.
The pED Model is as follows:
Before we delve into the model, let’s talk about the three very significant changes in the Federal Rules of Civil Procedure.
Tackling Three Very Significant Changes in the 2015 Federal Rules of Civil Procedure
- Rule 26(b)(1) — scope of discovery should be “proportional to the needs of the case” (https://www.federalrulesofcivilprocedure.org/frcp/title-v-disclosures-and-discovery/rule-26-duty-to-disclose-general-provisions-governing-discovery/)
- Rule 26(c)(1)(B) — the court may determine the “allocation of expenses” associated with discovery in certain circumstances (https://www.federalrulesofcivilprocedure.org/frcp/title-v-disclosures-and-discovery/rule-26-duty-to-disclose-general-provisions-governing-discovery/)
- Rule 37(e) — “if [ESI] that should have been preserved in the anticipation or conduct of litigation is lost because a party failed to take reasonable steps to preserve it, and it cannot be restored or replaced through additional discovery …” a party moving for sanctions must show both that ESI “should have been preserved in the anticipation or conduct of litigation” and the other party “failed to take reasonable steps to preserve” as well as that the ESI “cannot be restored or replaced through additional discovery.” Then, and only then, “upon finding prejudice to another party from loss of the information, [the court] may order measures no greater than necessary to cure the prejudice” and only “upon finding that the party acted with the intent to deprive another party of the information’s use in the litigation may” find for sanctions. (https://www.federalrulesofcivilprocedure.org/frcp/title-v-disclosures-and-discovery/rule-37-failure-to-make-disclosures-or-to-cooperate-in-discovery-sanctions/)
In English:
Preservation, collection, review and production of voluminous ESI happening in litigation today is an unsustainable process with a looming expiration date.
Introducing A New Model: pED
Let’s revisit our pED Proportional EDiscovery Model.
Essential guiding principles
The pED Model is premised upon the following principles:
- Index first. Do not copy.
- Permit inspection of the index by the Receiving Party before production.
- Preserve only what is requested and reasonably expected to be produced.
- Selectively produce. Enable ad hoc production with on the fly redaction.
- Enable easy production updates with alerts.
- Full transparency in the production process.
There are four main parts to the pED Model:
- pED Index
- pED Inspection and Search
- pED in situ Preservation
- pED Selective Production
pED Index
The entire goal of the pED Proportional EDiscovery Model is to discourage unnecessary duplication of large quantities of ESI simply to preserve data. In the pED Model, the first step is the creation of a universal index. This may be done and maintained by the producing party in the ordinary course of their business or upon the reasonable anticipation of litigation or the start of litigation if it could not have been reasonably anticipated.
The pED Index is intended to be a universal index. Email, Files, Data Records, Chats, Digital Voicemails, Digital Webcasts, Documents under Version Control, etc. are all indexed.
The pED Index should not be duplicative of the underlying ESI material. It does not even have to be a single index. Where possible, it should hook into existing indexes of ESI. Where not possible, it should not be a full text index. It should maintain the capability to access and retrieve the indexed item.
Minimally each index entry should contain the following information:
- Unique Identifier
- Link to the Indexed Item (such that the link allows for digital retrieval)
- Hash Value of the Indexed Item (such that it can be authenticated as matching the index if the index falls out of date)
- Item Descriptive Name (ex: “email: <subject> from <from> sent <date>” or “file: <file name>” or “voicemail: from <name/number> received <date>”)
- Item Broad Category (ex: “Email,” “PDF,” “Word Document,” “Excel Spreadsheet,” “PowerPoint Presentation,” “Voicemail,” “Webcast,” “Data Record”)
- Item Sub Category (ex: “Word 2003” or “Embedded Object” or “Case Report Form”)
- Author(s)
- Date Created
- Date Last Modified
- Internal Classification Expressed As A Path (ex: “<category>/<sub-category>/<sub-sub-category>”
- Relativized Size (i.e. zero, x-small, small, medium, large, x-large, xx-large)
- Date Index Entry Last Updated
- Date Removed (see pED in situ Preservation section below)
- Privileged Flag (i.e. whether there is a legal privilege asserted)
- Protected Information Present Flag (i.e. whether the item contains information legally protected — for example patient health data)
- Subject to Preservation Hold Flag (i.e. whether a copy of the ESI is being maintained and/or the original ESI is frozen)
- (Optional) pED Tags
Emails would of course contain Subject, From, To, Cc fields. Other systems and applications would augment with additional fields as needed to represent the essential elements of the indexed item, but limited to only what is essential, not a comprehensive list of all that would exist.
pED Tags should be used to flag items known to be relevant to the issues in the litigation. They may also be used to flag ESI whose content matched a keyword or other highly relevant piece of algorithmically determined criteria.
