• 1 Post
  • 261 Comments
Joined 2 years ago
cake
Cake day: February 1st, 2024

help-circle


  • Yeah that’s the thing it’s all about the time release. Correct me if I’m wrong but vyvance big thing is that it… fuck I forgot it the most of it but it slowly release through the liver because of a extra molecule on the drug. This makes it that your body only sucks it up as needed. When blood levels drop. So allegedly its damn hard to overdose on vyvance. The larger doses are only for how long of a day last for. 40mg 8hrs 60mg 10hrs etc.



  • Loooool this fuck still thinking words work. Unionize… okay sure yeah keep suffering and starving for another few years while the ceo and union bosses sign the right paperwork, right after brunch. Oh wait there was a spelling mistake. They will have a meeting on when to schedule a fucking meeting to sign a new deal. But hey you can keep choosing between skiping a meal for 6 days this week or getting your kid winter coat. They definitely will sign a deal some time next month. To what only find a 5$ /hr increase in pay but 2.50 has to go to the union for all their “hard work”.















  • This is so wrong it’s absurd. I work on machinery. Heavy equipment, I’ve dicked around with industrial robots and hell I even have and use a 3 axis cnc mill from 1986.

    Most of the stuff that’s out there is reliable as time with very little maintenance required. Oil or grease movable joints. Top up oils, change oils every 1000hrs. It’s not hard or expensive to keep up on maintenance. Pay a premium and replace gear oil with PAG type oil, and you will never have to change that oil in your life.

    Machines just work, they don’t have feelings, they don’t take sick days, they don’t take lunches. And why they fuck are you buying equipment with out way to pay it off first. Build it, and they will come. It doesn’t work all too well when everyone and their grandma has a cnc shop these days.


  • I got a bit excited, because I have a 40ft with the exact same set up but with steel. To store round bar stock, pipe, square tube etc for metal work. It even had an over head crane to move stock in and out. It was awesome until some fuck decided to back an excavator into the front doors and sides. Mangled the whole thing to shit.