For smaller cases, the pED Index can be as simple as a spreadsheet. For larger cases, more scalable technology solutions would be involved.
The exact nature of what would be in the pED Index should be decided by agreement of the parties or through Court Order; however, by definition it should not be limited solely to what would be considered responsive ESI, but rather should be broader than responsive ESI. The Receiving Party should always have the right to challenge the completeness of the pED Index.
Now for those Producing Parties who would object that the construction of the pED Index is unduly burdensome, the clear counter is that it is significantly less burdensome than the collection and review of irrelevant ESI.
The pED Index shall be updated regularly such that it is maintained to be as up to date as practicable.
pED Inspection and Search
The purpose of setting up the pED Index is to allow the receiving party to inspect and search the ESI of the Producing Party to request preservation and selective production of the relevant material proportionate to the needs of the specific case.
Through a Court Order or by Agreement of the Parties, the Producing Party should have complete assurance that the pED Index is inadmissible in any form, will not be electronically copied in full or in part by the Receiving Party, and will only be accessed and used by Counsel and Technical Representatives for purposes of EDiscovery assessment of relevance.
The Receiving Party should have full access to the pED Index through a secure connection over the Internet.
The Receiving Party next goes through a process of Search and Inspection to determine set(s) of ESI that are relevant or may be relevant to the case.
While Search is fairly self-explanatory, Inspection bears some additional notation.
The Inspection process should include the right to request samples (statistically relevant) of ESI in categories applicable to the litigation. Statistically relevant random sampling can be applied to a custodian, a time period, an Internal Classification or part thereof, or predetermined tagging. For the purpose of relevancy review smaller samples with 90% confidence levels and 5% margins of errors should be selected. If you do not have a sample size calculator handy, a sample of 270 documents should be sufficient to meet the above levels. This pED TAR process (Technology Assisted Review) is a winnowing and review process similar to what is done today during traditional document reviews.
ESI produced for the purposes of Inspection should be deemed inadmissible for any other purpose other than demonstrating relevance. The production of sample ESI should not be construed as a relinquishment of the Producing Party’s right to review for redaction and privilege prior to production.
At the end of this stage, the Receiving Party will have determined two sets:
- ESI that the Receiving Party wants to be preserved, but not necessarily produced.
- Relevant ESI that the Receiving Party wants to be preserved and produced.
Throughout the period of Discovery the Producing Party will ensure that the pED Index remains reasonably up to date and accessible to the Receiving Party. The Producing Party will reasonably allow the search and inspection to continue throughout this period.
For systems that are truly interactive, e.g. a business intelligence dashboard, the Inspection process should include inspections of the system itself, not just reports or excerpts of data.
pED in situ Preservation
In the pED Model, the strongly preferred method of ESI preservation is in situ or in-place rather than extraction.
Using security permissions, content can be locked or frozen as it is designated by the Receiving Party.
Get Jonathan Jaffe’s stories in your inbox
Join Medium for free to get updates from this writer.
After the pED Search and Inspection Phase, the Receiving Party will have input into which ESI should be preserved. Depending on the particulars and scope of the litigation, preservation might be applied to time periods, sets of custodians, combinations thereof, or specific ESI. The parties would meet and confer on what is to be preserved.
pED in situ Preservation is not synonymous with production.
Where necessary not to impact corporate operations, ESI may be copied, but this should be a last resort when in-place preservation is impossible or would result in substantially more burden.
Preservation selections would specify whether they needed to be extended to future ESI not yet generated, for example: if a custodian’s ESI was in the broadest sense specified to be under preservation, then subsequent ESI the custodian created would be automatically preserved in situ.
Where ESI is not under preservation, after the start of litigation, the pED Index would retain a record of ESI that was not preserved and the date that the ESI was changed or removed.
Under the pED Model, blanket preservation should be studiously avoided. Ideally, the set of ESI preserved, but not produced should be as small as possible. Preservation directives should take into account the likelihood that ESI is likely to be altered or removed and strive to have the minimal amount of ESI fall under preservation directives.
Nothing in the pED Model should be construed to relieving the Producing Party’s obligation to preserve relevant ESI, especially relevant ESI known to the Producing Party that has a high likelihood of alteration or removal; however, the pED Model does allow the Receiving Party a much greater voice in preservation, elevating ESI mutually agreed upon by the parties as subject to a preservation directive to a higher level.
pED Selective Production
The final phase in the pED Model is pED Selective Production. Not all the ESI tagged for preservation will be produced, just a subset agreed upon by the Producing and Receiving parties.
pED Selective Production is an iterative process. First the Producing Party produces ESI predetermined to be relevant. Then through a series of requests the Receiving Party requests productions from the preserved set.
Throughout the Discovery Phase of the Litigation, the Receiving Party can continue to Search and Inspect the pED Index, ask for augmentations to the Index (with cause), request additional preservation, and finally, request additional selective productions.
In a small case, there might only be one cycle. In a large, multi-year litigation, there are likely to be dozens of these cycles.
Prior to selective production, the Producing Party may conduct reviews for Privilege and Redaction.
Produced ESI must be produced with metadata referencing the corresponding ESI entries in the pED Index. The metadata produced for the ESI will minimally contain the metadata available at the time of production in the pED Index. Additionally, the metadata will be supplemented with fields that were omitted from the pED Index, when the ESI is produced in a near-native format, i.e. PDF/TIFF-Plus.
The prefered format of production in the pED Model is native. For many newer systems, production may be a form of enhanced access / inspection resulting in screenshots or reports as many systems today cannot have their data decoupled from the system itself.
Ultimately, in the pED Model, greater transparency should result in much smaller and more tailored productions.
Why the Socha-Gelbmann EDRM Model is No Longer is Sustainable
the status quo may be difficult to change, but it is not viable
While anxious lawyers might stay up at night wondering whether all of the relevant ESI in a litigation has been produced, the collection, preservation and production of copies of absolutely everything by the Producing Party is not a sustainable process, particularly with respect to emerging forms of ESI that do not easily allow for copying in a usable form.
> burden, burden, burden
> collect and preserve everything
> search term manipulation
> artificial custodial selection
> email thread suppression
> massive productions
> confidentiality designations
> non-native productions
> ongoing production delays
> out of order productions
Critically, the Socha-Gelbmann EDRM misses both accuracy and precision. Other than the general Request for Production, the Receiving Party is left out of the conversation about the Preservation, Collection, Search and Inspection of the ESI held by the Producing Party, which all occurs in an opaque process.
In the context of Discovery, accuracy refers to the presence in the production of all of the relevant ESI, while precision refers to the exclusion of ESI that is irrelevant to the litigation.
A small resultant production under the Socha-Gelbmann EDRM Model presumes that the Producing Party without full transparency and without input from the Receiving Party was able to determine all of the relevant ESI. Since the Receiving Party has no benefit of the knowledge of the full set of ESI held by the Producing Party, this is improbable to impossible.
So while a small production would be precise, it would not be very accurate.
That is why most productions under the Socha-Gelbmann EDRM Model are much larger than the set of truly relevant documents. As Receiving Parties are wont to say, “if you would only give me the 10–20 documents I need to prove my case, then I would not need the 10,000–100,000 I need to look through.”
There is a false assumption by the Receiving Party that large productions are indeed accurate, i.e. containing all of the relevant ESI.
Precisely because the productions under Socha-Gelbmann EDRM tend to be large and by definition contain irrelevant ESI, the Producing and Receiving Parties will artificially limit the set searched through keyword search terms and specific custodians to specific areas of ESI.
Since email, local and shared file systems are relatively easy to search and review, but collaborative tools, Intranet dynamic content, third party Cloud systems, big data, review systems, etc. are the most difficult, there is an overemphasis on systems that are perceived as the more accessible. Ultimately, that results in a production that feels accurate, but may be missing key parts of the electronic record omitted from search and review.
To be absolutely fair, when the Socha-Gelbmann EDRM Model was conceived, there were no Cloud Services, email was 90–95% of the method of communication, paper productions were still significant, local drives were still in wide use, and the dynamic content of internal systems was adequately represented by email or file content in all but the rarest of cases. In other words, the nature of ESI in the last decade has dramatically changed.
A Note About TAR (Technology Assisted Review)
TAR has gained widespread acceptance, introducing the concepts of sampling, precision, and recall to the EDiscovery conversation. Unfortunately, TAR is only as good as the manner in which it is applied. TAR does not yield accurate results where there are multiple targets within the same sample set. TAR conducted by the Producing Party even with review by the Receiving Party is subject to the same bias toward easily searchable and reviewable ESI materials without the Receiving Party having the benefit of full knowledge of the universe and nature of ESI held by the Producing Party.
In the pED Model, pED TAR can be applied as part of the pED Search and Inspection Phase. Through a pED TAR process, the ESI tagged for preservation and production can be significantly narrowed and tested for relevance. Unlike in the Socha-Gelbmann EDRM Model, the pED Index affords the Receiving Party insight into the universe and nature of ESI held by the Producing Party in advance of any pED TAR process; furthermore, a pED TAR process could be applied to multiple target sets of ESI independently.
Other Downstream Effects of the Socha-Gelbmann Model
burden, burden, burden — the Producing Party is producing such a volume of ESI that requests for additional ESI, even relevant ESI, can be parried with a familiar refrain of burden, burden, burden, which quite frequently is not a hyped concern. This often artificially confuses volume with relevance. Burden is not limited to the Producing Party. The Receiving Party is prejudiced by receiving large productions, which adversely affects smaller litigation especially by parties without deep pockets or the technical ability to accept and process large productions.
collect and preserve everything — by definition under the Socha-Gelbmann EDRM Model more is collected and preserved than is relevant ESI. This results in much time spent during the collection process copying and reviewing material that is clearly irrelevant ESI.
search term manipulation —subtle changes in search terms (when used) can result in markedly different sets. Stemming, treatment of white-space, foreign character treatment, use of synonymous terms, negation terms, etc. all are more art than science, especially when the Producing Party is not transparent about the nature and quantity of the ESI responsive to each term.
artificial custodial selection — when used custodians are selected imperfectly at the start of the litigation from organization charts that may not fully reflect the true custodians of ESI, which often include additional team members, assistants, and even non-corporal custodians, i.e. collaborative systems where ESI is not necessarily owned by individuals. The artificiality of the custodian selection results in a production that does not accurately include all of the relevant ESI. This process is also highly prejudicial against attorneys who do not have experience with a particular corporation’s internal structure, and favorable to those who do.
email thread suppression — email thread suppression is the removal from production of all prior email messages in a thread that are subsets of the most recent. While this results in smaller productions, the size difference is often not notable when expressed as a percentage of the overall production; furthermore, it allows the Producing Party to remove threads where later parts of the thread involve privilege claims, while not producing the prior messages. While in the minority, these messages are very relevant ESI.
massive productions — large productions of millions of pages slow down the pace of discovery and put unfair burdens on both the Producing and Receiving Parties subverting the purpose of Discovery.
confidentiality designations — with massive productions, the Producing Party often defaults to the over-designation of confidentiality of ESI. The American system of justice is not intended to be conducted in the shadows. Protective orders should not be used as blanket coverage for ESI clearly not of a confidential nature. Massive productions also unfairly place the burden on the Receiving Party to determine over-designations. Often it is against the self-interest of a Receiving Party to issue these challenges. Tailored productions allow better review.
non-native productions — massive productions necessitate homogenization of very different ESI. Whether as TIFF or PDF, this homogenization allows for the large scale review of produced ESI, but removes essential characteristics of the native ESI that may not be representable in the TIFF/PDF-Plus “near native” format. This divorcing of metadata from the native elements can corrupt the data, remove it entirely, and result in an improper winnowing of the fields where the some of the grain is removed with the chaff.
ongoing production delays — when dealing with large scale collection, preservation, review and production, there is a good amount of built-in delay. The Receiving Party is not able to get started on Discovery while these efforts are underway. Delays create unnecessary friction with overtaxed reviewers and vendors who are rushing to produce right up to production deadlines. This is bad for both parties. Inevitable production errors get passed along to the Receiving Party instead of being noticed and corrected by the Producing Party. Inconsistent redactions or missed redactions result in later clawbacks.
out of order productions — logic and relevance in the ordering of produced ESI often take a backseat to the velocity of the throughput of production under the Socha-Gelbmann EDRM Model. The Receiving Party cannot be assured as to the completeness of subsets of the production key to their case.
pED Model Strengths
The pED Model addresses many of the concerns of the courts in the move to proportional EDiscovery.
Key Benefits to the Producing Party
- No need to collect and preserve everything, just to maintain an index.
- Large reduction in cost producing ESI not desired by the Receiving Party.
- Large reduction in cost tackling homogenization of native material.
- Allows inspection of systems that are challenging to produce from so that the Receiving Party can reasonably narrow requests from these systems, without use of inspected material in the litigation.
- Transparency shifts burden to Receiving Party to demonstrate relevance.
- Substantially less risk of producing improperly reviewed and redacted material.
- Less risk of untimely responses to requests for production.
- Tailored productions resulting in smaller, proportionate EDiscovery.
Key Benefits to the Receiving Party
- Full transparency of all of the ESI held by the Producing Party.
- Inspection of ESI for relevance independent of Producing Party retaining the ability to approach Court on specific questions of relevance.
- Input and insight into the preservation of key ESI.
- Reduction of irrelevant ESI in productions.
- Sane production ordering.
- Shift from burden argument to relevance with smaller, tailored productions.
- Early insight and start on Discovery review through the pED Index.
- Vastly improved insight and understanding into the whole ESI landscape including better requests for production of systems in such a way that they will be familiar to deponents and witnesses rather than unfamiliar exports of data.
There are many additional benefits to those listed above.
Final Notes
The EDRM Model is very much a litigation-centric approach to EDiscovery.
The pED Model is a properly technology-centric approach to EDiscovery.
While EDiscovery will never be entirely unobtrusive and undisruptive, leaving ESI in place during examination for relevance will become the preferred method as copying and collecting ever growing stores of ESI becomes ever more impractical.
The pED Model is intended to be party neutral. It gives the Receiving Party more visibility and insight into the process for determining what ESI held by the Producing Party and ESI relevant to the litigation, while reducing the burden on the Producing Party to preserve, collect, review and produce large quantities of ESI that the Receiving Party would agree is not relevant, but may have been held by agreed upon custodians or hit on by overly broad keywords.
The pED Model requires more meet and confer by the parties. It also does not result in a static production. Although productions will be smaller, there may be more requests for production as the litigation proceeds. A production agreement between the parties should outline expected turnaround times and notice requirements.
While the pED Model would result in smaller productions, the burden is as always on the Producing Party to preserve and produce clearly relevant ESI irrespective of whether or not the Receiving Party had flagged that ESI for preservation and production.
EDiscovery conducted under the Socha-Gelbmann EDRM Model is not sustainable in the long term. While the rate of adoption to such a model as different as the pED Model, especially allowing for the time for technology to catch up on critical aspects such as a robust, automated pED Index, is a slow process, this paper is intended to lay out a technically minded approach to the future of EDiscovery.
If you choose to adopt the pED Model in your litigation, please let me know.
about me
Since 2000, I have been helping attorneys navigate rapidly changing technology landscapes supporting the needs of litigation from negotiating protocols for ESI production format to performing forensic gap analysis and analysis on esoteric database and system productions.
If you need assistance with the technological challenges surrounding EDiscovery, please reach out directly to jjaffe@its-your-internet.com.
(c) Copyright 2016. All Rights Reserved. Jonathan Jaffe, Founder,
www.its-your-internet.com.










